Project Work Type definition

Project Work Type. HMA RESURFACING Accounting ID: 37374 Xxx-Xxxxxxx Aid - Predetermined Wages are not in Effect Project Number: STBG-SWAP-C024(126)--FG-24 County: XXXXXXXX Project Work Type: HMA RESURFACING WITH MILLING Accounting ID: 37376 Non-Federal Aid - Predetermined Wages are not in Effect XXXXXXXX Project Work Type: HMA RESURFACING WITH MILLING Accounting ID: 37375 Xxx-Xxxxxxx Aid - Predetermined Wages are not in Effect Project Work Type: HMA PAVEMENT WIDENING / HMA RESURFACING Non-Federal Aid - Predetermined Wages are not in Effect 24-C024-126 154 Jan 20, 2021 10:00 A.M. 00 Late Start Date 04/05/2021 130 WORK DAYS $2,500.00 . 24-C024-126 154 Jan 20, 2021 10:00 A.M. There are no notes for this contract. 24-C024-126 154 Jan 20, 2021 10:00 A.M. The following is a list of Contract Addenda: 20JAN154.A01 Contract ID: 24-C024-126 Call Order No.: 154 Letting Date: January 20, 2021 10:00 A.M. 001.2015 *** STANDARD SPECIFICATIONS -- SERIES 2015 *** The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2015, plus applicable General Supplemental Specifications, Developmental Specifications, Supplemental Specifications AND Special Provisions shall apply to construction work on this contract. Contract ID: 24-C024-126 Call Order No.: 154 Replace the Article: When an Individually Prepared Statement is submitted to the Department, the maximum prequalification amount will be $400,000. Replace the Article: When a CPA Reviewed Statement is submitted to the Department, an experience factor (F) ranging from 0.0 to 12.5, depending on the prospective bidder's past performance with projects let by the Department, will be used in the prequalification formula. A prospective bidder, who has been qualified to submit proposals with this type of statement, shall be limited to individual proposal sizes that do not exceed the lesser of $2 million or the maximum prequalification amount minus the bidder's amount of uncompleted work currently under contract. Any combination of proposals, however, may total more than $2 million - as long as that total does not exceed the maximum prequalification amount minus the currently uncompleted work.
Project Work Type. TRAFFIC SIGNS Accounting ID: 36055 Federal Aid - Predetermined Wages are in Effect Federal Aid - Predetermined Wages are in Effect POTTAWATTAMIE
Project Work Type. TRAFFIC SIGNS Accounting ID: 35593 Federal Aid - Predetermined Wages are in Effect 00-0000-000 105 Dec 18, 2018 10:00 A.M. 00 Late Start Date 03/18/2019 30 WORK DAYS $3,500.00 See Site ID 00 description in the Proposal Notes. 01 11/20/2019 COMPLETION DATE $9,000.00 See Site ID 01 description in the Proposal Notes.

Examples of Project Work Type in a sentence

  • Project Work Type SUE LevelsFigure 600-3 If utilities are expected to significantly impact the project, the Project Engineer should consider utilizing a WSDOT-approved SUE provider.

  • Route: IOWA 1 Accounting ID: 38684 Project Number: NHSX-001-4(061)--3H-92 County: Project Work Type: PCC PAVEMENT - REPLACE Location: Keokuk Co Line to WCL of Brighton Route: IOWA 1 Accounting ID: 38685 Contract ID: Contract Time Call Order No.: Letting Date: Site ID Site Details Liquidated Damages (*) - Indicates Cost Plus Time Site.

  • A listing of the standardized project work type codes and definitions used by MDT can be found at the following links on the MDT Website.Project Work Type Codes Project Work Type Definitions The applicable project work type number will be determined when the project is nominated and is verified during the PFR process.


