Mtubatuba CNC Water Treatment Plant. Supervision 5.2 Mtubatuba CNC Supervisor per call-out Hour
AutoNDA by SimpleDocs
Mtubatuba CNC Water Treatment Plant. Specialist/ Chemist 5.3 Mtubatuba CNC Chemist per call- out Hour 1.2.5.1.1
Mtubatuba CNC Water Treatment Plant. 5.4 Mtubatuba CNC Weekend/Public Holiday call-out per hour per operator Hour
Mtubatuba CNC Water Treatment Plant. The scope of work for the Operational and maintenance service at the Eskom Mtubatuba Water Treatment Plant on week days 07:00 – 16:00. Should the operations be required on weekends this will be instructed by Service Manager and paid as per weekend/public holidays rate. The scope includes the following:  Production of potable water within the design capacity of the Water Treatment Plant.  Provision of Chemicals (as stipulated in Summary of weekly inspection and operations control table below).  Provision of two (2) onsite operator with a minimum qualification of Matric Certificate with Maths and Science to be on site on week days 07:00 – 16:00.  Onsite staff must have training on Health & Safety for the following: o Water Treatment Plant operation and troubleshooting o Use of the on-site safety file o Good Laboratory Practice o General Health & Safety (Accredited) o Dangerous Goods Handling (Accredited) o Explain and Perform Fall Arrest Techniques when Working at Heights (Accredited) o First Aid Level 1 (Accredited) o Perform Basic Fire Fighting (Accredited)  Operations personnel: o Provide trained and competent staff to manage, operate and maintain the plant. o Full process control including regular auditing and reporting visits.  Provide technical and process information, in respect of the performance of the Water Treatment Plant.  Supply anti-scale, sodium hypochlorite.  Supply of on-site consumables including reagents for laboratory equipment.  Maintain a comprehensive database of daily key operating data, to be interrogated as and when required, for the purpose of investigation of any process related trends or concerns.  At all times act with due care and diligence to ensure that the water produced at the plant is within the required quality specifications, which is to be achieved insofar as the design capability of the plant allows.  Ensure weekly compliance samples are drawn from the plant and analysed.  Supply laboratory analytical services as are sufficient to ensure that the plant performance is monitored, measured and maintained and that identified adjustments in chemical dosing is performed.  Written monthly and weekly reports submitted electronically on the plant performance. Item Summary of weekly inspection and operations control 1 Operational on-site analysis of final produced water * ph * Turbidity * Free Chlorine 2 Supply of Sodium Hypochlorite and Flocculent 3 Adjust Dosing Pumps 4 Inspection of equipment 5 Recording of Flows...
Mtubatuba CNC Water Treatment Plant. Specialist/Chemist Provision of one (1) Process Specialist/Chemist with a minimum qualification of a Bachelor’s Degree in Analytical Chemistry, Water Care or Chemical Engineering and registered with any of the science bodies. Initial and bi-annual visits by the Process Specialist/Chemist for the purpose of troubleshooting, process optimisation, site audit and client feedback.

Related to Mtubatuba CNC Water Treatment Plant

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall: