Permitting and Bidding Phase Sample Clauses

Permitting and Bidding Phase. Upon notification of the Owner’s approval of the Services performed by the Engineer under the Construction Documents Phase, and upon written authorization from the Owner to proceed, the Engineer shall: i. furnish the Contractor with one fully reproducible set of the Construction Documents, including working drawings and specifications for each bid package (assume four separate bid packages), complete as required for bid and construction purposes (for additional copies, see Section VIII, Additional Services); ii. identify all required permitting and noticing; submit all necessary documentation to Local and State jurisdictions as required by law; respond to all jurisdiction notices for correction or revision; coordinate Contractor assumption of permit responsibility iii. review published bid advertisement, instructions to bidders, and bid package in its entirety to make such recommendations for timely correction by addendum; respond in writing to Bidder inquiries, including substitution requests and requests for clarification; supply any written revisions to the Bid Documents as necessary to prepare a proper bid; iv. if requested, review the bids and assist in recommending the award of Construction Contract(s) for the Work; v. coordinate with the City of Klamath Falls to ensure that all plan review/building permit criteria are reflected in the final bid documents; vi. attend the pre-bid conference at the Project site; and vii. if the lowest acceptable bid exceeds the Direct Construction Cost allowance authorized by the Owner by ten percent (10%), then at the Owner’s request, and at no additional cost to the Owner, the Engineer shall modify the drawings and specifications in order that new bids may be solicited and a Construction Contract award made within said allowance, consistent with the requirements of Section I.F.4 above.
AutoNDA by SimpleDocs

Related to Permitting and Bidding Phase

  • Bidding Phase 2.8.1 The Professional, following the Owner's approval of the Construction Document Phase, shall assist the Owner in obtaining bids and in award and preparation of Construction Contracts. 2.8.2 The Professional shall attend the bid opening and furnish a suitably detailed tabulation sheet for recording the name of each Bidder, the Bidder's Certificate of Responsibility Number, Bid Security, Base Bid, Alternates, and remarks. The Professional shall furnish sufficient tabulation sheets for all in attendance. Immediately after receipt of bids, the Professional shall submit to the Owner a certified tabulation of all bids received, along with his recommendation as to Contract award. 2.8.3 The Professional, following the award of a Construction Contract, shall prepare and submit to the Owner, two (2) copies of updated Construction Documents (Plans/Specifications). Each copy shall be marked OFFICIAL CONTRACT DOCUMENTS and shall include an executed bid Proposal Form, Agreement Form, Contract Bond, Power of Attorney, Certificate of Insurance, all bulletins, Addenda, and supplemental Drawings. One (1) copy shall be retained by the Owner, one (1) copy shall be for the Contractor. Any other contract document guidelines will be distributed to the Professional at the bid opening. 2.8.4 The Professional shall also furnish the area and volume of the building computed in accordance with criteria of the American Institute of Architects; and the square foot and cubic foot costs of only the building, the mechanical system, the electrical system, special built-in equipment, and the total Project cost. 2.8.5 The Professional shall, unless waived by the Owner, also submit one electronic format copy of the updated Contract Documents (plans and specifications) in coordination with said Contract Documents in 2.8.3 above. Said electronic submittal to be submitted within thirty (30) days after award by Owner in .pdf format. The actual cost of the electronic submittal shall be paid by the Owner, with cost approval by the Owner before printing is ordered in accordance with 3.4.

  • CUTTING AND PATCHING The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • Bidding Process 3.1. Bidding shall generally commence based on the sequence of the lot being shown on the PAH Website. However the Auctioneer has the right to vary the sequence without having to give prior notice to the intended bidders. 3.2. It shall be the responsibilities of the E-bidders to login through PAH website to wait for the turn to bid for the property lot in which they intend to bid. 3.3. The Auctioneer has the discretion to set a new reserve price in the event that there is more than one (1) registered bidder. 3.4. The amount of incremental bid will appear on the website prior to the commencement of the auction. 3.5. Registered online Bidders shall start bidding online by pressing the BID Button using their own gadgets with internet connection. If your bid is the highest, it will be denoted by a Green Coloured Box otherwise it will be a Red Coloured Box The highest bid shall flash 10 seconds (subject to change) interval for four (4) times " Calling Once, Calling Twice, Last Call and Sold". E-bidders may submit their bid at any of these stages of biddings by pressing the BID button. The successful bidder's bid will be denoted by a green coloured screen. The highest bidder shall be declared as the successful purchaser upon the fall of the hammer. 3.6. In the event that there is no bid after forty(40) seconds from the time of commencement of the auction, the auction shall be aborted. 3.7. Any bid once entered by the registered online E-bidders shall be binding and the bid shall not be withdrawn or retracted in any manner whatsoever after the fall of the hammer. 3.8. Both the successful and unsuccessful bidders will be notified by the Auctioneer through the website and also via E-mail where further directions are given in order to conclude the sale of the auction property. 3.9. In the event of any dispute, the decision of the Auctioneer shall be final and binding on all bidders. 3.10. Unsuccessful E-bidders shall have the deposit refunded to the same bank account from which the deposit transfer was made within two (2) working days from the date of auction. 3.11. The information shown and/or prompted on the screen handled by the PAH website in regards to the auction in particular the increment of the bidding price during the bidding process and the declaration of the successful bidder shall be final and conclusive.

  • Training and Support Licensor shall offer installation support to the Licensee and each of the Members, including assisting with the implementation of any Licensor software. Licensor will provide appropriate training to Licensee and Member staff relating to the use of the Licensed Materials and any Licensor software. Licensor will offer reasonable levels of continuing support to assist Licensee and Members in use of the Licensed Materials, including providing help files and other appropriate user documentation in connection with the use of and access to Licensed Materials. Licensor will, at a minimum, make its personnel available by email, telephone or via the Web, or in person during Licensor’s regular business hours, Monday through Friday, for training and user access support.

  • BIDDING PROCEDURE 1.1 Sealed bid, (formal and informal), subject to Instructions and General Conditions and any special conditions set forth herein, will be received in the office of the Purchasing Division, 440 So. 8th St., Lincoln, NE 68508, until the bid closing date and time indicated for furnishing Lancaster County, hereinafter referred to as “County”, the materials, supplies, equipment or services shown in the electronic bid request. 1.2 Bidders shall use the electronic bid system for submitting bids and must complete all required fields. If you do not care to bid, please respond to the bid request and note your reason. 1.3 Identify the item you will furnish by brand or manufacturer’s name and catalog numbers. Also furnish specifications and descriptive literature if not bidding the specific manufacturer or model as listed in the specifications. 1.4 Any person submitting a bid for a firm, corporation, or other organization must show evidence of his authority so to bind such firm, corporation, or organization. 1.5 Bids received after the time and date established for receiving bids will be rejected. 1.6 The Bidders and public are invited, but not required, to attend the formal opening of bids. At the opening, prices will be displayed electronically and/or read aloud to the public. The pricing is also available for immediate viewing on-line. No decisions related to an award of a contract or purchase order will be made at the opening.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection. 1.3.2 This Agreement does not constitute an agreement to purchase or deliver the Interconnection Customer’s power. The purchase or delivery of power and other services that the Interconnection Customer may require will be covered under separate agreements, if any, or applicable provisions of NYISO’s or Connecting Transmission Owner’s tariffs. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity in accordance with the applicable provisions of the ISO OATT and Connecting Transmission Owner’s tariff. The execution of this Agreement does not constitute a request for, nor agreement to, provide Energy, any Ancillary Services or Installed Capacity under the NYISO Services Tariff or any Connecting Transmission Owner’s tariff. If Interconnection Customer wishes to supply or purchase Energy, Installed Capacity or Ancillary Services, then Interconnection Customer will make application to do so in accordance with the NYISO Services Tariff or Connecting Transmission Owner’s tariff.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!