Conceptual Design Package Sample Clauses

Conceptual Design Package. PART 3A – PRELIMINARY DESIGN (60%) & FINAL DESIGN (90% & 100%) P RELIMINARY DESIGN (60%) ENGINEER will provide preliminary design services (including roadway design and traffic signal adjustment plans, and other special details required) to the CITY with the following design drawings: General Sheets Cover Sheet Project Layout Existing Utility Layouts (XXX) Project Quantities R oadway Plans Removal Layouts Typical Sections Intersection Layouts Driveway Layouts Grading Plan Cross Sections City Standard Paving Details Drainage Plans No drainage improvements are anticipated other than for the removal and reconstruction of curb inlets and the extension of existing laterals for the Center Street widening alternative. Traffic Signal Adjustment Plans for New York Avenue @ Xxxxxxxx Road Existing Conditions Layout Proposed Signal Layout Electrical Conductor, Traffic Signal Cable and Conduit Chart City Standard Details TxDOT Loop Detector Details S igning and Marking Plans Layouts City Standard Details E rosion Control Plans Layouts City Standard Details I llumination Plans for Relocations at Road to Six Flags @ Center Intersection Illumination Layout Details Utility Coordination and Clearance The ENGINEER will consult with the CITY, and aid CITY in coordination with public utilities, private utilities, and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. Coordination of utility relocations, if required, will be the responsibility of the CITY. City will coordinate with franchise utilities once locations are verified by ENGINEER. Opinion of Probable Construction Cost ENGINEER will prepare Opinion of Probable Construction Cost based on 60% plans. ENGINEER and CITY Plan Review Process Attend one (1) post-submittal meeting after the submittal of the 60% plans. For scheduling purposes, review time will be set at 42 days. ASSUMPTIONS
AutoNDA by SimpleDocs

Related to Conceptual Design Package

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services.