SOURCE OF SUPPLY AND QUALITY OF MATERIALS Sample Clauses

SOURCE OF SUPPLY AND QUALITY OF MATERIALS. 6.2.1 Only materials conforming to the drawings and specifications and, when required by the contract have been accepted by the Project Manager, shall be used. In order to expedite the inspection and testing of materials, at the request of the Project Manager, the Contractor shall identify its proposed sources of materials within ten (10) days after notification by the Project Manager. 6.2.2 At the option of the Project Manager, the materials may be accepted by the Project Manager at the source of supply before delivery is started. Representative preliminary samples of the character and quantity prescribed shall be submitted by the Contractor or producer for examination and tested in accordance with the methods referred to under samples and tests.
AutoNDA by SimpleDocs
SOURCE OF SUPPLY AND QUALITY OF MATERIALS. 1 6-1.02 MST-Furnished Materials 1 6-1.03 Storage of Materials 2 6-1.04 Defective Materials 2 6-1.05 Trade Names and Alternatives 3 6-1.06 Plant Inspection 3 6-1.07 Certificates of Compliance 3 6-1.08 Foreign Materials 4 6-1.09 State Specification Numbers 5 6-2.01 Testing by MST 5 6-2.02 Testing by Contractor 7 6-3.01 Measurement and Payment 7
SOURCE OF SUPPLY AND QUALITY OF MATERIALS. A. The source of supply of each of the materials must be approved in writing by the Engineer before delivery is started. Representative preliminary samples of the character and quantity prescribed shall be submitted by the Contractor, said samples being taken under the observation of the Engineer, for examination, and tested in accordance with the methods referred to herein. Only materials conforming to the requirements of these specifications and approved by the Engineer shall be used in the work. No materials, which, after approval, have in any way become unfit for use, shall be used. The Contractor shall notify the Engineer where and when he purchases fabricated or manufactured materials for the Contract, and such notice shall be given the Engineer in sufficient time to allow for inspection of such materials at the point of manufacture. B. Unless a material has a satisfactory record of performance, the Engineer reserves the right to withhold approval of a new source of supply, even though it meets the specification requirements, until its qualities have been verified and proved in actual service. C. Tests of all materials specified will be made in accordance with the latest official approved methods, effective as of the date of Contract, described in the Contract Documents. Where ASTM, AASHTO, ANSI, AWWA, or similar standards of national repute are stipulated, the reference shall be construed to be the latest effective specification. D. The Contract drawings, specifications, and/or supplemental specifications indicate the name of manufacturer, trade name, model number or type of equipment or materials to be used as a standard for the Bidder's proposal. All bids shall be based on the equipment and materials specified. Reference to model number or catalog number is not intended to supersede the basic duty and performance requirements specified or indicated on the drawings. References made to a particular product or model of the manufacturer are made to identify a particular design quality, construction, arrangement or style. E. The low Bidder shall submit, within ten (10) working days after opening of bids, a complete statement of the origin, composition and manufacture including manufacturer's name and catalog numbers of all materials and equipment to be used in the work to be performed under this contract. Submission and/or approval of this list of materials and equipment shall not, however, relieve the Contractor of submitting detailed working drawings...
SOURCE OF SUPPLY AND QUALITY OF MATERIALS. At the option of the Engineer the source of supply of each of the material shall be approved by the Engineer before the delivery is started. Only materials conforming to the requirements of these specifications and approved by the Engineer shall be used in the Work. Materials used for the Work must be new and of the quality specified. When not particularly specified, materials must be the best of their class or kind. The Contractor must, if required, submit satisfactory evidence as to the kind and quality of materials. All materials proposed for use may be inspected or tested at any time during their preparation and use. After trial, if it is found that source of supply which have been approved so not furnish a uniform product or if the product from any source proves unacceptable at any time the Contractor shall furnish approved material from other approved sources. No material, which, after approval, has in any way become unfit for use shall be used in the Work.

Related to SOURCE OF SUPPLY AND QUALITY OF MATERIALS

  • Quality of Materials and workmanship The Contractor shall ensure that the Construction, Materials and workmanship are in accordance with the requirements specified in this Agreement, Specifications and Standards and Good Industry Practice.

  • Manufacturer’s Warranties If a Lease Vehicle is covered by a Manufacturer’s warranty, the Lessee, during the Vehicle Term for such Lease Vehicle, shall have the right to make any claims under such warranty that the Lessor could make.

  • Manufacturer’s Warranty The Goods include the manufacturer’s standard limited parts warranty to replace defective parts covered under such warranty exclusive of labor. Labor is warranted by the Elevator Contractor for 90 days following installation. The manufacturer’s parts warranty may require that the Goods be maintained throughout the warranty period by an authorized manufacturer’s representative under a separate maintenance contract. Any warranty is conditioned on written notice to the Elevator Contractor within warranty period and contingent upon receipt of final payment to Elevator Contractor.

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Use of Materials There should be no limitations or restrictions by Union upon a Contractor's choice of materials or design, nor, regardless of source or location, upon the full use and utilization, of equipment, machinery, packaging, precast, prefabricated, prefinished, or preassembled materials, tools or other labor saving devices, subject to the application of the California Public Contract and Labor Codes. Generally, the onsite installation or application of such items shall be performed by the craft having jurisdiction over such work.

