Project Identifier definition

Project Identifier means a description of a project sufficient to identify such project.
Project Identifier. Highland Preserve Subdivision Storm water Practice: Wet Detention Basin #1 Location of Practice: All of Outlot 1 of Highland Preserve Subdivision: Owners of Outlot 1: Each owner of Lots 1-22 shall have equal (1/22) undividable interest in Outlot 1. Exhibit E Cross-Section A – A’ [Note: Show plan view of BMP with cross-section location clearly labeled and cross-referenced. On cross-section and plan view, clearly label all key components and elevations of the BMP. Also show outlet details. Map scale must be sufficiently large enough to show necessary details, but page size should not exceed 11” x 17”.] Figure 2 Elevation = 959.5 (sediment removal) Elevation = 956.0 (bottom of pond) Elevation = 962.5 (normal water/outlet elevation) Outlet Structure Detail Elevation = 967.0 Figure 3 Elevation = 964.5 Elevation = 965.0 (rock lined chute) Elevation = 962.5 (Bottom of 3” hole, covered with stone) Exhibit “F” Engineering/Construction Verification DATE: ______________________ TO:­­­­­­­­­­­­­ Public Works Department City of Oconomowoc FROM: __________________________________________[Project Engineer’s Name/Company] RE: Engineering/Construction Verification for the following project: Project Name: ________________________________________ Section _________________, City of Oconomowoc, Waukesha County Storm Water Permit # ________________________ Storm Water Management Practices: ________________________________________ _______________________________________________________________________ For the above-referenced project and storm water management practices, this correspondence shall serve as verification that: 1) all site inspections outlined in approved inspection plans have been successfully completed; and 2) the storm water management practice design data presented in Exhibit D, and the “as-built” construction documentation presented in Exhibit E comply with all applicable state and local technical standards, in accordance with the City of Oconomowoc Storm Water Management and Erosion Control Ordinance. [Must include one of the following two statements:]
Project Identifier means a description of a housing development project sufficient to identify such project.

Examples of Project Identifier in a sentence

  • Project identifier: a number unique to the CDM project activity for the Party of origin.

  • Project Identification: < Insert Project identifier such as Project name and number>.

  • This research was supported by the Intramural Funds of the US Department of Health and Human Services (E.V.K.), the Ministry of Education and Science of the Russian Federation Subsidy Agreement 14.606.21.0006 (Project identifier RFMEFI60617X0006; to S.A.S. and K.V.S.), and an NIH R01 Grant GM10407 (to K.V.S.).

  • The structure of the tables is as follows:LRTP Reference: Page reference to where the project can be found in the MAPO Long Range Transportation Plan.Route/System: Local jurisdiction responsible for the project and the route number where the project is occurring.Project Number: Project identifier.

  • The report shall include a list of completed projects with the following information: Project identifier.

  • Project identifier: this shall identify the specific CDM project activity for which the CERs are issued, using a number unique to the CDM project activity for the Party of origin.

  • Click the arrow to the right of a Project identifier to proceed to the project’s Facilities page.

  • Click a Project identifier to edit the name of a previously created project.

  • At the PAIS level, the critical outputs are the Producer-Archive Project identifier and the potential Producer Source identifiers that will be necessary in the header of all SIPs.– Define Content Information: at this step the Producer and the Archive agree on what kind of Digital Objects are to be transferred.

  • Table 4 includes the cluster’s Andromeda Project identifier (referencing Johnson et al.


