ENUMERATION OF THE CONTRACT DOCUMENTS Sample Clauses

ENUMERATION OF THE CONTRACT DOCUMENTS. 2.01 The Contract Documents consisting of the Agreement Form, M/WBE Program Requirements, Documents contained in the Project Manual, General and Supplementary Conditions, Drawings, Specifications, and all Addenda and modifications issued after execution of the Contract thereto together form the Contract, and they are fully a part of the Contract as if written herein word for word. The following is an enumeration of the Drawings and Project Manual for this Project: 2.02 The Drawings:
AutoNDA by SimpleDocs
ENUMERATION OF THE CONTRACT DOCUMENTS. 10.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 10.1.1 This executed Agreement Between Owner and Contractor (i.e. the Agreement) 10.1.2 The General Conditions of the Contract for Construction Dated October 22, 2013 10.1.3 Other Documents, as follows:
ENUMERATION OF THE CONTRACT DOCUMENTS. 2.01 The Contract Documents consisting of the Agreement Form, M/WBE Program Requirements, Documents contained in the Project Manual, General and Supplementary Conditions, Drawings, Specifications, and all Addenda and modifications issued after execution of the Contract thereto together form the Contract, and they are fully a part of the Contract as if written herein word for word. The following is an enumeration of the Drawings and Project Manual for this Project: 2.02 The Drawings: SHEET NUMBER A0.0 SHEET NAME SITE PLAN CURRENT REV. DATE CURRENT REV. # BD1.6 B UILDING DEMOLITION “AS BUILT” DRAWINGS BD1.7 B UILDING DEMOLITION “AS BUILT” DRAWINGS BD1.8 B UILDING DEMOLITION “AS BUILT” DRAWINGS D1.1 OVERALL DEMOLITION KEY CEILING & PLAN D1.2 DEMOLITION FLOOR PLAN – XXXX. 00 D1.3 DEMOLITION FLOOR PLAN – XXXX. 0, 0, 0 X0.0 XXXXXXXXXX XXXXX XXXX – XXXX. 0, 9 & 9 D2.0 DEMOLITION CEILING PLAN – XXXX. 0 & 16 A2.D1 DEMOLITION ROOF PLAN – BLDG. 2 A2.D2 DEMOLITION ROOF PLAN – BLDGS. 8 & 9 A2.D3 DEMOLITION ROOF PLAN – BLDGS. 1, 3, 4, 11 & 16 A2.D4 DEMOLITION ROOF PLAN – BLDGS. 5, 6, 7, 10, 12, 13, 14 & 15 A1.0 OVERALL KEY FLOOR PLAN A1.1 FLOOR PLANS – BLDGS. 2, 3 & 7 2-18-2019 1 A1.2 FLOOR PLAN – XXXX. 0 2-18-2019 1 A1.3 FLOOR PLAN – XXXX. 0 2-18-2019 1 A1.4 FLOOR PLAN – XXXX. 0 2-18-2019 1 A1.5 FLOOR PLAN – XXXX. 0 2-18-2019 1 A1.6 FLOOR PLAN – XXXX. 0 2-18-2019 1 A1.7 FLOOR PLAN – XXXX. 00 2-18-2019 1 A1.8 ENLARGED TLT. RM. FLOOR PLAN (BUILDING 16) 2-18-2019 1 A1.9 FLOOR PLAN – BUILDINGS 7 & 10 2-18-2019 1 LS1.3 L/S PLAN – XXXX. 0 2-18-2019 1 LS1.4 L/S PLAN – XXXX. 0 2-18-2019 1 LS1.5 L/S PLAN – XXXX. 0 2-18-2019 1 LS1.6 L/S PLAN – XXXX. 0 2-18-2019 1 LS1.7 L/S PLAN – XXXX. 00 2-18-2019 1 LS1.9 L/S PLAN – XXXX. 0 & 10 2-18-2019 1 A2.0 OVERALL KEY ROOF PLAN 2-18-2019 1 A2.1 ROOF PLAN – BUILDINGS 1 & 16 2-18-2019 1 A2.2 ROOF PLAN – BUILDING 2 (PARTIAL) 3-21-2019 2 A2.3 ROOF PLAN – BUILDING 2 (PARTIAL) 3-21-2019 2 A2.4 ROOF PLAN – BUILDING 3, 12, 15, 17 & 18 2-18-2019 1 A2.5 ROOF PLAN – BUILDINGS 4 (PARTIAL) 2-18-2019 1 A2.6 ROOF PLAN – BUILDING 4 (PARTIAL) & 11 3-21-2019 2 A2.7 ROOF PLAN – BUILDING 5 2-18-2019 1 A2.8 ROOF PLAN – BUILDING 6 2-18-2019 1 A2.9 ROOF PLAN – BUILDINGS 7, 13 & 14 2-18-2019 1 A2.10 ROOF PLAN – BUILDING 8 2-18-2019 1 A2.11 ROOF PLAN – BUILDING 9 2-18-2019 1 A2.12 ROOF PLAN – BUILDING 10 2-18-2019 1 A2.13 NOT USED A2.14 NOT USED A2.15 NOT USED A2.16 ROOF DRAINAGE PLAN – BUILDING 2 2-18-2019 1 A2.17 ROOF DRAINAGE PLAN – BUILDINGS 8 &9 2-18-2019 1 ...
