PROJECT MANAGEMENT AND ENGINEERING Sample Clauses

PROJECT MANAGEMENT AND ENGINEERING. A Willbros project manager shall provide management and direction for the Project. Project controls shall maintain a detailed Work Plan with activities planned for the Work as set forth in Paragraph 6 of Schedule “A”. Following construction, Willbros will assemble completion report data, hydrostatic test records, non-destructive testing records, internal geometry pig results, Vendor data and material certifications, MAOP establishment records, and other inspection certificates. Without limiting the generality of the foregoing, the Project management and engineering portion of the Work to be performed by Willbros shall include: 1.1 Perform Project management, controls and reporting; 1.2 Prepare design basis document using the following design parameters: Class Locations (to be field verified) Class 1 MP 0 to MP 11 Class 3 MP 11 to MP 16 Design Pressure, psig 1440 Operating Temperature, ºF 20 - 100 Corrosion Allowance, inches nil Pipe Diameter, inches 42 Pipe W.T. and Grade F = 0.72 0.600” API 5L - X70 F = 0.60 0.700” API 5L - X70 F = 0.50 0.864” API 5L - X70 External Coatings FBE 14 - 16 mils Xxxx Coat or equal (for concrete coated pipe) 3 - 5 mils (in addition to FBE) Abrasion Resistant Coating (for road bores) 32 mils Internal Liquid Epoxy Coating 1.5 mils Minimum Bend Radius for Pigging 5 pipe diameters Concrete Weight Coating 6” thick, 190 pcf (0.600” W.T. pipe) 5” thick, 190 pcf (0.864” W.T. pipe) 1.3 Perform population density analysis to finalize class locations; 1.4 Perform field reconnaissance and gather site specific data at appurtenance locations and crossings, including foreign pipeline crossings; 1.5 Provide engineering input for permit applications, in accordance with Paragraph 2.3 of Schedule “A”; 1.6 Perform detailed design of the pipeline and all ancillary facilities of the Project, with reference to the flow schematic located in Attachment II; 1.7 Prepare Drawings and Specifications with bills-of-materials and construction typicals, in accordance with the Agreement, including Schedule “D”, and Paragraphs 2.7 and 2.8 of Schedule “A”; 1.8 Modify, as required and in accordance with this Agreement, the Cheniere-provided drawings listed in Paragraph 5.3 of Schedule “A”. 1.9 Perform geotechnical investigations at monitor-regulator and scraper launcher site; 1.10 Perform cathodic protection system design; 1.11 Prepare construction Specifications with hydrostatic test plan, in accordance with Schedule “D”; 1.12 Prepare job data books which will in...
AutoNDA by SimpleDocs
PROJECT MANAGEMENT AND ENGINEERING. The delivery of the power barge will be managed by a dedicated Project Team, comprising a Project Manager who has the overall responsibility for the delivery, who is assisted by Project Engineers for the main technical disciplines. The Project Team is the single point of contact with the purchaser’s organisation and has full authority to decide technical and commercial issues related to the project on behalf of Wärtsilä Finland Oy.

Related to PROJECT MANAGEMENT AND ENGINEERING

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • Project Management and Coordination The Engineer shall coordinate all subconsultant activity to include quality of and consistency of work and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Project Manager The term “Project Manager” refers to the employee of the State who has been assigned responsibility for overseeing and managing the proper and timely implementation of the project.

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity 1.1.02 Identify at least one individual to act as the program contact in the following areas: 1. Immunization Program Manager;

  • Project Managers The JBE’s project manager is: [Insert name]. The JBE may change its project manager at any time upon notice to Contractor without need for an amendment to this Agreement. Contractor’s project manager is: [Insert name]. Subject to written approval by the JBE, Contractor may change its project manager without need for an amendment to this Agreement.

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following; a) the proposed change(s), and a description of the difference to the existing contract requirements; b) a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Procuring Entity may incur in implementing the value engineering proposal; and c) a description of any effect(s) of the change on performance/functionality.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.