WEED CONTROL – BROAD SPECTRUM FUNGICIDE Sample Clauses

WEED CONTROL – BROAD SPECTRUM FUNGICIDE. A broad spectrum fungicide (such as Actizone RZ) may be required to be applied at the manufacturers recommended coverage rate (twice a year in December and June). All landscape chemical applications shall be applied as outlined in section 3 Turf edge chemical and section 4 Chemical application and equipment.
AutoNDA by SimpleDocs
WEED CONTROL – BROAD SPECTRUM FUNGICIDE. A broad spectrum fungicide (such as Actizone RZ) may be required to be applied at the manufacturers recommended coverage rate (twice a year in December and June). All landscape chemical applications (Items 3 – 5) shall be applied as follows: County of Orange OC Community Resources, OC Parks MA-012-14010231 So Cal Land Maintenance, Inc. File No.612742

Related to WEED CONTROL – BROAD SPECTRUM FUNGICIDE

  • Weed Control The tenant shall control all noxious weeds on the subject lands and maintain all summerfallow in a reasonably weed-free condition.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Communication during Parental Leave (a) Where an employee is on parental leave and a definite decision has been made to introduce significant change at the workplace, the employer shall take reasonable steps to:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!