Purpose of the Manual Sample Clauses

Purpose of the Manual. 1.3.1 The purpose of this Environmental Monitoring and Audit (EM&A) Manual is to guide the set up of an EM&A programme to ensure compliance with the EIA study recommendations, to assess the effectiveness of the recommended mitigation measures and to identify any further need for additional mitigation measures or remedial action. This Manual outlines the monitoring and audit programme for the proposed Project. It aims to provide systematic procedures for monitoring, auditing and minimising environmental impacts associated with Project activities.
AutoNDA by SimpleDocs
Purpose of the Manual. This Environmental Monitoring and Audit (EM&A) Manual (“the Manual”) is prepared by Halcrow China Limited and ERM-Hong Kong, Limited (ERM) on behalf of the Civil Engineering and Development Department (CEDD). The Manual is a companion document of the EIA Study of the Developme nt of a Bathing Beach at Lung Mei, Tai Po (hereafter referred to as the Project). The Manual has been prepared in accordance with the EIA Study Brief (No. ESB- 138/2006) and the Technical Memorandum of the Environmental Impact Assessment Process (EIAO TM). The purpose of the Manual is to provide information, guidance and instruction to personnel charged with environmental duties and those responsible for undertaking EM&A work during construction and operation. It provides systematic procedures for monitoring and auditing of potential environmental impacts that may arise from the works. The EM&A Manual comprises descriptions of the key elements of the EM&A programme including: • Appropriate background information on the construction of the Project with reference to relevant technical reports; • Organisational arrangements, hierarchy and responsibilities with regard to the management of environmental performance during the construction phase. The EM&A team, the Contractor team and the Engineer Representative are included; • A broad construction programme indicating those activities for which specific mitigation is required and providing a schedule for their timely implementation; • Descriptions of the parameters to be monitored and criteria through which performance will be assessed including: monitoring frequency and methodology, monitoring locations (typically, the location of sensitive receivers as listed in the EIA), monitoring equipment lists, event contingency plans for exceedances of established criteria and schedule of mitigation and best practice methods for reduced adverse environmental impacts; • Procedures for undertaking on-site environmental performance audits as a means of ensuring compliance with environmental criteria; and • Reporting procedures. The EM&A Manual will be a dynamic document which will undergo a series of revisions, as needed, to accommodate the progression of the construction programme.
Purpose of the Manual. 1.1.1 The purpose of this Environmental Monitoring and Audit (EM&A) Manual is to guide the set up of an EM&A programme to ensure compliance with the Environmental Impact Assessment (EIA) study recommendations, to assess the effectiveness of the recommended mitigation measures and to identify any further need for additional mitigation measures or remedial action. This Manual outlines the monitoring and audit programme for the construction phase of the “Integration of Xxx Xx Wan and Silver Mine Bay Water Treatment Works” (hereafter referred as “the Project”). It aims to provide systematic procedures for monitoring, auditing and minimizing environmental impacts associated with construction works activities.
Purpose of the Manual. 1.1.1 The purpose of this EM&A Manual is to guide the setup of an EM&A programme to ensure compliance with the Environmental Impact Assessment (EIA) study recommendations, to assess the effectiveness of the recommended mitigation measures and to identify any further need for additional mitigation measures or remedial action.‌
Purpose of the Manual. The purpose of this Environmental Monitoring and Audit (EM&A) Manual, hereafter referred to as the Manual, is to guide the setup of an EM&A programme to ensure compliance with the Environmental Impact Assessment (EIA) study recommendations, to assess the effectiveness of the recommended mitigation measures and to identify any further need for additional mitigation measures or remedial action. This Manual outlines the monitoring and audit programme to be undertaken for Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling. It aims to provide systematic procedures for monitoring, auditing and minimising of the environmental impacts associated with Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling. Hong Kong environmental regulations for air and water quality, noise and waste, the Hong Kong Planning Standards and Guidelines, and recommendations in the EIA Report on Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling have served as environmental standards and guidelines in the preparation of this Manual. This Manual contains the following:

Related to Purpose of the Manual

  • PURPOSE OF THE CONTRACT DSHS agrees to purchase, and Contractor agrees to provide, services or goods to the eligible populations.

  • Purpose of Use The Executive agrees that he will use Confidential Information only for purposes authorized or directed by the Company.

  • Purpose of Attachment Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Attachment Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the New York State Transmission System and shall be used for no other purpose.

  • Purpose of Contract The purpose of this contract is to provide services in accordance with the terms and conditions specified in this contract including all attachments, forms, and exhibits which constitute the contract document.

  • Purpose of DPA The purpose of this DPA is to describe the duties and responsibilities to protect Student Data including compliance with all applicable federal, state, and local privacy laws, rules, and regulations, all as may be amended from time to time. In performing these services, the Provider shall be considered a School Official with a legitimate educational interest, and performing services otherwise provided by the LEA. Provider shall be under the direct control and supervision of the LEA, with respect to its use of Student Data

  • Purpose of the Committee In order to xxxxxx better relations between the parties, the purpose of the Committee shall be to discuss matters of mutual concern including matters pertaining to the improvement of quality health care and safe nursing practice. The Committee shall have the power to make recommendations to the Union and to the Employer.

  • Purpose of Loan The Borrower undertakes with each Creditor Party to use the Loan only for the purpose stated in the preamble to this Agreement.

  • Purpose of Evaluation 10.1.1 It is recognized that a system of evaluation is essential to assist Unit Members in developing competency and realizing their potential. It is further recognized that information gathered through such a system will enable decisions that measure a Unit Member’s performance in a just and equitable manner.

  • Purpose of the Processing The provision of the Services by the Data Processor to the Data Controller.

  • Purpose of Committee The purpose of the committee is to provide a forum for constructive engagement amongst representatives of plan participants, employers and the plan sponsor on issues of importance to the group benefits plan, including plan design, administration, and communication.

Time is Money Join Law Insider Premium to draft better contracts faster.