Inspection and Commissioning Sample Clauses

Inspection and Commissioning. The Design-Builder shall be responsible for all inspection and commissioning of the PV Systems. Such activities shall be subject to the Department’s and DOEE’s review and approval and shall include, but are not limited to:
AutoNDA by SimpleDocs
Inspection and Commissioning. 8.1 The inspection and commissioning of the contract goods (including wind turbine generators and other primary devices provided hereunder) shall be conducted with presence of the Buyer’s inspectors. The Seller shall notify the Buyer in writing no less than fifteen (15) days prior to any inspection or commissioning of the contract goods. Should the Buyer’s inspectors fail to be present at the time reasonably required by the Seller, no thanks to the Seller, the latter is entitled to carry out the assembly, inspection and testing of the wind turbine generators and other devices independently.
Inspection and Commissioning. ‌ To ensure compliance with all electrical codes, an inspection by an independent commissioning agent is mandatory after construction is complete and must be included in Proposer’s price proposal. Commissioning tests shall be included in the final inspection and Quality Control Plan. The Proposer’s independent commissioning agent shall ensure that: • All equipment specifications match the proposed equipment specifications. • The physical layout aligns with the as-built diagrams with variations to proposed system noted. • The electrical system as laid out and connected aligns with the as built one-line diagrams including fuses, relays and switches with variation to proposed system noted. • Each array passes the open circuit voltage and current test. • The manual disconnect switch operates correctly.

Related to Inspection and Commissioning

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Inspections The Servicer shall inspect the Mortgaged Property as often as deemed necessary by the Servicer in accordance with Accepted Servicing Practices to assure itself that the value of the Mortgaged Property is being preserved. In addition, if any Mortgage Loan is more than 45 days delinquent, the Servicer promptly shall inspect the Mortgaged Property and shall conduct subsequent inspections in accordance with Accepted Servicing Practices or as may be required by the primary mortgage guaranty insurer. Upon request, the Servicer shall produce an electronic report of each such inspection.