  • SUPPLIER’S WARRANTIES 16.1 The Supplier represents, warrants and undertakes to the Authority that: 16.1.1 the Supplier has the full right, power and authority to enter into and perform this Agreement and to grant all of the Authority Rights to the Authority and for the Authority to use and exploit the same as contemplated in this Agreement; 16.1.2 all information, representations, warranties and other matters of fact contained in the Supplier’s tender submission as part of the competitive tender process referred to in the recitals to this Agreement are true, complete and accurate in all respects and the Supplier agrees to be bound by the obligations and statements made in such tender submission as if the same were set out in this Agreement, save where there is any inconsistency between the terms of this Agreement and such tender submission the terms of this Agreement shall prevail; 16.1.3 save in respect of any Third Party Content, no Deliverable has and no Deliverable will have been broadcast, released or otherwise exploited in any Broadcast Media anywhere in the world prior to the relevant Delivery Date; 16.1.4 there is no contract or arrangement to which the Supplier is a party and the Supplier will not enter into any contract or arrangement and there is and will be no other encumbrance or restriction which could in any way interfere with or inhibit the full exercise or exploitation of any and all of the Authority Rights by the Authority; 16.1.5 the Supplier has paid and shall promptly pay all sums due to any person who is or may be entitled to any payment in respect of services or facilities rendered or goods supplied or rights granted in connection with the Deliverables or on the exercise by the Authority of any of the Authority Rights or in respect of any tax, duty, levy, national insurance or any similar payment in connection with the Deliverables required to be made by the Supplier; 16.1.6 the Supplier will have, by and as at the relevant Delivery Date, obtained all necessary consents, grants, clearances and rights (including any rights in musical compositions contained within the Deliverables (if any) which are controlled by the Performing Right Society or its affiliated bodies) to enable it to produce and deliver the Deliverables and to grant to and enable the Authority to exercise the Authority Rights free from any liens, claims and encumbrances; 16.1.7 to the extent any musical compositions are contained in the Deliverables: 16.1.7.1 all recording synchronisation and dubbing licences have been obtained and licence fees have been paid; and 16.1.7.2 the performing rights in such compositions shall throughout the Term be controlled (i) by the Performing Right Society or its affiliated bodies; or (ii) by the Supplier; or (iii) are in the public domain, in all cases to the extent required for the purposes of the Authority's full exercise of its rights as contemplated by this Agreement; 16.1.8 no claim or litigation is pending or threatened in respect of the Deliverables or any the Authority Rights; 16.1.9 the Deliverables will be produced in accordance with all Laws (including with respect to health and safety); 16.1.10 the Deliverables will be free from all Viruses; 16.1.11 the Deliverables will not contain anything which is in contravention of the Codes and Guidelines or any Laws or which is obscene, blasphemous, seditious, racially inflammatory, defamatory or which infringes the rights of any person, including rights of copyright or trade marks or service marks, privacy, publicity or confidentiality or any other civil or common law or statutory right whatsoever or breaches any contract or is in contempt of court; 16.1.12 the Supplier has not entered and will not enter into any co-production, co-financing, pre-sale or other arrangement or agreement which involves the surrender by the Supplier of any control of the Deliverables; 16.1.13 all information, records and data provided to the Authority and with respect to the Deliverables and the production process will be accurate in all respects, full and up to date; 16.1.14 the Supplier is not insolvent nor unable to pay its debts as they fall due and no steps have been taken with a view to the winding-up or administration of the Supplier or the making of any composition or arrangement with any creditors of the Supplier; and 16.1.15 the Supplier will not at any time do or say anything which is or may be considered by the Authority (acting reasonably) to be detrimental or prejudicial to or to affect adversely the name, image, reputation or business of the Authority or otherwise to bring the Authority or any member of the Authority Group into disrepute. 16.2 The Supplier's warranties shall be deemed repeated on each Delivery Date (or, if any Deliverables are delivered to the Authority after the scheduled Delivery Date and the Authority has not exercised any right under this Agreement to treat such delay as an Event of Default under clause 27.1, within ten Working Days of the date of actual delivery) and on every occasion when the Authority exercises its Authority Rights.

  • Funding Disclaimers and Labeling A. Grantee shall not use System Agency’s name or refer to System Agency directly or indirectly in any media appearance, public service announcement, or disclosure relating to this Grant Agreement including any promotional material without first obtaining written consent from System Agency. The foregoing prohibition includes, without limitation, the placement of banners, pop-up ads, or other advertisements promoting Grantee’s or a third party’s products, services, workshops, trainings, or other commercial offerings on any website portal or internet-based service or software application hosted or managed by Grantee. This does not limit the Grantee’s responsibility to comply with obligations related to the Texas Public Information Act or Texas Open Meetings Act. B. In general, no publication (including websites, reports, projects, etc.) may convey System Agency’s recognition or endorsement of the Grantee’s project without prior written approval from System Agency. Publications funded in part or wholly by HHS grant funding must include a statement that “HHS and neither any of its components operate, control, are responsible for, or necessarily endorse, this publication (including, without limitation, its content, technical infrastructure, and policies, and any services or tools provided)” at HHS’s request.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!