Site Roads Sample Clauses

Site Roads. C. 4.5.3.1 Roads shall be provided at the Storage Facility to ensure vehicle accessibility. These roadways shall connect to either public highways in the case of a stand-alone facility, or, if located within an existing facility, host site’s internal roadways. The arrangement of site roads shall optimize traffic patterns for a safe interface with the existing roads, internal or external, and other ongoing operations.
AutoNDA by SimpleDocs
Site Roads. Car Parks and Pavements The Facility shall be serviced by a comprehensive system of drained roads, car parks and hard standings that fully enables the safe and efficient access, circulation and egress of all vehicles using the Site including Vehicles, bulk tankers, coaches, private vehicles, etc., for the duration of the Agreement Period. The type and quality of pavements and associated kerbings, footpaths and features shall be sympathetic to the Department’s desire for a landmark development. All required access routes for fire fighting purposes shall be provided following ProjectCo's consultation with the Isle of Man Fire Service. A system of footpaths shall be incorporated which enables safe pedestrian access from car parks within the Site and the public road to all buildings and external structures and equipment.
Site Roads. Each wind turbine will have an access road to allow for vehicle access to facilitate inspections and maintenance of the turbines and associated equipment during operation. According to documentation provided by AFII and shown in Figure A-2, the access roads will consist of 6 inches of crushed gravel covering 12 inches of concrete-stabilized soil. All public / county roads were assumed to remain in place after decommissioning and were not considered as part of this Study.

Related to Site Roads

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • PARKING PERMITS A. Must be obtained on the day of move in. B. Towing charges resulting from violations will be the responsibility of the RESIDENT. C. Any form of duplication of parking permits is a violation of the LEASE AGREEMENT, and may be grounds for eviction. Note: Refer to Resident Handbook for further detail.

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Premises Parking and Common Areas 2.1 Letting Lessor hereby leases to Lessee, and Lessee hereby leases from Lessor, the Premises, for the term, at the rental, and upon all of the terms covenants and conditions set forth in this Lease. Unless otherwise provided herein, any statement of square footage set forth in this Lease, or that may have been used in calculating rental and/or Common Area Operating Expenses, is an approximation which Lessor and Lessee agree is reasonable and the rental and Lessee's Share (as defined in Paragraph 1.6(b)) based thereon is not subject to revision whether or not the actual square footage is more or less.

  • Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.

  • Roads The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments.