Estimate of Probable Construction Cost Sample Clauses

Estimate of Probable Construction Cost. CONSULTANT shall be responsible to design the PROJECT and provide an Estimate of Probable Construction Cost with the following procedures and requirements:
AutoNDA by SimpleDocs
Estimate of Probable Construction Cost. 11. Presentations to City Council, Parks and Recreation Board, and Aquatic Advisory Committee (6 presentations anticipated).
Estimate of Probable Construction Cost. The CONSULTANT shall submit two (2) full‐size sets of the construction plans to the OWNER for review and approval for each submittal. The submittal shall also include a digital copy of the construction plan drawings in PDF format. The OWNER will return to the CONSULTANT all pertinent comments. The CONSULTANT shall prepare traffic control plans that include a phasing sequence listing work to be done in each phase, traffic control diagrams and details of each phase (NCDOT Standard Layout or consultant prepared drawing), and any special considerations, such as time limitations, hour of day limitations, or intermediate completion times/liquidated damages to construct the proposed improvements. The design will include traffic control devices, barricades, signs, restrictions, and pavement markings required during construction of the recommended improvements. The OWNER will provide CONSULTANT names and contact information for Fire, Rescue, and Public‐School System to add to the construction documents. The plan will specify that the contractor shall be responsible for notifying affected entities of impending road closures 30 days prior to construction. The traffic control construction plans shall be sealed by a registered Professional Engineer and conform to the following:

Related to Estimate of Probable Construction Cost

  • DIRECT CONSTRUCTION COST Direct Construction Cost means the sum of the amounts that Contractor actually and necessarily incurs constructing the Project in strict compliance with the Construction Documents. Direct Construction Cost includes only the cost categories set forth in this Article and does not include the Pre-Construction Phase Fees or the Construction Phase Fees unless specifically noted. References in the UGSC to adjustments in “cost” or “costs” mean the Direct Construction Cost.

  • Opinion of Probable Cost Any opinions of probable Project cost or probable construction cost provided by Engineer are made on the basis of information available to Engineer and on the basis of Engineer’s experience and qualifications and represents its judgment as an experienced and qualified professional engineer. However, since Engineer has no control over the cost of labor, materials, equipment or services furnished by others, or over the contractor(s’) methods of determining prices, or over competitive bidding or market conditions, Engineer does not guarantee that proposals, bids or actual Project or construction cost will not vary from opinions of probable cost Engineer prepares.

  • Construction Cost Estimate At 50% completion of the contract documents, the design team will present and submit copies of the project plans and manual. The Construction Administrator will prepare and issue the fourth of five construction cost estimates. The estimate shall be derived from actual takeoffs, subcontractor and vendor input, and material and labor cost data. All quantitative systems information shall be provided in detail.

  • Construction Cost 3.1. Construction Cost does not include the fees of the ARCHITECT/ENGINEER and consultants, the cost of the land, rights- of-way, or other costs, which is the responsibility of the State as provided in Paragraphs 2.2 through 2.3. or any of the contingencies available for the project unless specifically stated otherwise.

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Reasonable Costs A cost is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person under the circumstances prevailing at the time the decision was made to incur the cost. In determining reasonableness of a given cost, consideration shall be given to:

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • Cost of Construction 1. During the Schematic Design, Design Development, and Construction Document Phases, the ARCHITECT’s estimates of Construction Cost shall be reconciled against the Budget approved by the DISTRICT pursuant to Article IV, Section 2.