More Definitions of Project Work Type

Project Work Type. TRAFFIC SIGNS Location: 11th Ave Dr to W of Co Rd V44 (EB/WB) Route: U.S. 30 Accounting ID: 38931 Project Number: NHSX-030-6(183)--3H-06 County: Project Work Type: PCC PAVEMENT - GRADE AND NEW Location: 11th Ave Dr to W of Co Rd V44 (EB/WB) Route: U.S. 30 Accounting ID: 38930 Project Number: NHSX-030-6(226)--3H-06 County: Project Work Type: RCB CULVERT REPLACEMENT - SINGLE BOX Location: 0.5 mi W of Co Rd V40 (EB/WB) Route: U.S. 30 Accounting ID: 38932 Contract ID: Contract Time Call Order No.: Letting Date: Site ID Site Details Liquidated Damages (*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit The following sections are alternates:
Project Work Type. LIGHTING Accounting ID: 36357 Federal Aid - Predetermined Wages are in Effect POLK Federal Aid - Predetermined Wages are in Effect POLK Project Work Type: PCC PAVEMENT - GRADE AND NEW Accounting ID: 36359 Federal Aid - Predetermined Wages are in Effect POLK Federal Aid - Predetermined Wages are in Effect 00-0000-000 105 Nov 19, 2019 10:00 A.M. 00 Late . Start Date 04/01/2020 30 WORK DAYS $2,000.00 01 11/24/2020 COMPLETION DATE $4,000.00 See Site ID 01 description in the Proposal Notes. 02 Approximate Start 05/01/2020 Date See Site ID 02 description in the Proposal Notes. 140 CALENDAR DAYS $10,000.00 00-0000-000 105 Nov 19, 2019 10:00 A.M. *** Site ID 00 *** This site is for work that does not affect Site ID 01, Site ID 02, and does not require roadway or ramp closures. *** Site ID 00/Xx Xxxxxx Xxxx Opening Bonus *** This site is to open up to traffic southbound I-35 and the reconstructed interchange. This site corresponds to the No Excuse Bonus of $750,000. The contractor will be paid the predetermined lump sum amount in the Schedule of Prices for the bid item No Excuse Road Opening Bonus to have southbound I-35 and the reconstructed interchange open to through traffic by November 24, 2020. Any delays due to weather, change orders, overruns of quantities, utility delays, or any other delays will not be considered as justification to modify the calendar date. *** Site ID 02/Incentive/Disincentive*** This site is for completion of all work on E. 0xx Xxxxxx requiring closure of E. 0xx Xxxxxx as shown in stages 3A, 3B, 3C and 3D. This is an Incentive/Disincentive site per Section 1111 of the Standard Specifications with the following conditions: Closure/Calendar Days Allowed for this site: 140 There is no Maximum incentive for this site. Incentive/Disincentive/Liquidated Damages per day: $10,000 The Critical Closure Activity occurs when E. 0xx Xxxxxx is closed to traffic and is complete when E. 0xx Xxxxxx is open to traffic. *** Work Restrictions *** The contractor will be allowed to work on the southbound I-35 bridge over E. 0xx Xxxxxx before 4-1-2020 with I-35 in its current traffic configuration. I-35 traffic cannot be switched until 4-1-2020.
Project Work Type. TRAFFIC SIGNS Accounting ID: 39454 Federal Aid - Predetermined Wages are in Effect Project Work Type: RCB CULVERT REPLACEMENT - SINGLE BOX Federal Aid - Predetermined Wages are in Effect WASHINGTON Project Work Type: PCC PAVEMENT - GRADE & REPLACE Accounting ID: 39453 Federal Aid - Predetermined Wages are in Effect 00-0000-000 107 May 16, 2023 00 Late Start Date 04/01/2024 240 WORK DAYS $3,000.00 . 0003 AA 2 DESIGN NO. 0223; ALT 'AA' OPT 2: 8'-0 X 9'-0 X 209'-9 1/4 PRECAST RCB, BID THIS SEC IF ALTERNATE ‘AA’ OPT 2 IS CHOSEN(108) 0005 BB 2 DESIGN NO. 0123;ALT 'BB' OPT 2: 8'-0 X 9'-0 X 205'-9 1/4 PRECAST RCB, BID THIS SECTION IF ALTERNATE ‘BB’ OPT 2 IS CHOSEN(108)
Project Work Type. TRAFFIC SIGNS Location: W of IA 00 xx 00xx Xxx Xx Route: U.S. 30 Accounting ID: 38033 Project Number: NHSX-030-6(182)--3H-06 County: Project Work Type: BRIDGE NEW - PPCB Location: IA 21 over US 30 Route: U.S. 30 Accounting ID: 38027 Project Number: NHSX-030-6(242)--3H-86 County: Project Work Type: LIGHTING Location: W of IA 00 xx 00xx Xxx Xx Route: U.S. 30 Accounting ID: 38034 Location: 0.3 mi E of Q Ave North and Additional Locations from Tama Bypass to W of IA 21 Route: U.S. 30 Project Number: NHSX-030-6(256)--3H-86 County: Project Work Type: GRADING Location: Tama Bypass to W of IA 21 Route: U.S. 30 Accounting ID: 38035 Contract ID: Contract Time Call Order No.: Letting Date: Site ID Site Details Liquidated Damages (*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit The following sections are alternates:
Project Work Type. LIGHTING Accounting ID: 37056 Federal Aid - Predetermined Wages are in Effect POTTAWATTAMIE Federal Aid - Predetermined Wages are in Effect 00-0000-000 104 Aug 18, 2020 10:00 A.M. 00 9/1/2022 COMPLETION DATE $3,000.00 . 01 12/1/2020 COMPLETION DATE $3,000.00 Complete SB I-29 Ramp C Grading. See description below. 02 Approximate Start 05/01/2021 Date Stage 1C Traffic. See description below. 14 CALENDAR DAYS $9,500.00 03 Approximate Start 07/01/2021 Date 10 CALENDAR DAYS $9,500.00 Stage 1E Traffic. See description below. 04 Approximate Start 03/15/2021 Date Stage 1D Traffic. See description below. 100 CALENDAR DAYS $7,500.00 05 11/1/2021 COMPLETION DATE $10,500.00 Open NB I-29 Exit Ramp to 9th Ave. See description below. 06 11/15/2021 COMPLETION DATE $3,000.00 Xxxxxxxx Xxxxx 0X. See description below. 07 Approximate Start 05/01/2022 Date 21 CALENDAR DAYS $14,000.00 Stage 3 Traffic. See description below. (*) 08 250 WORK DAYS $1,290.00 A + B RAILROAD FLAGGERS 00-0000-000 104 Aug 18, 2020 10:00 A.M.
Project Work Type. LIGHTING Accounting ID: 36442 Federal Aid - Predetermined Wages are in Effect Non-Federal Aid - Predetermined Wages are in Effect POLK
Project Work Type. TRAFFIC SIGNALS Accounting ID: 35529 Federal Aid - Predetermined Wages are in Effect POLK