Bridging Documents Sample Clauses

Bridging Documents. The documents included in the Design Criteria Package as defined in Texas Government Code Section 2269.358.
AutoNDA by SimpleDocs
Bridging Documents. Upon written authorization from the District to proceed with the Bridging Documents Phase, based upon accepted deliverables from the preceding phase, the Bridging Architect shall perform Bridging Document Phase Services for District as follows: Bridging Architect shall assemble the approved Schematic Design Documents including drawings, Performance Standards, outline specifications and Basis of Design into a comprehensive package. Provide drawings, outline specifications and other documents that indicate the scope of work included in the bid package with sufficient detail to enable preparation of an accurate proposal by Proposing Design-Build Team and which will guide the Design-Build Entity to design and construct the Project. Included, but not limited to the following, descriptions of minimum requirements for a Bridging Documents submittal, which shall be augmented as necessary to show design intent.
Bridging Documents. Produce required documents for giving uniform quantitative and qualitative information & direction to DBE teams to establish Bid Pricing (GMP). Information also required for establishing accurate cost estimates prior to issuing. Documents to include concept representative floor & tier plans, connection to existing facilities, conceptual sections, updated outline technical specifications, any design narratives, detailed space lists, finishes, interior built-ins, electronic security, data, fire, ceiling plans, conceptual lighting preliminary code reviews etc. ● Prepare building and site models for County review, including sightlines, massing, adjacencies, to allow informed decisions. ● Design special electrical systems and security hardware, fixtures, electrical, low voltage, panels, GUI, data, video, and radio. ● Produce required documents for giving uniform quantitative and qualitative information & direction to DBE teams to establish Bid Pricing. ● Prepare proposed site parcel concepts and access to public right of way and utility infrastructure. ● Produce engineering documents to indicate building & site connection points & suggested runs for disciplines. ● Prepare preliminary specifications with preferred systems & compatible products. ● Packaging & distributing electronic CAD and REVIT drawings for distribution to the DBEs if requested. ● Review Bridging Documents with CDCR and BSCC. ● Review Bridging Documents with State Fire Marshal. ● Prepare project, building, and site cost estimates, including labor and materials, market factors, contingencies, allowances, etc. ● Adjust project/scope if needed based on cost estimate. ● Coordination of documents to any special FF&E requirements or equipment. ● Prepare procurement documents including submittal requirements, bid form, and scoring criteria. ● Prepare CDCR and BSCC documents including scope letter, budget summary table, side by side 3P estimate, and timeline. ● Contract agreement provided by Owner with Xxxxx assist. ● Division 00 & 01 by Owner, with Xxxxx assist. PD 96 $ 180.00 $ 17,280.00 PM 80 $ 165.00 $ 13,200.00 Architect 1 475 $ 185.00 $ 87,875.00 Architect 2 0 $ 165.00 $ - BIM Technician 1 0 $ 150.00 $ - BIM Technician 2 914 $ 115.00 $ 105,110.00 Estimating 48 $ 160.00 $ 7,680.00 Scheduling 8 $ 155.00 $ 1,240.00 Administrative 40 $ 100.00 $ 4,000.00 Siskiyou County AB900 Jail Bridging Documents Proposal October 1, 2019 Engineering Consultants Lump Sum $ 171,500.00 Total Staffing Costs 1,661 $ 407...
Bridging Documents. The Final review will only require electronic comments from the client. Those comments will be reviewed and incorporated into the Bid Package set.
Bridging Documents. Information regarding requirements for, and limitations of, the Project including a written program which shall set forth TFC’s objectives, constraints, and criteria including schedule, space requirements and relationships, flexibility and expandability, special equipment, systems sustainability, site access, and site requirements;
Bridging Documents documents prepared by the Master Architect, which set forth the scope of the project. The Bridging Documents include the Design Criteria, Specifications, and Drawings.

Related to Bridging Documents

  • Supporting Documents The Company shall have received the following:

  • Supporting Documentation Upon request, the HSP will provide the LHIN with proof of the matters referred to in this Article.

  • Bidding Documents The Construction Documents, the Invitation to Bid, the Instructions to Bidders, the Bid Form, and all Addenda, upon which the Bidder submits a Bid.

  • Agreement Documents 1. This Agreement consists of the following documents:

  • Bridging 2.5.1 Notwithstanding section 130 of the Labour Relations Code, when a notice to commence central bargaining has been served, a collective agreement in effect between the parties at the time of service of the notice is deemed to continue to apply to the parties, notwithstanding any termination date in the collective agreement, until

  • Procurement Documents Languages in which the procurement documents are officially available: English Languages in which the procurement documents (or their parts) are unofficially available: English Address of the procurement documents: xxxxx://xxx.xxxxxxxx.xxx.xx/xxxx/cft/xxxxXxxxxxxxXxxxxxxxx.xx? resourceId=3557381