Paper Construction Documents Sample Clauses

Paper Construction Documents. Notwithstanding the foregoing, only permitted paper documents indicating they are “For Construction” are Construction Documents, and may be relied upon for construction of the Project.
AutoNDA by SimpleDocs
Paper Construction Documents. Notwithstanding the foregoing, only permitted paper documents indicating they are “For Construction” are Construction Documents, and may be relied upon for construction of the Project. Building Information Modeling [If Applicable] As used herein, the term "BIM" shall mean, collectively, the building information models incorporating the design and engineering of the Project in order to provide a digital representation of the physical and functional characteristics of the completed Project, all as more particularly described in Appendix F, Building Information Modeling. District, Architect, Subconsultants, Construction Manager and Trade Subcontractors will use BIM in connection with the design and construction of the Project. The Project’s BIM shall be developed in accordance with the Level of Development 300 (LOD 300): Model elements are suitable for the generation of traditional construction documents and shop drawings. As such, analysis and simulation is authorized for detailed elements and systems. Furthermore, BIM protocol shall be compliant with District Design Standards and utilized to both reduce the risk of change orders by identifying utility/systems conflicts, and to thoroughly document the project details. Architect shall comply with its obligations regarding Building Information Modeling as indicated in Appendix F, “Building Information Modeling”. Appendix F BIM is subject to modification by District at District’s reasonable request. Architect must notify District within seven (7) days of receipt of any modification to Appendix F if it believes the modification is so extensive as to justify additional services compensation. DESIGN SERVICES Scope Design Services shall include all the services and activities specified below, including without limitation all coordination and cooperation, in all Phases identified in Xxxxxxxxx 00.0X. Xxxxxxxx may request additional services in writing from the Architect (ARTICLE 50) District received from Architect a written Proposal dated [Insert Proposal Date Month dd, YYYY] for the Project. The scope of services portions of the Proposal were used in developing this Appendix A. However, the Proposal is neither incorporated into nor made a part of this Agreement. In addition, under no circumstances may the Proposal change, supplement, or modify commercial terms or other items addressed in other appendices to this Agreement. General Description and Requirements Coordination of Design. Architect shall fully coordinate...

Related to Paper Construction Documents

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Identification of Construction Documents The Design Professional shall identify the Construction Documents, which shall include, but are not limited to, the Specifications, the Drawings, and all Addenda. The Construction Documents are included within the Contract Documents.

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Agreement Construction Headings or captions to the provisions of this Agreement are solely for the convenience of the parties, are not part of this Agreement, and shall not be used to interpret or determine the validity of this Agreement. Any ambiguity in this Agreement shall not be construed against the drafter, but rather the terms and provisions hereof shall be given their reasonable interpretation.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • Liberal Construction The Covenants hereof shall be liberally construed to promote and accomplish the objectives set forth in the Recitals.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure: