Scope of Tests Sample Clauses

Scope of Tests. The testing lab will be instructed to test for one or more dangerous drugs. Student athlete samples will not be screened for the presence of any substance other than an illegal or performance-enhancing drug or for the existence of any physical condition other than drug ingestion.
AutoNDA by SimpleDocs
Scope of Tests. The Tests at Site to be carried out and passed before taking over of the Works by the Administration shall be deemed to comprise two main stages of testing as follows: (i) Preliminary tests which are tests performed prior to rotation of, energizing at normal voltage or admission of normal water or air pressure to the main or ancillary Plant under test. (ii) The Tests on Completion which are tests to progressively prove the correct operation of complete ancillary systems and of the main Plant items. The Tests on Completion shall include, immediately following all other tests, a test of service performance including 50 hours running. Where appropriate, the plant shall be connected to the PEA power system. The test shall include a total of 50 starting, and stopping sequences. The service performance tests shall be completed without adjustment and without fault. This shall be a prerequisite for taking-over.
Scope of Tests. The testing lab will be instructed to test for one or more of the listed drugs. Lincoln Consolidated School District shall decide which drugs shall be screened, but in no event shall that determination be made after selection of students for testing. Student samples will not be screened for the presence of any substances other than a listed drug or for the existence of any physical condition other than drug intoxication.
Scope of Tests. One turbine on each loop and all Meteorology and Grid stations units of the wind power plant must be checked and verified for correct labelling and ID. SCADA data path test summary WTG identifier……………………………… Initiated event…………………………….… Initiated signal………………………….….. Yes No Correct turbine/error identification in error log Correct turbine/signal identification in 10-minute database Met Station identifier……………………………. Initiated signal………………………….….. Yes No Correct met. Station/signal identification in 10-minute database Grid Station identifier………………………….. Initiated signal………………………….….. Yes No Correct grid station identification in 10-minute database Test results recorded by: Test results approved by: ________________________________ ________________________________ Supplier Customer Date: _____________________ Date: _____________________ Check of the functionality of the fibre optic infrastructure High-quality workmanship when the SCADA installed on site is a prerequisite for a correct and accurate function of the SCADA communication system. When the SCADA system is installed, focus is on correct connection of each turbine, meteorology station, grid station etc. to the SCADA system via the fibre optic communication loops The objective of the fibre optic infrastructure test is to verify the functionality of the signal path from all turbines and other SCADA units supplied by the Supplier, as follows: · Fibre optic connections in each turbine · Fibre optic communication loops · Connections at the SCADA server switch The fibre optic infrastructure is checked by monitoring each unit in the SCADA Vestas Online Business program. To verify that communication with e.g. a turbine in the wind power plant takes place, the "Park Event Overview" window in Vestas Online Business is started. The turbine is monitored over a period of time enabling values such as wind speed to show variation. Wind speed data should be available and changing for all turbines. In order to verify variation and thus communication to each unit, the wind speed data are chosen as the sample value for wind turbines and meteorology stations. For grid stations, the active power value should be chosen. Fibre optic infrastructure test summary WTG identifier……………………………… Yes No Communication to wind turbine Met Station identifier……………………………. Yes No Communication to meteorology station Grid Station identifier……………………………. Yes No Communication to grid station Test results recorded by: Test results approved by:...

Related to Scope of Tests

  • SCOPE OF THE WORK The Contractor shall furnish all the materials, perform all of the Work, and do all things required by the Contract Documents.

  • Scope of the Project Under this Agreement, the scope of the Project (the “Scope of the Project”) shall mean and include: (a) construction of the Project Highway on the Site set forth in Schedule- A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D; (b) maintenance of the Project Highway in accordance with the provisions of this Agreement and in conformity with the requirements set forth in Schedule-E; and (c) performance and fulfilment of all other obligations of the Contractor in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement.

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Scope of Tender 1.1 The Procuring Entity as defined in the TDS invites tenders for supply of goods and, if applicable, any Related Services incidental thereto, as specified in Section V, Supply Requirements. The name, identification, and number of lots (contracts) of this Tender Document are specified in the TDS. 1.2 Throughout this tendering document: a) the term “in writing” means communicated in written form (e.g. by mail, e-mail, fax, including if specified in the TDS, distributed or received through the electronic-procurement system used by the Procuring Entity) with proof of receipt; b) if the context so requires, “singular” means “plural” and vice versa;

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Scope of Use The Fund will use the System and the Data Access Services only for the processing of securities transactions, the keeping of books of account for the Fund and accessing data for purposes of reporting and analysis. The Fund shall not, and shall cause its employees and agents not to (i) permit any unauthorized third party to use the System or the Data Access Services, (ii) sell, rent, license or otherwise use the System or the Data Access Services in the operation of a service bureau or for any purpose other than as expressly authorized under this Addendum, (iii) use the System or the Data Access Services for any fund, trust or other investment vehicle), other than as set forth herein, without the prior written consent of State Street, (iv) allow access to the System or the Data Access Services through terminals or any other computer or telecommunications facilities located outside the Designated Locations, (v) allow or cause any information (other than portfolio holdings, valuations of portfolio holdings, and other information reasonably necessary for the management or distribution of the assets of the Fund) transmitted from State Street’s databases, including data from third party sources, available through use of the System or the Data Access Services to be redistributed or retransmitted to another computer, terminal or other device for other than use for or on behalf of the Fund or (vi) modify the System in any way, including without limitation developing any software for or attaching any devices or computer programs to any equipment, system, software or database which forms a part of or is resident on the Designated Configuration.

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Scope of the Procurement II.1.1) Title

  • Scope of Collaboration As part of the collaboration, the Controllers will act as Joint Controller. The roles of the Controller and the associated tasks are specified in more detail in Appendix 1. If one party is solely responsible for a data processing operation, this party will implement all relevant data protection provisions on its own responsibility. However, such data processing procedures are not subject to this Agreement. Joint data processing and the type of Personal Data collected and processed within the framework of collaboration are specified in Appendix 1.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!