SITE WORKS Sample Clauses

SITE WORKS. 21.1 The property will be levelled to dispose the storm-water as per municipal regulations. 21.2 A landscaping budget have been allowed and will be used as per developer`s own discretion.
AutoNDA by SimpleDocs
SITE WORKS. 1.18.1 The property will be leveled to dispose the storm water as per municipal regulations. 1.18.2 Cutting and/or filling may be required to achieve the most feasible level for the development. 1.18.3 Landscaping to be done by the clients.
SITE WORKS. ▪ The property will be levelled to dispose the storm water to the extent as determined by the Contractor. ▪ No landscaping, other than general removal of building rubble.
SITE WORKSThe Landlord must at the Landlord's expense undertake the Site Works and must use all reasonable endeavours to complete construction of the Site Works by the Site Works Completion Date. The Landlord acknowledges the completion of the Site Works is necessary for the use of the Premises by the Tenant.
SITE WORKS. Roads: - Brick Paving Boundary walls - Not Applicable Gardens: - Kikuyu Grass Paving: - Brick Paving Washing line Ground & First Floor - Foldable wall mounted SECURITY: - Roboguard beams and perimeter electric fence
SITE WORKS. 3.1 Clear site of works of shrubs, bushes and trees m² 90 3.2 Excavate around foundation not exceeding 1m deep m³ 10 3.3 Excavate to remove top soil and load and cart away to contractors tipping site average depth 150mm m² 90 3.4 load and cart away surplus spoil to contractor’s dump site m³ 60 3.5 Backfill and compact in layers not exceeding 150mm m³ 90 3.6 Supply and install 500 gauge polythene laid under surface beds m² 90 3.7 Apply approved ant termite treatment m² 90
SITE WORKS a) Site Works builder has allowed for a equal cut and fill with compaction. b) Demolition of Existing Structure is not applicable. c) Excess soil from excavation to be removed from site by builder. d) All trees and plant material removal is not required for this site. Grass to be mown to a acceptable height prior to site start. e) Foundation and Slab design allowed for is dependent on a "H" class site. f) Site clean up and removal of all construction debris including the stock piled soil is the responsibility of the Builder. g) House Clean a builders clean is to be completed by the Builder prior to handover.
AutoNDA by SimpleDocs
SITE WORKS. 10.1. The Supplier must, when entering any KPE site, comply with the relevant site procedures and policies. Site and area specific inductions must be completed, as required, prior to entering each Site. It is the responsibility of the Supplier to obtain each site’s procedures and policies. 10.2. All costs associated with these requirements of subclause 10.1 are to be borne by the Supplier and deemed to be included in the Purchase Order price. 10.3. The Supplier shall supply all labour, tools, equipment and materials or other products necessary to complete the supply of the goods and ensure they are all kept secure from theft or damage and comply with any relevant law, standard, manufacturer or owner specifications, government authorisation and site safety requirements. 10.4. The Supplier must not interfere with any of the activities of KPE or any other persons at any site and shall ensure that all rubbish and other debris is removed from the site and that the site is left secure, clean, orderly and fit for any use specified by KPE, failing which a debt is due to KPE from the Supplier for any costs incurred to ensure the site is reinstated back to the condition prior to the works commencing. 10.5. The Supplier must not cause or allow pollution, contamination or environmental harm to occur in, on or under the works sites or surrounding land. 10.6. KPE may direct the Supplier to permanently remove from site any person who, in the opinion of KPE, is deemed to be incompetent, negligent or engaging in misconduct. 10.7. Site working days and hours will only be as approved by KPE, prior to the acceptance of the Purchase Order.
SITE WORKS. We have examined the information provided in the tender documents and concluded that there is no need for cut/borrow material for earthworks. The plant area at site 4 is mostly flattened and most of the earthworks are cut and fill type of work.
SITE WORKS. 2.1 The Buyer acknowledges that the Seller will not provide any retaining walls in addition to those constructed or under construction by the Seller at the time of Settlement. 2.2 The Buyer acknowledges that the Property may require additional site works to accommodate a residence and agrees with the Seller that these additional costs will be at the Buyer's expense and to consult their builder or contractor to determine site levels, additional retaining walls (if necessary), and associated costs. 2.3 The Buyer agrees that stormwater disposal will be directed at least 3 metres away from building areas to minimise risk of localised settlement. 2.4 The Buyer acknowledges that it is the responsibility of the Buyer to ensure that the structural design of the buildings and associated structures including retaining walls and swimming pools is suitable for the site conditions applicable to the Property.