Outline specifications Clause Samples

POPULAR SAMPLE Copied 1 times
Outline specifications. 1 Organized according to the Specification Section numbering system specified in the Construction Specifications Institute's current edition of Masterformat on the date of execution of the Contract.
Outline specifications. The Consultant shall prepare three (3) copies of preliminary outline specifications of the Project, and shall deliver them in the form prescribed by the Department. The preliminary outline specifications shall provide a general description of each of the divisions of the specifications for the structure, materials, mechanical and electrical systems, and such other work as may be required.
Outline specifications. Following approval of the T.I. Outline Specifications, Landlord shall cause its project architect, Design Collective, Inc. (the “Project Architect”) to prepare and deliver to Tenant for Tenant’s approval (which it shall not unreasonably withhold or delay) within twenty (20) days after Landlord’s approval of the T.I. Outline Specifications as set forth above in Section 2(a), any and all necessary construction, documents for the Tenant Improvements in the Demised Premises, including but not limited to, 1/4” architectural, mechanical and electrical working drawings to scale together with specifications necessary to complete such Tenant Improvements. The construction documents will be prepared based upon the T.I. Outline Specifications, and shall in all material respects be consistent with the development of such TX Outline Specifications. If Tenant has any objections or comments with respect to such construction documents, working drawings and
Outline specifications. Specifications shall include the scope of work outline for tenant improvements, instructions to bidders and special conditions incorporating the AIA standard form of general conditions.
Outline specifications. Narrative description of and performance criteria for all principal construction materials and systems proposed for the project, including exterior and interior building materials and finishes; structural system; plumbing and piping systems and fixtures; HVAC systems including major equipment items and control systems; lighting concept and fixture types; electrical power and telecommunications systems; and other significant building or site components.
Outline specifications. If Tenant has any objections or comments with respect to such construction documents, working drawings and specifications (including interior finishes), it shall notify Landlord and the Project Architect in writing of such objections within five (5) days after receipt thereof or Tenant shall be deemed to have approved such documents drawings and specification. Provided that such Tenant objections and comments are consistent with the Project Scope, Landlord shall cause the Project Architect to make the requested changes and modifications to the construction documents, working drawings and specifications, and shall resubmit to Tenant the modified construction documents, working drawings and specifications (including interior finishes), which shall be subject to the same review, approval and modification procedures set forth above. The final construction documents, working drawings and specifications (including interior finishes) for the Expansion Space Tenant Improvements approved by Tenant, shall be referred to as the “Expansion Space T.I.
Outline specifications a. Organized according to the Specification Section numbering system specified in the Construction Specifications Institute's 1995 (or later) edition of MasterFormat current on the date of execution of the Contract. b. Formatted to conform to the formats for outline specifications as established by the Construction Specifications Institute's Manual of Practice (latest edition). c. Complete for Divisions 2 through 16 documenting project decisions and giving general description of all finishes, materials, and systems including civil, structural, HVAC, electrical, plumbing, and specialty items, including fire sprinklers, alarm systems, electronic controls and computer networking components. d. Supplement (but do not replace) outline specification sections with “cut- sheets”, product information, data, and samples as requested by Contract Administrator or as necessary to communicate Consultant's design intent to the Contract Administrator. e. Provide content edited on a project specific basis for the project described in this agreement. Outline specifications reflecting Consultant's other or past projects submitted in an unedited or partially edited form obvious to the Contract Administrator will be returned un-reviewed to Consultant. For any such returned outline specifications, Consultant shall prepare and re-submit at no additional cost to County replacement outline specifications edited to specifically describe the project described in this agreement. (C) Florida Energy Efficiency Code for Building Construction (FEEC). FEEC forms, including calculations for mechanical systems, documenting energy efficiency ratio rating of HVAC equipment, electrical systems, insulation, and building envelope shall be submitted to the Contract Administrator for review and approval with the Phase II documents. (D) Consultant shall advise Contract Administrator of any adjustments to the Schematic Design Phase estimate of probable construction cost. If, in the Contract Administrator's sole opinion, the project merits a design development phase estimate prepared by an independent cost estimator, then Contract Administrator may authorize Consultant to obtain those independent cost estimating services as an Optional Service expense. (E) An updated Project Development Schedule reflecting development and anticipated schedules for all subsequent project activities. (F) A letter from Consultant and each of the major technical disciplines and any necessary Subconsultants explaining how...
Outline specifications. If Tenant has any objections or comments with respect to such construction documents, working drawings and specifications, it shall notify Landlord and the Project Architect in writing such objections within five (5) days after receipt thereof or Tenant shall be deemed to have approved such documents, drawings and specifications. Landlord shall cause the Project Architect in writing to make the requested changes and modifications to the construction documents, working drawings and specifications, and shall resubmit to Tenant and the Review Architect the modified construction documents, working drawings and specifications, which shall be subject to the same review, approval and modification procedures set forth above. The final construction documents, working drawings and specifications for the Tenant Improvements approved by Tenant, shall be referred to as the “T.I.
Outline specifications. Shell Building Improvements The specifications set forth in this document are subject to modification from time to time as determined to be necessary or appropriate by Irvine Company. Shell building improvements are to be provided by Irvine Company during the shell building improvement phase, unless noted otherwise. Any Tenant changes will be at Tenant’s cost and responsibility, and will be subject to Irvine Company approval. Buildings utilization voltage will be 277/480 volt, 3-phase, 4-wire with ampacity as required to accommodate square footages and loads. Loads shall be based on the following: · Lighting: 0.5w/sqft · Plugs: 0.3w/sqft · Mechanical: 0.7w/sqft · Elevators: 0.2w/sqft · Total for Building: 1.7w/sqft Electrical service size of the Parking Structure is 1,200 amp. The PG&E service transformer will be from an underground distribution vault known as a UCD. The UCD vault can house up to a 1000kva in-ground vault style transformer, which would max out at a 1200amp, 277/480volt, 3-phase, 4-wire service. The secondary service entrance conductors will be installed under the core & shell construction, from the transformer vault to the main switchboard. The main switchboard will be 1200amp, 277/480volt, 3-phase, 4-wire and shall serve all building loads. Distribution within the Building will consist of a feeder to the roof for elevator equipment loads, and 277/480volt panelboard, step-down transformer, and 120/208 volt panelboard for building lighting and plug loads on every other floor. Service entrance from the telecommunication companies shall consist of one (1) 4” underground conduit from AT&T. Conduits shall be routed from site service provider infrastructure to the main electrical room at the ground level of the building. Additionally, there shall be one (1) 4” conduits provided from the main electrical room out to a site wide building interconnect infrastructure. Pathline Park: Outline Specifications – Shell Building Improvements The specifications set forth in this document are subject to modification from time to time as determined to be necessary or appropriate by Irvine Company. Shell building improvements are to be provided by Irvine Company during the shell building improvement phase, unless noted otherwise. Any Tenant changes will be at Tenant’s cost and responsibility, and will be subject to Irvine Company approval. The fire alarm system shall be a microprocessor-based direct wired, multi-priority, peer-to-peer networked system. The syst...
Outline specifications. Attached as Exhibit B-1 are the preliminary site plans and outline specifications and elevations for the construction of the shell of the Building (the "Shell Building") which are hereby approved by Landlord and Tenant (the "Outline Specifications").