PROJECT MEASUREMENT AND VERIFICATION Sample Clauses

PROJECT MEASUREMENT AND VERIFICATION. The goal of this subtask is to develop a detailed Measurement and Verification Plan for each site. • Develop a detailed Measurement and Verification Plan for each site to include but not be limited to: o A description of the monitoring equipment and instrumentation that will be used at each site. o A description of the key input parameters and output metrics that will be measured. o A description of the analysis methods to be employed. o Independent, third-party measurement and verification services to be employed, if applicable. • Measurement and Verification Plan (draft and final)
AutoNDA by SimpleDocs
PROJECT MEASUREMENT AND VERIFICATION. The goal of this subtask is to develop a detailed Measurement and Verification Plan for the selected pilot deployment site(s). PT+ performance metrics, such as power output, CHP thermal output, and capacity factor will be assessed at the pilot deployment site, along with system reliability metrics, such as component failures and operator intervention. Feedstock metrics will also be measured and analyzed, including PT+ performance with different feedstock sizes and grades; feedstock consumption and waste processing rates; biochar production; and electrical, thermal, and total system efficiencies. Emissions monitoring for criteria pollutants will be undertaken to ensure conformance with California air quality standards and a GHG lifecycle analysis will be conducted. Finally, project costs will be aggregated with performance metrics to determine the capital and operating expenses and LCOE of the PT+. Fuel source will be “byproducts of sustainable forest management activities” as defined by the CPUC SB 1122 BioMAT program.4 4 See CPUC D14-12-081 - Decision Implementing Senate Bill 1122, Section 2.2.3 Bioenergy Using Byproducts of Sustainable Forest Management and Appendix B SB 1122 Forest Biomass – Forest Biomass Sustainability Byproduct Eligibility Form: Instructions and Worksheet. xxxx://xxxx.xxxx.xx.xxx/PublishedDocs/Published/G000/M143/K960/143960061.pdf ● Develop a detailed Measurement and Verification Plan for each site to include but not be limited to: ● A description of the monitoring equipment and instrumentation which will be used at each site. ● A description of the key input parameters and output metrics which will be measured (including, but not limited to those described above): PT+ performance metrics, such as power output, CHP thermal output, and capacity factor will be assessed at the site, along with system reliability metrics, such as component failures and operator intervention. Feedstock metrics will also be measured and analyzed, including PT+ performance with different feedstock sizes and grades; feedstock consumption and waste processing rates; biochar production; and electrical, thermal, and total system efficiencies. Emissions monitoring for criteria pollutants will be undertaken to ensure conformance with California air quality standards and a GHG lifecycle analysis will be conducted). ● A description of the analysis methods to be employed. ● Measurement and Verification Plan (draft and final)
PROJECT MEASUREMENT AND VERIFICATION. The goal of this task is to conduct independent third-party measurement and verification (M&V) to measure and quantify project benefits. • Consult with the CAM to identify and confirm the specific project benefits to be measured. At a minimum this will include pre- and post-project energy use (kilowatt hours, kilowatts, therms), and calculations of energy cost savings and greenhouse gas emissions. When directed by the CAM, this can include pre- and post-project measurements of water use (million gallons) and other project benefits, and calculations of the resulting cost savings and greenhouse gas emission reductions. • Enter into agreement with M&V vendor per Task 1.9. • Coordinate site visits with the M&V firm at the demonstration site(s) identified. • Develop M&V Plan for pre-install measurement of: o Baseline percentage of off-peak irrigation (%) o Baseline precision for manual and automatic control (%) o Baseline energy cost per month ($) o Baseline power load shifted (MW) • Perform pre-install measurements based on the M&V Plan for pre-install • Develop M&V Plan for post-install measurement of: o Improvement in percentage of off-peak irrigation (%) o Improvement in precision for manual and automatic control (%) o Energy cost savings per month ($) o Reduction in power load (MW) between 5-8 pm (PG&E) and 4-9 pm (SCE) • Perform post-install measurements based on M&V Plan for post-install • Prepare M&V Findings Reports for each demonstration site(s) that includes M&V Plan, pre and post install measurements, analysis, and results performed in this task as agreed upon with the CAM. • M&V Findings Reports
PROJECT MEASUREMENT AND VERIFICATION. The goal of this subtask is to develop a detailed M&V Plan for each site. • Develop a detailed M&V Plan for each site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used at each site. o A description of the key input parameters and output metrics which will be measured and recorded in an operations log. o A description of the analysis methods to be employed, including the performance of calculations and data visualizations to analyze the observed and estimated electricity savings (including peak savings), natural gas savings, and fuel savings as compared to baseline data. o Independent, third-party M&V services to be employed. • Include information on feedstock types (including categorization as primary and other) and quantity (wet/dry tons) with the progress reports and, at the end of the year, the report should include the total annual amounts by feedstock types. • M&V Plan (draft and final)
PROJECT MEASUREMENT AND VERIFICATION. The goal of this subtask is to develop a detailed M&V plan for each site. • Develop a detailed M&V Plan for each site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used at each site. o A description of the key input parameters and output metrics which will be measured. o A description of the analysis methods to be employed. o Independent, third-party M&V services to be employed, if applicable. o Detailed descriptions of mass balances, contamination rates, conversion rates, energy balances, etc. • M&V Plan (draft and final)
