SOURCE OF SUPPLY AND QUALITY OF MATERIALS Sample Clauses

SOURCE OF SUPPLY AND QUALITY OF MATERIALS. 6.2.1 Only materials conforming to the drawings and specifications and, when required by the contract have been accepted by the Project Manager, shall be used. In order to expedite the inspection and testing of materials, at the request of the Project Manager, the Contractor shall identify its proposed sources of materials within ten (10) days after notification by the Project Manager.
AutoNDA by SimpleDocs
SOURCE OF SUPPLY AND QUALITY OF MATERIALS. At the option of the Engineer the source of supply of each of the material shall be approved by the Engineer before the delivery is started. Only materials conforming to the requirements of these specifications and approved by the Engineer shall be used in the Work. Materials used for the Work must be new and of the quality specified. When not particularly specified, materials must be the best of their class or kind. The Contractor must, if required, submit satisfactory evidence as to the kind and quality of materials. All materials proposed for use may be inspected or tested at any time during their preparation and use. After trial, if it is found that source of supply which have been approved so not furnish a uniform product or if the product from any source proves unacceptable at any time the Contractor shall furnish approved material from other approved sources. No material, which, after approval, has in any way become unfit for use shall be used in the Work.
SOURCE OF SUPPLY AND QUALITY OF MATERIALS. 1 6-1.02 MST-Furnished Materials 1 6-1.03 Storage of Materials 2 6-1.04 Defective Materials 2 6-1.05 Trade Names and Alternatives 3 6-1.06 Plant Inspection 3 6-1.07 Certificates of Compliance 3 6-1.08 Foreign Materials 4 6-1.09 State Specification Numbers 5 6-2.01 Testing by MST 5 6-2.02 Testing by Contractor 7 6-3.01 Measurement and Payment 7
SOURCE OF SUPPLY AND QUALITY OF MATERIALS. A. The source of supply of each of the materials must be approved in writing by the Engineer before delivery is started. Representative preliminary samples of the character and quantity prescribed shall be submitted by the Contractor, said samples being taken under the observation of the Engineer, for examination, and tested in accordance with the methods referred to herein. Only materials conforming to the requirements of these specifications and approved by the Engineer shall be used in the work. No materials, which, after approval, have in any way become unfit for use, shall be used. The Contractor shall notify the Engineer where and when he purchases fabricated or manufactured materials for the Contract, and such notice shall be given the Engineer in sufficient time to allow for inspection of such materials at the point of manufacture.

Related to SOURCE OF SUPPLY AND QUALITY OF MATERIALS

  • Quality of Materials and Workmanship The Contractor shall ensure that the Construction, Materials and workmanship are in accordance with the requirements specified in this Agreement, Specifications and Standards and Good Industry Practice.

  • Confidentiality of Material a. All material given to or made available to the CONTRACTOR by virtue of this Contract, which is identified as proprietary or confidential information, will be safeguarded by the CONTRACTOR and shall not be disclosed to any individual or organization without the prior written approval of the STATE.

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Use of Materials There should be no limitations or restrictions by Union upon a Contractor's choice of materials or design, nor, regardless of source or location, upon the full use and utilization, of equipment, machinery, packaging, precast, prefabricated, prefinished, or preassembled materials, tools or other labor saving devices, subject to the application of the California Public Contract and Labor Codes. Generally, the onsite installation or application of such items shall be performed by the craft having jurisdiction over such work.

  • Funding Disclaimers and Labeling A. Grantee shall not use System Agency’s name or refer to System Agency directly or indirectly in any media appearance, public service announcement, or disclosure relating to this Grant Agreement including any promotional material without first obtaining written consent from System Agency. The foregoing prohibition includes, without limitation, the placement of banners, pop-up ads, or other advertisements promoting Grantee’s or a third party’s products, services, workshops, trainings, or other commercial offerings on any website portal or internet-based service or software application hosted or managed by Grantee. This does not limit the Grantee’s responsibility to comply with obligations related to the Texas Public Information Act or Texas Open Meetings Act.

Time is Money Join Law Insider Premium to draft better contracts faster.