OVERVIEW OF THE WORKS Sample Clauses

OVERVIEW OF THE WORKS. The work to be performed under this contract comprises mainly the rehabilitation of runway 02- 20, including taxiways and aprons at Xxxx Xxxxxxx International Airport. The following aspects will be addressed in this project: Main runway (02/20) including the associated taxiways and aprons • The main runway will be re-surfaced using 45mm Continuously Graded Asphalt and 15mm Bitumen Rubber Friction Course (BRUTFC). • Taxiway Alpha will be rehabilitated and re-surfaced using 45mm Continuously Graded Asphalt. • Taxiway Bravo will be rehabilitated and re-surfaced using 45mm Continuously Graded Asphalt. • Taxiway Xxxxxxx will be rehabilitated and re-surfaced using 45mm Continuously Graded Asphalt. • Apron Bravo will be re-constructed with 80mm interlocking block paving. • Removal and replacement of existing infrastructure, including replacement of any damaged equipment thereof. • Reference existing paint markings and reinstatement before opening of the runway. Where instructed the position of the line markings may change. • Re-shaping Runway End Safety Areas (RESA) to avoid any future standing water. • Drainage improvements on the runway sides areas that may include level correction (with reinstatement of topsoil and re-vegetation/hydro seeding, excess grass removal and improvement to drain inlets.
AutoNDA by SimpleDocs
OVERVIEW OF THE WORKS. (SCOPE) The routine road maintenance /construction activities will ensure that provincial gravel and surfaced roads, as well as road reserves are maintained to a level of serviceability as set out in the document. The Framework contract will be valid for 36 months and the Works will consist of routine and periodic road maintenance tasks on the Provincial Road Network within the respective municipal area. Each works assignment, will however not exceed 12 months. Any Works assignment issued prior to the expiry of the 36 month Framework contract will be enforceable until the completion of that Works assignment, even if such completion date is after the expiry of the 36 month Framework contract.
OVERVIEW OF THE WORKS. Before any work is put in hand, the contractor has to familiarize himself with the sites. The successful tender shall service, repair and inspect the waterborne fire protection system at Steenbras, Athlone and Roggebbaai Power Stations as per this specifications and stipulations in the pricing schedules. This service will include the following activities:
OVERVIEW OF THE WORKS. Completion of works on the 3rd floor and associated furniture and fittings for ACSA staff.
OVERVIEW OF THE WORKS. Renovation to existing structures, Construction of two blocks of four classrooms, Grade R ablution block and associated external works at Gabajana Junior Secondary School, Flagstaff, Ngquza Hill Local Municipality.
OVERVIEW OF THE WORKS. The project entails the construction of an outdoor interest and learning point in the park. The circle will include a semi-enclosed area that can be used as exhibition space or for functions. It will also feature a zero depth water feature for children to play in and a bio pond that acts as an educational tool for visitors to the garden. The central feature will accommodate a large rock on which the bronze bust of Xxxxxx Xxxxxx will be installed.
OVERVIEW OF THE WORKS. The work entails ELECTRIFICATION OF ALLDAYS (20) AND DIEPSLOOT (19)
AutoNDA by SimpleDocs
OVERVIEW OF THE WORKS. This Contract is for the completion of the installation of the new firefighting reticulation system (FFRS). The work includes, but is not necessarily limited to: • Construction of new fire reticulation piping and connecting to partially installed network; • Construction of various pipe supports; • Modifications to already installed pipework; • Modifications to already installed supports. The above-mentioned work will entail: • Modifications and completion of the partially installed above ground system of approximately 4 000m of galvanised steel pipe, varying between 80mm diameter and 200mm diameter in size. • Construction of additional support structures for the pipelines. • Pipe re-alignment at pipe bridges • Additional hanger support straps where specified • Replacement of existing supports • Relocation of existing supports to more suitable locations • Corrosion protection to existing supports, hangers, bolts, etc. • Corrosion protection to pipes • Retaining the connections to the municipal system and tying in to the existing pipes feeding the site • Connecting the pipe network to the existing feed into buildings (sprinkler systems, hose reels and inside hydrants) • Connecting to the existing below ground fire reticulation system that is outside the boundary of the site • Supply and installation of various hydrants and valves • Blanking off existing hydrants and pipework • The existing fire reticulation network that is to be replaced, should be closed off. • Testing and commissioning of above ground network in its entirety including pipework previously installed by others The Works are described in detail on the drawings and the relevant sections of the Scope of Work.
OVERVIEW OF THE WORKS. This contract includes the design, supply, delivery to site, off-loading, erection, installation, commissioning, testing, and handing over in full working order a high mast lighting structure, including floodlight luminaries, in CITY OF MBOMBELA on an “as and when” basis for a period of three (3) years. This tender will be dependent on the availability of funds. Tenderers must allow for all items, whether specified or not, required to complete the installation. Over and above all the items listed in Section 1.2 and Section 1.3, the Contractor’s Scope of Work will specifically include the following:
OVERVIEW OF THE WORKS. Work to be carried out under this contract is shown on the drawings and described in the project specification. This Contract covers the middle section of Nqadu Rising Main (SV1600 to SV11000). The first section (SV0 to SV1600) was completed in 2019. The last section of this Rising Main is included in a separate Contract (where the Rising Main is laid parallel with a DN200 Gravity Main). This work may be briefly described as comprising the following: • Collect ‘Free Issue’ pipes by the Employer from storage yard at Ncambedlana High Level Reservoir site off Nqadu road and transport to side of trenches (9.4km DN350 Class25 oPVC and 80m DN200 Class25 mPVC pipes). • Supply of all fittings, epoxy or FBE coated and lined fabricated mild steel specials and bends and tees in the range of DN75 to DN350 (all steel due to high pressure class) • Trenching in weathered-to-unweathered sandstone and siltstone material through low-density residential areas. • Laying, bedding, backfilling and testing of approximately 9.4km long DN350 pipeline NOTE: 2km section ‘ring-fenced’ for local subcontractor. • Laying, bedding, backfilling and testing of a 165m DN200 offtake pipeline to Xxxxxx Reservoir. • Construction of xxxxxxxx for : o DN100 scour valves o DN350 isolating valves o DN 80 Air Valves o A DN350 Non-Return Valve o A DN200 ofttake to Xxxxxx Reservoir • Crossing of some existing services such as gravel roads. • OH&S and Environmental compliance and management including rehabilitation.