PROJECT MEASUREMENT AND VERIFICATION. The goal of this task is to conduct independent third-party measurement and verification (M&V) to measure and quantify project benefits. • Consult with the CAM to identify and confirm the specific project benefits to be measured and should include the following at a minimum: performance metrics from Subtask 1.12, pre and post-project energy use (kilowatt hours, kilowatts, therms), and calculations of energy cost savings and greenhouse gas emissions. This can include pre and post measurements of water use (million gallons) and other project benefits, and calculations of the resulting cost savings and greenhouse gas emission reductions and project economics (e.g., simple payback). • Enter into agreement with M&V firm per Task 1.9 • Coordinate site visits with the M&V firm at the demonstration sites. • Develop Phase I M&V Test Plan for pre-install measurement of: o Electricity use, to be measured by M&V firm o Water use, to be measured by M&V firm o Cow health metrics, to be measured by the Recipient • Perform pre-install measurements based on Phase I M&V Test Plan for pre-install • Develop Phase I M&V Test Plans for post-install measurement of: o Electricity use, to be measured by M&V firm o Water use, to be measured by M&V firm o Cow health metrics, to be measured by the Recipient • Perform post-install measurements based on Phase I M&V Test Plans for post-install • Develop Phase II M&V Test Plan for pre-install measurement of: o Electricity use, to be measured by M&V firm o Water use, to be measured by M&V firm o Cow health metrics, to be measured by Recipient • Perform pre-install measurements based on Phase II M&V Test Plan for pre-install • Develop Phase II M&V Test Plans for post-install measurement of: o Electricity use, to be measured by M&V firm o Water use, to be measured by M&V firm o Cow health metrics, to be measured by Recipient • Perform post-install measurements based on Phase II M&V Test Plans for post-install • Prepare M&V Findings Reports for each demonstration site that includes M&V Plan, pre and post install measurements, analysis, results, and analysis of whether the goals and objectives in Section II.C. and the performance metrics in Subtask 1.12 were met. The results and analysis will include: o Electricity impacts of the tested technology o Water impacts of the tested technology o Greenhouse gas emission reduction estimates for the technology o Economic impacts of the technology, including installation costs and operational cost savi...
PROJECT MEASUREMENT AND VERIFICATION. 40 The goal of this task is to conduct independent third-party measurement and verification (M&V) 41 to measure and quantify project benefits. 42 43 The Recipient shall:
AutoNDA by SimpleDocs
PROJECT MEASUREMENT AND VERIFICATION. The goal of this task is to conduct independent third-party measurement and verification (M&V) to measure and quantify project benefits. • Consult with the CAM to identify and confirm the specific project benefits to be measured. At a minimum this will include the goals/objectives in Section II.C., performance metrics in Subtasks 1.12, pre- and post-project energy use (kilowatt hours, kilowatts, therms), and calculations of energy cost savings and greenhouse gas emissions. When directed by the CAM, this can include pre- and post-measurements of water use (million gallons) and other project benefits, and calculations of the resulting cost savings and greenhouse gas emission reductions. • Enter into agreement with M&V vendor per Task 1.9 • Coordinate site visits with the M&V firm at the demonstration sites identified. • Develop M&V Plan for pre-install measurement of: o Optimized systems (Pasteurization, CIP and Storage) and its ancillary equipment as fully outlined in the narrative. • Perform pre-install measurements based on the M&V Plan for pre-install • Develop M&V Plan for post-install measurement of: o Optimized systems (Pasteurization, CIP and Storage) and its ancillary equipment as fully outlined in the narrative. • Perform post-install measurements based on M&V Plan for post-install • Prepare M&V Findings Reports for each demonstration site that includes M&V Plan, pre- and post-install measurements, analysis, results performed in this task as agreed with the CAM, and whether the goals/objectives from Section II.C. and performance metrics in Subtask 1.12 were achieved. • M&V Findings Report(s)
PROJECT MEASUREMENT AND VERIFICATION. The goal of this subtask is to develop a detailed Measurement and Verification (M&V) Plan for the project site. Components will be evaluated to specified operation metrics in initial commissioning and at the end of the project for the entire operating period. The following table summarizes some of the details expected to be captured in the M&V plan. Optimized storage for energy cost savings, present rate structure • Operate system for maximum non-export discharge at peak time of use. • Evaluate electrical and thermal performance envelopes of components. • Assess electrical billing, compare to modelling • AC kW, AC kWh for PV and batteries • $ saved vs. modelled Optimized storage for reduction of distribution capacity impact • Control storage for maximum power peak reduction and minimized demand variability • Assess against modelling • Estimate DRP impact for scaled deployment • AC kW, AC kWh for PV and batteries • kW peak and std dev for demand Optimized storage for • Design rate structure to maximize energy cost • AC kW, AC kWh best energy cost saving and distribution impact benefit and grid DRP benefit • Control storage accordingly • Assess electrical bills and power performance against modelling • Estimate DRP impact for scaled deployment for PV and batteries Characterize system, evaluate against expected operation • Measure electrical power parameters across operating states • Evaluate dynamic performance and efficiencies of PV, batteries, and inverters • # of battery cycles & net kWh • % charging from PV system vs grid • Utility bill reduction, on-peak and off-peak rates • PV: AC kW; AC kWh • Batteries:kWh in&out • Cycles/mo, $ saved • Develop and submit to CAM a detailed Measurement and Verification Plan for the project site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used at each site. o A description of the key input parameters and output metrics which will be measured. o A description of the analysis methods to be employed. Measurement and verification services • Measurement and Verification Plan (draft and final) – likely to be included as an attachment to the Final Report