ENUMERATION OF THE CONTRACT DOCUMENTS. 2.01 The Contract Documents consisting of the Agreement Form, M/WBE Program Requirements, Documents contained in the Project Manual, General and Supplementary Conditions, Drawings, Specifications, and all Addenda and modifications issued after execution of the Contract thereto together form the Contract, and they are fully a part of the Contract as if written herein word for word. The following is an enumeration of the Drawings and Project Manual for this Project: 2.02 The Drawings: Number Title No. Date G0.01 Cover Sheet 3 5-24-19 G0.02 General Info, Sheet index, & Code info 3 5-24-19 G0.03 Product Approval Sheet 3 5-24-19 A0.01 Architectural Site Plan 1 6-21-18 AD1.01A Partial First Floor Demo Plan Area “A” 3 5-24-19 AD1.01B Partial First Floor Demo Plan Area “B” 3 5-24-19 AD1.02 Overall Second Floor Demo Plan 3 5-24-19 AD1.03A Partial Roof Demo Plan Area “A” 3 5-24-19 AD1.03B Partial Roof Demo Plan Area “B” 3 5-24-19 AD1.04 Existing Roof Photos 1 6-21-18 AD1.05 Existing Roof Photos 1 6-21-18 AD1.06 Existing Roof Photos 1 6-21-18 A1.00 Overall Roof Plan & Drainage Calculations 1 6-21-18 A1.01A Partial First Floor Plan Area “A” 1 6-21-18 A1.01B Partial First Floor Plan Area “B” 1 6-21-18 A1.02 Overall Second Floor Plan 1 6-21-18 A1.03 Overall Roof Plan 3 5-24-19 A1.03A Partial Roof Plan Area “A” 3 5-24-19 A1.03B Partial Roof Plan Area “B” 3 5-24-19 A2.01 Elevations 1 6-21-18 A2.02 Existing Elevations 1 6-21-18 A3.01 Roof Details 3 5-24-19 A3.02 Roof Details 3 5-24-19 A7.01 Door Schedule 3 5-24-19 A7.02 Window Schedule 4 9-11-19 A7.03 Door Details 1 6-21-18 S1.01 S2.01 S2.02 S3.01 Wind Pressures Elevations – Xxxxx. #0, #0, #0 & #0 Xxxxxxxxx Xxxxxxxx Elevations Typical Details M0.00 Legend and Abbreviations 1 3-30-18 M0.01 General Notes 1 3-30-18 M1.01 Site Plan Mechanical 1 3-30-18 MD1.01 Overall First Floor Plan Mechanical Demolition 1 3-30-18 MD1.01A1 Partial Xxxxx Xxxxx Xxxx Xxxx X0 Mechanical Demolition 1 3-30-18 MD1.01A2 Partial Xxxxx Xxxxx Xxxx Xxxx X0 Mechanical Demolition 1 3-30-18 MD1.01B1 Partial Xxxxx Xxxxx Xxxx Xxxx X0 Mechanical Demolition 1 3-30-18 MD1.01B2 Partial Xxxxx Xxxxx Xxxx Xxxx X0 Mechanical Demolition 1 3-30-18 M1.01 Overall First Floor Plan Mechanical 1 3-30-18 M1.01A1 Partial First Floor Plan Area A1 Mechanical 1 3-30-18 M1.01A2 Partial First Floor Plan Area A2 Mechanical 1 3-30-18 M1.01B1 Partial Xxxxx Xxxxx Xxxx Xxxx X0 Mechanical 1 3-30-18 M1.01B2 Partial Xxxxx Xxxxx Xxxx Xxxx X0 Mechanical 1 3-30-18 MD1.02 Overall Second Floor...
