Contractor References Clause Samples

The Contractor References clause requires the contractor to provide information about previous clients or projects as evidence of their experience and reliability. Typically, this involves submitting a list of past projects, client contact details, or reference letters, which the hiring party may use to verify the contractor’s qualifications and performance history. This clause helps the client assess the contractor’s suitability for the work and mitigates the risk of hiring an unqualified or unreliable contractor.
Contractor References. After the bid opening, and prior to awarding the contract, the Department has the right to request references (name, addresses and telephone numbers) of similar work performed in the previous two (2) ears as proof of qualifications to perform the work involved in this contract.
Contractor References. (In performing this contract, the Contractor is referred to, but not limited to, the following documents):  MIL-STDS, MIL-SPECS, and Instructions at ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇.▇▇▇/app_uil/SpecsAndStandards.aspx  Navy Modernization Program (NMP) Manual SL720-AA-MAN-030 at ▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇.▇▇▇/  NAVSEA Technical Specification 9090-310 (revision) at ▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇.▇▇▇/  NAVSEA Standard Items at ▇▇▇▇://▇▇▇.▇▇▇▇▇▇.▇▇▇▇.▇▇▇/CNRMC/SERMC/SSRAC1/standard.aspx  NAVSEA C9210.4 (revision) - All non-nuclear work on nuclear powered ships must be in strict compliance with the Naval Sea Systems Command Instruction (classified instructions under separate cover)  Applicable SC Documents (SCDs)/Ship Alteration Records (SARs) provided by NSWCPD SME  Applicable Ship's Installation Drawings (SIDs) and Sketches provided by NSWCPD SME  NAVSEA S9AAO-AB-GSO-010/GOS, General Specification for Overhaul of Surface Navy Ships  NAVSEA S9AAO-AA-SPN-010/GEN SPEC, General Specifications for Ships  CINCLANTFLT/CINCPACFLTINST 4790.3, Joint Fleet Maintenance Manual (JFFM)  MIL-STD-1310, (Navy) Bonding and Grounding  NAVSEA S9300-AW-EDG-010, Electrical Plant Installation Standard Methods (EPISM)  NAVSEA Technical Publication S9074-AQ-GIB-010/248, Requirements for Welding and Brazing Procedure and Performance Qualification  NAVSEA Technical Publication S9074-AR-GIB-010/278, Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure Vessels  MIL-STD-1689A, Fabrication, Welding and Inspection of Ship Structures  NAVSEA Technical Publication 59074-AR-GIB-010/1688, Requirements for Fabrication Welding and inspection of Submarine Structure.  ISO-9001 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇  ISO-9002 Quality Systems - Model for Quality Assurance in Production, Installation and Servicing ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇ 2.1 Joint Fleet Maintenance Manual (JFMM) – CINCLANT/CINCPACFLTINST 4790 (series).
Contractor References.  List five (5) or more commercial grid-connected PV projects installed in the United States over the last five years. Include for each project: o Exact role(s) your organization performed for the project (e.g. material supplier, lead o contractor, electrical subcontractor, design, consulting, etc.). o Location. o Application description. o Product name/type. o Customer name and contact information. o Date installed. o Project cost. o PV module used. o KWp rating. o Cumulative kWh produced since system installation. o Current operational status of system.  Provide actual system data for five (5) of the grid-connected projects that demonstrates 90% or better availability of the PV projects used as customer references.  Proposals shall demonstrate a proven, robust data acquisition system that includes tracking of site-specific actual kWh production and actual meteorological data including tracking of solar irradiance, ambient temperature, and module temperature, with data available remotely.  Proposals shall provide evidence that the proposed technology and equipment would meet or exceed all currently applicable and proposed safety and interconnection standards. All equipment components must be UL certified, and meet existing facility structural and fire safety requirements.  Proposals shall provide evidence that the proposed technology and equipment would meet or exceed all currently applicable and proposed environmental standards.
Contractor References. Bidders shall provide three (3) references from previous planting contracts with the Commonwealth of PA from within the past 5 years. These references should include the name of the contracting agency, the year of the contract, the contract number, and the name of the state employee responsible for overseeing the project, and a telephone number if possible.
Contractor References. If you have not held a contract with the Owners for the last 3 years for similar projects you must provide (3)three references for contracts similar in nature to the work required in this project. Each reference must include the following: Owner: Street Address: City: State: Zip: Name Owners Representative: Phone: Contract Amount: INFORMATION SHALL BE ATTACHED TO THE RESPONSE ATTACHMENT SECTION OF YOUR EBID. (YES) We agree to provide the requesting agency or the City/County Purchasing department with "Quick Quotes" for all projects as requested. Quick Qoutes are due back to the requesting agency or department within 24 hours of request. Quick Quotes will be required for quantities that exceed the amounts listed in the Line Item section of the Ebid. Yes (Yes) What would the price be for a two (2) color print for all the envelopes? Prices are quoted in Line Items If an agency provides a disk with print files, will there be any set-up or change-order fees? If yes, what are they and specify why you are charging this fee. No