Related to PROJECT MEASUREMENT AND VERIFICATION

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of fossil fuel consumption and associated GHG reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to:

  • Measurement and Billing 5.6.1 For billing purposes, each Party shall pass Calling Party Number ("CPN") information on each call carried over the Traffic Exchange Trunks at such time as the originating switch is equipped for SS7 and from all switches no later than December 31, 1998. At such time as either Party has the ability, as the Party receiving the traffic, to use such CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, such receiving Party shall xxxx the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, or Interstate Exchange Access rates applicable to each minute of Traffic for which CPN is passed, as provided in Exhibit A and applicable Tariffs. 5.6.2 If, under the circumstances set forth in subsection 5.6.1, the originating Party does not pass CPN on up to ten percent (10%) of calls, the receiving Party shall xxxx the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, for which CPN is passed. For the remaining up to ten percent (10%) of calls without CPN information, the receiving Party shall xxxx the originating Party for such traffic as Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, in direct proportion to the minutes of use of calls passed with CPN information. 5.6.3 If the originating Party does not pass CPN on more than ten percent (10%) of calls, or if the receiving Party lacks the ability to use CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, and the originating Party chooses to combine Local and Toll Traffic on the same trunk group, it will supply an auditable Percent Local Use ("PLU") report quarterly, based on the previous three months' traffic, and applicable to the following three months. If the originating Party also chooses to combine Interstate and Intrastate Toll Traffic on the same trunk group, it will supply an auditable Percent Interstate Use ("PIU") report quarterly, based on the previous three months' terminating traffic, and applicable to the following three months. In lieu of the foregoing PLU and/or PIU reports, the Parties may agree to provide and accept reasonable surrogate measures for an agreed-upon interim period. 5.6.4 Measurement of billing minutes for purposes of determining terminating compensation shall be in conversation seconds.

  • Inspection and Verification The Secured Parties and such persons as the Secured Parties may reasonably designate shall have the right to inspect the Collateral, all records related thereto (and to make extracts and copies from such records) and the premises upon which any of the Collateral is located, to discuss the Grantor’s affairs with the officers of the Grantor and its independent accountants and to verify under reasonable procedures the validity, amount, quality, quantity, value, condition and status of, or any other matter relating to, the Collateral, including, in the case of collateral in the possession of any third Person, by contacting any account debtor or third Person possessing such Collateral for the purpose of making such a verification. Out-of-pocket expenses in connection with any inspections by representatives of the Secured Parties shall be (a) the obligations of the Grantor with respect to any inspection after the Secured Parties’ demand payment of the Notes or (b) the obligation of the Secured Parties in any other case.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously.

