Design Criteria A/E shall prepare all work in accordance with the latest version of applicable County’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications. A/E shall prepare each Plans, Specifications, and Estimates (PS&E) package in a form suitable for letting through County’s construction contract bidding and awarding process.
Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones: 6.1 Substantial Site work completed. On or before December 31, 2020 Interconnection Customer must demonstrate completion of at least 20% of project site construction. At this time, Interconnection Customer must submit to Interconnected Transmission Owner and Transmission Provider initial drawings, certified by a professional engineer, of the Customer Interconnection Facilities. 6.2 Delivery of major electrical equipment. On or before December 31, 2021, Interconnection Customer must demonstrate that all generating units have been delivered to Interconnection Customer’s project site.
General Criteria (a) If general criteria are required as part of the Application, only one (1) set shall be completed. General criteria measure the quality of the Land Manager’s overall OHV program. The Applicants shall answer these questions with respect to the entirety of the OHV operation, including all trails and areas available for OHV Recreation, not just specific Projects or Project Areas. (b) General criteria include, but are not limited to, the following: (1) OHV Opportunity and services provided, (2) Agency contribution to the overall cost of managing and delivering the OHV Opportunity, (3) Management of natural and Cultural Resources, (4) Effective education of rules/regulations, and (5) Past performance in completing and administering Xxxxx funded Projects. (c) Non-land manager Applicants required to complete the general criteria shall cooperate with the Land Manager(s) to obtain the information necessary to complete the general criteria section of the Application. Note: Authority cited: Sections 5001.5 and 5003, Public Resources Code. Reference: Sections 5024.1, 5090.32 and 5090.50, Public Resources Code.
Selection Criteria Each Contract is secured by a new or used Motorcycle. No Contract has a Contract Rate less than 1.00%. Each Contract amortizes the amount financed over an original term no greater than 84 months (excluding periods of deferral of first payment). Each Contract has a Principal Balance of at least $500.00 as of the Cutoff Date.
Design Criteria and Standards All Projects/Services shall be performed in accordance with instructions, criteria and standards set forth by the Director.
Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.
Evaluation Criteria 5.2.1. The responses will be evaluated based on the following: (edit evaluation criteria below as appropriate for your project)
Standard Work Week The standard work week for full-time employees covered by this Agreement shall be forty (40) hours, exclusive of the time allotted for meal periods, consisting of five (5) consecutive work days followed by two (2) consecutive days off. The week shall commence with the shift that includes 12:01 A.M. Sunday of each calendar week and end at the start of the shift that includes 12:00 midnight the following Saturday. The Employer retains the right to modify the work schedules to meet operational needs.
Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.