More Definitions of Project Identifier

Project Identifier. “Sample” Project Project Size: 40 Acres Number of Runoff Discharge Points: 1 Watershed (ultimate discharge): Lowes Creek Watershed Area (including off-site runoff traveling through project area): 67 acres (26 acres off-site) Watershed Data Summary. The following table summarizes the watershed data used to determine peak flows and runoff volumes required to design wet detention basin #1. Note: If additional subwatersheds are included with project, duplication of this form should be used. Summary Data Elements Subwatershed A Subwatershed B (off-site) Pre-Develop Post-develop Pre-Develop Post-develop Watershed Areas (in acres) (see attached map) 41 acres 41 acres 26 26 Average Watershed Slopes (%) 2-8% 2-8% 3-6% 3-6% Land Uses (% of each) (see attached map) 75 ac. cropland 15 ac. brush 10 ac. woodland 110 ac1/2 ac. lots 5 ac. brush 5 ac. woodland 50% cropland 50% 1 acre lots 50% cropland 50% 1 acre lots Runoff Curve Numbers 68 x 75 ac. = 5100 30 x 25 ac. = 750 Xxx 5850/100 ac. RCN = 59 70 x 110 ac. = 7700 10 x 10 ac. = 100 Xxx 7800/120 ac. RCN = 65 RCN = 68 (state standard) RCN = 70 Conveyance Systems Types Grass Waterway 50% grass swale 50% storm sewer 100% bare channel 100% grass swale Summary of Average Conveyance System Data 8’ bottom/4:1 ss 2’ dpety/3% grade 2’ depth xxxxx/3% 40” r/c sewer/2% (see calcs.) 15’ (w) top 1’ (d) parabolic 2% grade 2’ deep standard road ditch 2% grade Time of Concentration (TC) (see attached map & worksheets) 1.1 hrs. .97 hrs. .74 hrs. .65 hrs. 25% of 2-yr. 24-hr. post-dev runoff volume N/A 2.29 ac. ft. N/A .19 ac. ft 1-year/24 hour Runoff Volume N/A (.2” x 60 ac.) 1.0 ac. ft. N/A (.34 x 10 ac.) .28 ac. ft. 2-yr./24 hour Peak Flow (see attached hydrographs) 11.2 cfs 14.3 cfs 5.1 cfs 3.2 cfs 10-yr./24 hour Peak Flow 21 cfs 32 cfs 18.4 cfs 18.4 cfs 25-yr./24 hour Peak Flow 38 cfs 73 cfs 29 cfs 11.3 cfs 100-yr./24 hour Peak Flow 78 cfs 91 cfs 53 cfs 21 cfs Practice Design Summary. The following table summarizes the data used to design wet detention basin #1. Design Element Design Data Site assessment data: (see attached maps) Contributing drainage area to basin (subwatershed A & B) 70 acres Distance to nearest private well (including off-site xxxxx) > 100 feet Distance to municipal well (including off-site xxxxx) > 1200 feet Well head protection area involved? No Ground slope at site of proposed basin Average 3% Any buried or overhead utilities in the area? No Proposed outfall conveyance system/discharge (w/distances) 35 ft. to C...
Project Identifier means the identification designation assigned by Transmission Provider to a completed New Service Request that includes a reference to the Cycle in which the New Services Request was deemed complete. Definition for “Project Identifier” added to the Tariff. It is a capitalized term but not defined. This change is consistent with the description of Project Identifier contained in Tariff, Part VII, section 315(A) and Tariff, Part VIII, section 412(A).
Project Identifier. Organization: Project Title: INDONESIA-26-15 Center for Islamic Economics and Business Universitas Indonesia Building economic arguments for tobacco tax reform in Indonesia Project Duration:
Project Identifier means, when an Application from a Project Developer or an Eligible Customer results in a valid New Service Request, in accordance with Tariff, Part VII, Subpart C, section 306 [or Part VIII, Subpart B, section 403], the assigned Project Identifier to such request as confirmed by Transmission Provider. For Project Developers and Eligible Customers, the Project Identifier will indicate the applicable Cycle, and will denote a number that represents the project within the Cycle. The Project Identifier is strictly for identification purposes, and does not indicate priority within a Cycle.
Project Identifier. Lakeland Xxxxx Condominium Acres:5 7 . 7 Map Produced by: Xxxxxxxxxx Engineering Legal Description: Part of the Northeast 1/4 of Section 22, Town 1 North, Range 4 East, Village of Pinckney, Livingston County, Michigan, being more particularly described as follows: Commencing at the East 1/4 Corner of said Section 22; thence along the East line of said Section 22, N 04°09’02” W, 157.38 feet, to a point on the North line of the MDNR Right-of-Way (100 feet wide and Former Grand Trunk Railroad), said point also being the POINT OF BEGINNING of the parcel to be described; thence continuing along said North line of the MDRN Right-of-Way, S 89°47’10” W, 2199.10 feet; thence N 04°06’54” W, 1139.64 feet, to a point on the North line of the South half of the Northeast 1/4 of Section 22; thence N 89°28’06” E, 2197.59 feet, along the North line of the South half of the Northeast 1/4 of Section 22 to a point on the East line of said Section 22; thence along the East line of Section 22 S 04°09’02” E, 1151.91 feet to the Point of Beginning. Containing 57.7 acres, more or less and subject to any easements and restrictions of record. (Taxation Parcel Nos. 4714-22-200-004 and 4714-22-200-005). EXHIBIT B – Location Map Stormwater Management Practices Covered by this Agreement . The stormwater management practices covered by this agreement are depicted in the reduced copy of a portion of the site plans, as shown below. The practices include All of the noted stormwater management practices are located within a drainage easement as shown in Exhibit B-1. Project Identifier: Lakeland Xxxxx Condominium Stormwater Practices: Location of practices: Bounded and Described as follows: See Exhibit B-1 EXHIBIT B-1 – Storm Water System Maintenance Easement STORM WATER EASEMENT – LEGAL DESCRIPTION EXHIBIT B-1 (CONT’D) [MAP] EXHIBIT C – Storm Water Practice Maintenance Plan This exhibit explains the basic function of each of the stormwater practices listed in Exhibit B and provides the minimum specific maintenance activities and frequencies for each practice. The maintenance activities listed below are aimed to ensure these practices continue serving their intended functions in perpetuity. The list of activities is not all inclusive, but rather indicates the minimum maintenance that is expected to be performed for these practices. Vehicle access to the stormwater practices is shown in Exhibit B. Any failure of a stormwater practice that is caused by lack of maintenance will subject the Lakel...

