Preliminary Construction Documents Sample Clauses

Preliminary Construction Documents. A preliminary draft of all Construction Documents, including a complete set of architectural drawings, site plan, complete sets of structural, mechanical, and electrical engineering drawings, and a complete set of specifications, but approximately fifty percent (50%) detailed.
AutoNDA by SimpleDocs
Preliminary Construction Documents. Tenant shall prepare, at Tenant’s sole cost and expense, preliminary drafts of construction drawings and specifications including complete sets of detailed architectural, structural, mechanical, electrical and plumbing working drawings (the “Preliminary Construction Documents”) for all Tenant Improvements desired by Tenant in the Premises, including, without limitation, communications and data cabling, roof-mounted antennae and/or satellite dishes, millwork, cabinetry, woodwork, interior and exterior signage, and customized fixtures. Tenant shall deliver the Preliminary Construction Documents to Landlord as such documentation is prepared by Tenant’s architect, through the schematic, design development and final construction drawings phases of the Preliminary Construction Documents. Landlord acknowledges that the Preliminary Construction Documents may be delivered to Landlord in partial packages relating to certain components of the Tenant Improvements to be installed in the Premises (a “Subphase”); provided, however that Landlord shall not be required to approve any partial package of Preliminary Construction Documents if such package does not contain sufficient information to allow Landlord to approve the portion of the Tenant Improvements identified in such partial package. The Preliminary Construction Documents shall (i) include architectural drawings and specifications for Tenant’s partition layout, reflected ceiling, telephone and electrical outlets, and finish schedule; and (ii) mechanical plans and specifications where necessary for installation of the air-conditioning system and ductwork and heating and electrical facilities. Tenant’s architect and engineer shall be responsible for designing the Tenant Improvements at Tenant’s sole cost and expense, subject, however, to reimbursement of such costs and expenses from the T.I.
Preliminary Construction Documents. The documents created after the Design-Builder’s evaluation of the Scope of Work and prior to preparation of the Design-Builder’s Construction Proposal as described in the Agreement. Product Data - Pictures, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Design-Builder to illustrate a material, product, or system for some portion of the Work. Product Data are not Design-Build Documents. Project – The preconstruction work authorized in writing by the City, and any construction work authorized in writing by the City pursuant to a GMP Amendment or an early work agreement, to complete design and construction work, if any, of a sewer interceptor between the City Water Reclamation Facility and the Plant Interceptor, or points farther west at the direction of the City, in Bend, Oregon and Deschutes County, Oregon. Rental Rate Blue Book - The book by that name, being the current edition of the year that the work is performed, published by Equipment Watch, Primedia Corp., 1735 Xxxxxxxxxx Xxxxx, Xxxxx 000, Xxx Xxxx, Xxxxxxxxxx, 00000. Xequest for Proposals – The information published by the City, titled North Interceptor Sewer Project soliciting proposals from third parties for completion of the Project. Samples - Physical examples of material, equipment, or workmanship which demonstrate and establish standards by which the Work will be judged. Samples are not Design-Build Documents. Scope of Work - The program for the Project set forth in Exhibit 3, which includes initial information about the Project. These documents shall be evaluated and refined by the Design-Builder to develop the Preliminary Construction Documents. Shop Drawings - Diagrams, drawings, illustrations, instructions, and other data submitted by the Design- Builder to illustrate some portion of the Work. Shop Drawings are not Design-Build Documents. Specifications - Those written technical descriptions of materials, equipment, systems, standards, and workmanship prepared by the Design-Builder and approved by the City in accordance with the Agreement. Subcontractor - An individual or firm having a direct or indirect contract with the Design-Builder or with any other Subcontractor at any tier for the performance of a part of the Work, including but not limited to the Designer. Substantial Completion - Completion of the Work, or a part of the Work designated by the City in writing, in accordance with this Contract, to the point where it ...
Preliminary Construction Documents. Preliminary Construction Documents is defined in Section 2.3.2.
Preliminary Construction Documents. Within Five (5) business days after the Effective Date, Project Manager shall provide the current revision of the following documents to Owner (together with any other documents Project Manager and Owner reasonably agree are necessary to document the preliminary design of the Project, the “Preliminary Construction Documents”), which shall be prepared by the Design Engineer and be consistent with the Preliminary Arrangements and, upon approval by Owner, shall be part of the Contract Documents: (a) major equipment lists, with sizes; (b) process flow diagram; (c) process design criteria and/or process description; and
Preliminary Construction Documents. The Developer shall prepare and submit Preliminary Construction Documents for Developer Improvements to the Agency for review and written approval within the time established in the Schedule of Performance, Exhibit B. The Preliminary Construction Documents should represent a further development of the Schematic Drawings and shall incorporate any Agency conditions for approval of the Schematic Drawings. The Preliminary Construction Documents shall generally include, but not be limited to the material described in the Scope of Development, Exhibit A. These Preliminary construction Documents shall be in sufficient detail and completeness to show that such improvements and the construction thereof will be in compliance with Development Requirements.

