Final Drawings Sample Clauses

Final Drawings. If necessary for the performance of the Work and to the extent not already included as part of the Initial Plans attached hereto, Landlord shall prepare or cause to be prepared final working drawings and specifications for the Work (the “Final Drawings”) based on and consistent with the Initial Plans and the other plans, specifications, drawings, finish details or other information furnished by Tenant or Tenant’s Representatives to Landlord and approved by Landlord pursuant to Section 3 above. Tenant shall cooperate diligently with Landlord and Landlord’s architect, engineer and other representatives and Tenant shall furnish within ten (10) days after any request therefor, all information required by Landlord or Landlord’s architect, engineer or other representatives for completion of the Final Drawings. So long as the Final Drawings are substantially consistent with the Initial Plans, Tenant shall approve the Final Drawings within ten (10) days after receipt of same from Landlord. Landlord and Tenant shall indicate their approval of the Final Drawings by initialing each sheet of the Final Drawings and delivering to one another a true and complete copy of such initialed Final Drawings. Tenant’s failure to approve or disapprove such Final Drawings within the foregoing ten (10) day time period, shall be conclusively deemed to be approval of same by Tenant. If Tenant reasonably disapproves of any matters included in the Final Drawings because such items are not substantially consistent with the Initial Plans, Tenant shall, within the aforementioned ten (10) day period, deliver to Landlord written notice of its disapproval and Tenant shall specify in such written notice, in sufficient detail as Landlord may reasonably require, the matters disapproved, the reasons for such disapproval, and the specific changes or revisions necessary to be made to the Final Drawings to cause such drawings to substantially conform to the Initial Plans. Any additional costs associated with such requested changes or revisions which result in total construction costs exceeding the Tenant Improvement Allowance shall be paid for solely by Tenant, as the Excess Tenant Improvement Costs (defined in Section 10 below), either as part of the Amortized Excess TI Costs and together with those other sums amortized over the initial term of the Lease, or in cash upon written demand therefor by Landlord. Any changes or revisions requested by Tenant must first be approved by Landlord, which appro...
Final Drawings. 4.1 Contractor shall provide Record Drawings for the entire Project, consisting of mechanical, electrical, and civil drawings, general arrangements, instrumentation diagrams, one-line, three-line, schematics, wiring, cable tray, routed conduit, and duct banks, and other drawings as mutually agreed upon by Owner and Contractor. Documents shall be re-drafted as necessary to incorporate final information. Xxxx-up sketches, referencing, and other field marking techniques are not acceptable as final Record Drawings. Contractor shall prepare “conformed to construction record” of the original drawings or data sheets. 4.2 During construction, Contractor shall maintain on file in the field reasonably current as-built redline xxxx-ups of all drawings and data sheets to agree with actual work undertaken. 4.3 Record drawings shall be issued by Contractor as the next sequential revision from previous releases. The revision block shall state Record Drawings. All clouds, revision diamonds, and other interim control marking shall be removed. All information listed as “later” or “hold” shall be completed or deleted. The conformed to construction record drawings shall be clear and readable in full size, and where possible, also in 11”x17” size reduction. 4.4 Major Subcontractors' drawings shall be conformed to construction records to reflect actual installed configuration. These Subcontractor drawings shall be in sufficient detail to indicate the kind, size, arrangement, weight of each component, and operation of component materials and devices, the external connections, anchorages, and supports required; the dimensions needed for installation, and correlation with other materials and equipment. Final Subcontractor's drawings shall be bound in the equipment Operation & Maintenance Manuals. One electronic copy, in portable document format (*.pdf), of the vendor drawings shall be provided. 4.5 Contractor shall provide one hard copy set of Record Drawings to Owner, in 12”x18” size.
Final Drawings. Upon completion of the Work and prior to final acceptance, Developer shall deliver to City a set of “as-built” drawings consistent with the Conditions. These drawings shall be in a form acceptable to the City Engineer, shall be certified as being “as-built” and shall reflect the Work as actually constructed, with any and all changes incorporated therein. Said drawings shall be signed and sealed as accurate by the engineer of record.
Final Drawings a. The Concessionaire shall submit to the Authority and the Independent Engineer one detailed and legible copy each of “Final” records and drawings of the execution of each section of the Works, showing the exact final locations, sizes and details of the Work as executed and completed with cross references to all relevant requirements and data sheets. b. The Concessionaire shall ensure that the Authority has the right to use and protect the design from infringement and to further enforce such right against any person, in accordance with the terms of this Concession Agreement. c. This Article shall also be applicable if any new Works, strengthening, rehabilitation of any part of the Ecotourism & Adventure Park are carried out during the Operation and Maintenance Period. The Concessionaire shall keep one set of Final Drawings at Project Site for the entire Concession Period.
Final Drawings a. Update drawings to reflect review comments. Review comments will be incorporated into the final drawings. b. Provide final quantity calculations. c. Prepare Pay Item Work Sheet. d. Submit Structure Drawings to STATE’s Bureau of Bridges and Structures. This submittal will include Structure Drawings, design and quantity calculations, structural special provisions, and Pay Item Work Sheet. e. Submit drawings and specifications to STATE.
Final Drawings a. The Concessionaire shall submit to the Authority and the Independent Engineer 1 (one) detailed and legible copy each of final records of the execution of each section of the Works, showing the exact final locations, sizes and details of the Work as executed and completed with cross references to all relevant requirements and data sheets. b. The Concessionaire shall ensure that the Authority has the right to use and protect the design from infringement and to further enforce such right against any person, in accordance with the terms of this Concession Agreement. c. This Article shall also be applicable if any new Works, strengthening, rehabilitation of any part of the Circuit House are carried out during the Operation and Maintenance Period. The Concessionaire shall keep one set of Final Drawings at Project Site for the entire Concession Period.
AutoNDA by SimpleDocs
Final Drawings. Vision Design Build Remodel and our client will produce the following items during this phase: ● Final decisions on design and selections. In the two previous Phases, Vision DBR has provided the needed support for gathering the information to make final decisions. For this Phase it is necessary to have final decisions or a defined mechanism with a deadline for making that decision. ● Detailed kitchen, bath and architectural layouts, as required by the project's scope. ● Detailed product specification information. ● Electrical plan including lighting layout, switch and outlet layout, as required by project. ● During this phase a final project cost is determined. This will not include additional items requested by the client after this point. ● This phase does not include any engineering fees. Any engineering services needed for wall removal, sealed drawings, etc… will be discussed and a price proposal given to the client.
Final Drawings. On completion, a complete set of final transparent drawings shall be delivered to the Department. These drawings shall include the following:
Final Drawings. 10.3.1 Once the Purchaser’s comments and corrections have been taken from the drawings listed in Section 10.1, final drawings shall be submitted. 10.3.2 The drawings shall be submitted via e-mail in AutoCAD version 2018 or earlier and PDF format. 10.3.3 Final drawings shall be stamped “Certified”. 10.3.4 One additional set of final drawings shall be located in a proper slot in the control cabinet of each breaker supplied and packaged in a weatherproof container.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!