Related to Project Identifier

  • Unique identifier means a number or other identifier assigned by protocols established by the Nationwide Mortgage Licensing System and Registry.

  • Unique item identifier means a set of data elements marked on items that is globally unique and unambiguous. The term includes a concatenated unique item identifier or a DoD recognized unique identification equivalent.

  • Biometric identifier means a retina or iris scan, fingerprint, voiceprint, or scan of hand or face geometry.

  • Unique item identifier type means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html.

  • legal entity identifier means a unique identification code assigned to the person

  • identifier means information that a user:

  • Registry identification card means a document issued by the department pursuant to [section

  • Project Data means all proprietary data of the Project generated out of the Project operations and transactions, documents and related information including but not restricted to user data which the Bidder obtains, possesses or processes in the context of providing the Services to the users pursuant to this RFP including the SLA;

  • DoD item unique identification means a system of marking items delivered to DoD with unique item identifiers that have machine- readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.

  • Baggage Identification Tag means a document issued by the carrier solely for identification of checked baggage, part of which is given to the passenger as a receipt for the passenger’s checked baggage and the remaining part is attached by the carrier onto a particular piece of the passenger’s checked baggage.

  • Sites means the area(s) upon or in which the construction work is carried on, and such other areas adjacent thereto as may be designated by the Commissioner.

  • Project IPR means all Intellectual Property Rights that arise or are obtained or developed by either party, or by a contractor on behalf of either party, in respect of the Deliverables in the course of or in connection with the Project;

  • Development Area means that area to which a development plan is applicable.

  • Proper identification as used above, means information generally deemed sufficient to identify you, which includes documents such as a valid driver’s license, social security account number, military identification card, and credit cards. Only if you cannot identify yourself with such information may the ICRA require additional information concerning your employment and personal or family history in order to verify your identity.