Time and Material Work Clause Samples
Time and Material Work. The agreed upon “time and material” rate sheets are attached to these Special Conditions and shall be considered fully-loaded. Any such labor or equipment rates shall be deemed to include all direct and indirect costs, including but not limited to, direct and indirect labor costs, taxes, labor contributions, fringes, insurance, maintenance, fuel, and any other costs associated with the labor performed or equipment provided. Straight time rates shall be charged for the first 40 hours worked in each week (Monday through Sunday.)
Time and Material Work. In the event Contractor directs Subcontractor to perform any work on a time and material basis (T&M), the following requirements apply:
2.16.1. Subcontractor shall submit on a daily basis Extra Work Authorizations (▇▇▇) tickets for acknowledgement by Contractor’s Project Manager. Superintendents, foremen, or field craft personnel are not authorized to acknowledge any extra time and material tickets. Contractor may assign another individual other than the Project Manager to acknowledge ▇▇▇▇ but shall only do so via change order. Contractor’s authorized person shall not be changed via verbal communication. The signature of Contractor’s authorized representative will constitute acknowledgment and certification that the work was performed under the Contractor’s direction and that the time and materials indicated on the EWA ticket are true and correct. The signature of Contractor’s authorized representative shall not constitute agreement that the work of the EWA ticket has been performed in accordance with the requirements of the Subcontract Documents, which shall remain Subcontractor’s responsibility. The signature of Contractor’s authorized representative shall not entitle Subcontractor to payment for the work of the EWA ticket. Subcontractor shall not be entitled to payment for any EWA ticket work claimed to have been performed when the EWA tickets documenting such work have not been duly signed by Contractor’s authorized representative.
2.16.2. Subcontractor’s EWA tickets shall include, at a minimum, the following information:
2.16.2.1. Contractor’s Change Proposal number and RFI, ASI, CCD, etc.;
2.16.2.2. The date on which the work was performed;
2.16.2.3. A detailed description and location of the work performed;
2.16.2.4. The name of the Contractor representative authorizing such work to be performed;
2.16.2.5. Craft persons’ names, labor hours, and labor rates for all labor performed, with separate identification of regular and overtime hours;
2.16.2.6. Quantities and costs for each item of materials used to perform the work;
2.16.2.7. Quantities and costs for each item of equipment used to perform the work;
2.16.2.8. The signature of Contractor’s authorized representative.
2.16.3. EWA numbering shall not have any sequencing gaps.
2.16.4. EWA tickets shall not combine more than one change item.
2.16.5. EWA tickets shall not include more than one day’s work.
2.16.6. Worked tracked on EWAs are for actual costs only. Small tools and safety cannot be applie...
Time and Material Work. If Contractor directs Subcontractor to perform any Subcontract Change Order Work that is not directed by Owner on a time and material basis (“T&M Work”), such T&M Work will be payable as set forth below:
Time and Material Work. Work done on a time and material basis must be documented separately by Subcontractor, the documentation signed daily by Contractor's authorized representative, and invoiced monthly during the month in which the Work was performed. Subcontractor's failure to strictly follow these time and material work procedures will release Contractor from all responsibility for payment for the Work, regardless of whether the Contractor has signed for the additional Work, since the parties' agree that Contractor's proper evaluation of such Work can be performed adequately only if Subcontractor complies timely with each of the procedures outlined herein. Only the Contractor's Construction Manager or Project Manager is authorized to sign daily time slips or other documentation of changed work, but only Contractor's Project Manager is empowered to direct or authorize changes in the Subcontract Work.
Time and Material Work. There may be need for extra work during the project lifecycle. The parties have agreed that the rates for Time and Material work that apply to this Agreement are:
a) For CGE&Y Consultants from outside Slovak or Czech Republics, per day and person: Project manager 1.635 Euro Business Consultant 1.480 Euro Technical specialist and System Designer 1.340 Euro Programmer 896 Euro Travel expenses for CGE&Y Consultants from outside of Czech and Slovak Republics are not included and will be charged separately.
b) For CGE&Y Consultants who are Slovak and/or Czech residents, per day and person: Project manager 1.000 Euro Business Consultant 950 Euro Technical specialist and System Designer 800 Euro Programmer 600 Euro
Time and Material Work. The CONSULTANT shall assist CITY in establishing policies related to the extension of mains. However, actual design of main extensions, preparation of plans and specifications for bid documents and construction contract management services by the Consultant would be accomplished on a time and material basis based on prior approval and coordination with City staff. If requested, the CONSULTANT can furnish construction inspection services for water main projects on a time and material basis in accordance with Attachment E. The Consultant shall perform design reviews of new water main or service lateral construction. The first hour of review time is included in the monthly base fee. Time above this will be on a time and material basis. The City and Consultant shall agree, prior to and in writing, on the scope of any other additional services to be provided on a time and material basis under this contract.
Time and Material Work. Ring Power will proceed with the work agreed upon at current labor and parts prices.
Time and Material Work