Related to Preliminary Construction Documents

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Construction Documents Phase Bidding or Negotiation Phase:

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.

  • Complete Agreement; Construction This Agreement, including the Schedules hereto, shall constitute the entire agreement between the Parties with respect to the subject matter hereof and shall supersede all previous negotiations, commitments and writings with respect to such subject matter. In the event of any inconsistency between this Agreement and any Schedule, the Schedule shall prevail. The rights and remedies of the Parties herein provided shall be cumulative and in addition to any other or further remedies provided by law or equity.

  • Description of the Transaction Documents The Transaction Documents will conform in all material respects to the respective statements relating thereto contained in the Offering Memorandum.

  • Acquisition Documents As of the Closing Date: (a) Borrower has furnished Bank with true, correct and complete execution copies of all Acquisition Documents. Borrower has taken all necessary corporate action to authorize the execution, delivery and performance of each Acquisition Document to which it is a party. (b) Borrower has complied with all applicable federal, state, provincial and local laws, ordinances, codes, rules, regulations and guidelines (including consent decrees and administrative orders) relating to the consummation of the Acquisition and all applicable waiting periods with respect to the transactions contemplated by the Acquisition Documents have expired without any action being taken by any competent governmental authority which restrains, prevents or imposes material adverse conditions upon the consummation of such transactions. (c) All necessary authorization, consent, approval, license, qualification or formal exemption from, and all necessary filing, declaration or registration with, any court, governmental agency or regulatory authority or any securities exchange or any other Person (whether or not governmental, and including without limit any shareholder, partner or member of an applicable party) required to be made prior to the closing of the Acquisition in connection with the execution, delivery and performance by Borrower, and to Borrower’s best knowledge, each other party to the Acquisition Documents to which Borrower or such other Person is a party, have been obtained and will be in full force and effect, and, to the knowledge of Borrower, are not the subject of any attack or threatened attack (in each case in any material respect) by appeal or direct proceeding or otherwise. (d) The execution, delivery and performance of the Acquisition Documents, and the consummation of the transactions contemplated thereby, are not in contravention of the terms of any indenture, material contract, instrument, any judgment, order or decree, to which Borrower is a party or by which it or its properties are bound, except, in each case, where such contravention could not reasonably be expected to have a Material Adverse Effect. (e) Borrower has not granted a collateral assignment of, or a security interest over the Acquisition Documents (other than in favor of Bank) and Borrower has not sold, transferred or assigned any Acquisition Document to any Person (other than to or in favor of Bank). (f) No Acquisition Document to which Borrower is a party has been modified, amended, altered or changed in any manner except in compliance with Section 7.12 of this Agreement, and to Borrower’s best knowledge, there are no unwaived defaults existing under the Acquisition Documents by Borrower that is a party thereto, or, to the best of the knowledge of Borrower, by any other party thereto.

  • Formation Documents With respect to the Issuing Entity, the Certificate of Trust and the Trust Agreement, (ii) with respect to the Grantor Trust, the Grantor Trust Certificate of Trust and the Grantor Trust Agreement, and (iii) with respect to the Depositor, the certificate of formation of the Depositor filed in Delaware, dated as of January 4, 2019 and the amended and restated limited liability company agreement of the Depositor, dated as of March 27, 2019, made by the Sponsor, as member.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Amendments to Transaction Documents Without the consent of the Agent, amend, modify or otherwise change any of the terms or provisions of any Transaction Document other than (i) supplements identifying Solar Loans to be transferred in connection with each transfer of Solar Loans and the related Solar Assets from time to time in accordance with the Sale and Contribution Agreement or this Agreement, (ii) amendments, supplements or other changes in accordance with the terms of the applicable Transaction Document, and (iii) amendments, supplements or other changes with respect to exhibits and schedules to any Transaction Document that would not reasonably be expected to have a material adverse effect on the value, enforceability, or collectability of the Collateral or adversely affect Collections.

  • Reference Information Documents 1.5.1 TxDOT has provided and disclosed to Developer the Reference Information Documents. The Reference Information Documents are not mandatory or binding on Developer. Developer is not entitled to rely on the Reference Information Documents as presenting design, engineering, operating or maintenance solutions or other direction, means or methods for complying with the requirements of the CDA Documents, Governmental Approvals or Law. 1.5.2 TxDOT shall not be responsible or liable in any respect for any causes of action, claims or Losses whatsoever suffered by any Developer-Related Entity by reason of any use of information contained in, or any action or forbearance in reliance on, the Reference Information Documents. 1.5.3 TxDOT does not represent or warrant that the information contained in the Reference Information Documents is complete or accurate or that such information is in conformity with the requirements of the CDA Documents, Governmental Approvals or Laws. Except as expressly set forth herein, Developer shall have no right to additional compensation or time extension based on any incompleteness or inaccuracy in the Reference Information Documents.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!