ENUMERATION OF THE CONTRACT DOCUMENTS. The Contract Documents, except for Modifications issued after execution of this Contract, are enumerated as follows: (a) the Contract (b) Supplementary or other Conditions of the Contract as follows: Job Special Provisions (c) Construction Schedule (d) State Wage Order (order number) (e) The Addenda, if any, are as follows: (f) Owner’s Invitation for Bids for the Festus Well #8 and Well #10 Pump Replacement and Refurbishment project (g) Contractor’s Response (h) Insurance Certificates (i) E-verify Affidavit (j) Non-Collusion Affidavit (k) Performance and Payment Bond
ENUMERATION OF THE CONTRACT DOCUMENTS. The Subcontract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows:
ENUMERATION OF THE CONTRACT DOCUMENTS. The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: This executed Agreement Between Owner and Contractor (i.e. the Agreement) The General Conditions of the Contract for Construction Dated October 22, 2013 Other Documents, as follows: Exhibit – A– Summary of Scope of Work Exhibit – B – Legal Description of Property Exhibit – C – Specifications, Plans and Addenda Exhibit – D – Contractor Qualifications and Clarifications Exhibit – E – Project Schedule Exhibit – F – Milestone Dates and Delivery Requirements Exhibit – G – Liquidated Damage Provisions, if applicable Exhibit – H – Schedule of Values Exhibit – I – Unit Prices Schedule Exhibit – J – Allowances, Alternates, and Value Engineering Exhibit – K – Insurance Requirements Exhibit – L – Building Pad Certification Form Exhibit – M – Part 1 - Contractor Performance Bond Part 2- Labor and Material Payment Bond Exhibit – N – Part 1 - Subcontractor's Interim Lien Waiver and Release Upon Progress Payment Exhibit – N – Part 2 - Subcontractor's Interim Claim Waiver and Release Upon Progress Payment Exhibit – 0 – Part 1 - Subcontractor's Final, Unconditional Lien Waiver and Release Upon Final Payment Exhibit – 0 – Part 2 - Subcontractor's Final, Unconditional Claim Waiver and Release Upon Final Payment Exhibit – P – Part 1 - Contractor's Interim Lien Waiver and Release Upon Progress Payment Exhibit – P – Part 2 - Contractor's Interim Claim Waiver and Release Upon Progress Payment Exhibit – Q – Part 1 - Contractor's Final, Unconditional Lien Waiver and Release Upon Final Payment Exhibit – Q – Part 2 - Contractor's Final, Unconditional Claim Waiver and Release Upon Final Payment Exhibit – R – Contractor's Certificate of Payment; Release of Claims Exhibit – S – Subcontractor's Certificate of Payment; Release of Claims
AutoNDA by SimpleDocs
ENUMERATION OF THE CONTRACT DOCUMENTS. The contract documents consist of each one of the following: 1. This agreement. 2. The Xxxxxxx Irrigation Proposal dated 10-29-23 and Cover Letter dated 10-28-23. 3. Plans provided by Aqua Turf International dated 9-20-22. 4. Wesco materials quote dated 12-1-23 and Pro Pump and Controls materials quote dated 11-28-23 reflecting the project materials to be purchased directly by the club. If there are any conflicts between any of the provisions of this Agreement and provisions contained in the other documents named above, this Agreement shall govern.
ENUMERATION OF THE CONTRACT DOCUMENTS. § 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: § 8.1.1 The Agreement is this executed edition of AIA Document A142-2004, Standard Form of Agreement Between Design- Builder and Contractor. § 8.1.2 The Supplementary and other Conditions of the Contract, if any, are as follows:
ENUMERATION OF THE CONTRACT DOCUMENTS. The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 1. This Agreement for the analysis, design, fabrication, shipping, installation and documentation of vents for the enclosure of the Canada-France-Hawaii Telescope Corporation Observatory Facility. 2. The Special Conditions contained in Schedule “A.” 3. The Scope of Work, Deliverables and Specifications, contained in Schedule “B.” 4. Any agreement between CFHT and the State of Hawaii, Department of Land and Natural Resources, a copy of which will be attached as Schedule “C.” [to be attached upon receipt] 5. Any agreement between CFHT and the University of Hawaii, Office of Mauna Kea Management a copy of which will be attached as Schedule “D.” [to be attached upon receipt]