  • Medical Verification The Town may require medical verification of an employee’s absence if the Town perceives the employee is abusing sick leave or has used an excessive amount of sick leave. The Town may require medical verification of an employee’s absence to verify that the employee is able to return to work with or without restrictions.

  • Contractor Changes The Contractor shall notify DAS in writing no later than ten (10) Days from the effective date of any change in: a. its certificate of incorporation or other organizational document; b. more than a controlling interest in the ownership of the Contractor; or c. the individual(s) in charge of the Performance. This change shall not relieve the Contractor of any responsibility for the accuracy and completeness of the Performance. DAS, after receiving written notice by the Contractor of any such change, may require such agreements, releases and other instruments evidencing, to DAS’s satisfaction, that any individuals retiring or otherwise separating from the Contractor have been compensated in full or that provision has been made for compensation in full, for all work performed under terms of the Contract. The Contractor shall deliver such documents to DAS in accordance with the terms of DAS’s written request. DAS may also require, and the Contractor shall deliver, a financial statement showing that solvency of the Contractor is maintained. The death of any Contractor Party, as applicable, shall not release the Contractor from the obligation to Perform under the Contract; the surviving Contractor Parties, as appropriate, must continue to Perform under the Contract until Performance is fully completed.

  • Search, Enquiry, Investigation, Examination And Verification a. The Property is sold on an “as is where is basis” subject to all the necessary inspection, search (including but not limited to the status of title), enquiry (including but not limited to the terms of consent to transfer and/or assignment and outstanding charges), investigation, examination and verification of which the Purchaser is already advised to conduct prior to the auction and which the Purchaser warrants to the Assignee has been conducted by the Purchaser’s independent legal advisors at the time of execution of the Memorandum. b. The intending bidder or the Purchaser is responsible at own costs and expenses to make and shall be deemed to have carried out own search, enquiry, investigation, examination and verification on all liabilities and encumbrances affecting the Property, the title particulars as well as the accuracy and correctness of the particulars and information provided. c. The Purchaser shall be deemed to purchase the Property in all respects subject thereto and shall also be deemed to have full knowledge of the state and condition of the Property regardless of whether or not the said search, enquiry, investigation, examination and verification have been conducted. d. The Purchaser shall be deemed to have read, understood and accepted these Conditions of Sale prior to the auction and to have knowledge of all matters which would have been disclosed thereby and the Purchaser expressly warrants to the Assignee that the Purchaser has sought independent legal advice on all matters pertaining to this sale and has been advised by his/her/its independent legal advisor of the effect of all the Conditions of Sale. e. Neither the Assignee nor the Auctioneer shall be required or bound to inform the Purchaser of any such matters whether known to them or not and the Purchaser shall raise no enquiry, requisition or objection thereon or thereto.

  • CONTRACTOR PERFORMANCE AUDIT The Contractor shall allow the Authorized User to assess Contractor’s performance by providing any materials requested in the Authorized User Agreement (e.g., page load times, response times, uptime, and fail over time). The Authorized User may perform this Contractor performance audit with a third party at its discretion, at the Authorized User’s expense. The Contractor shall perform an independent audit of its Data Centers, at least annually, at Contractor expense. The Contractor will provide a data owner facing audit report upon request by the Authorized User. The Contractor shall identify any confidential, trade secret, or proprietary information in accordance with Appendix B, Section 9(a), Confidential/Trade Secret Materials.

  • The Performance Improvement Process (a) The Performance Improvement Process will focus on the risks of non- performance and problem-solving. It may include one or more of the following actions: (1) a requirement that the HSP develop and implement an improvement plan that is acceptable to the LHIN; (2) the conduct of a Review; (3) a revision and amendment of the HSP’s obligations; and (4) an in-year, or year end, adjustment to the Funding, among other possible means of responding to the Performance Factor or improving performance. (b) Any performance improvement process begun under a prior service accountability agreement that was not completed under the prior agreement will continue under this Agreement. Any performance improvement required by a LHIN under a prior service accountability agreement will be deemed to be a requirement of this Agreement until fulfilled or waived by the LHIN.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!