MANHOLE CLEANING Sample Clauses

MANHOLE CLEANING. Both the upstream and downstream manholes are to be cleaned as a respective sewer segment is cleaned. The high-pressure hand gun system shall be used to clean all components of a manhole including the frame, rim, corbels, walls, troughs and inverts. No payment for work performed shall be made until the manholes at both ends of the sewer segment are satisfactorily cleaned. Manhole cleaning shall be in accordance with NASSCO MACP certified guidelines. Page 32 of 134 Attachment A
AutoNDA by SimpleDocs
MANHOLE CLEANING. The CONTRACTOR will remove all dirt, debris, roots and other solid and liquid materials from the sections of sewer manhole being cleaned to the extent that closed circuit television inspection can be performed. EXHIBIT B PRICING RFP CB 22 – 002 Payment shall be made on a draw basis, based on work completed (to be determined at pre-construction meeting). The City reserves the right to request that the contractor accept payments by credit card. CIPP REHABILITATION -SANITARY SEWER MAINS Table A - 8 Inch Diameter ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE A-1 6.0 mm normal thickness (.236") 65,500 LF TOTAL A Table B - 10 Inch Diameter ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE B-1 6.0 mm normal thickness (.236") 10,000 LF TOTAL B Table C - 12 Inch Diameter ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE CLEAN AND INSPECTION - SANITARY SEWER MAINS Table D-1 – Pre-Cleaning and Inspection ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE Table D-2 – Post-Cleaning and Inspection ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE Table E - Root Removal ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE Table F - Tuberculation Cleaning ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE Table G - Sanitary Sewer Lateral Grout ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE ANCILLARY GENERAL SERVICES Table H - Ancillary General Services - By-Pass Pumping ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE H-2 10 inch diameter 10,000 LF $ - Table I - Ancillary General Services Standard Service Reconnection ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE I-1 Standard Service Reconnection 1,385 Each TOTAL I Table J - Ancillary General Services Traffic Control FDOT Right of Way ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE J-2 Arrow Board LS $ J-3 Barricades LS $ J-4 Lane Dividers LS TOTAL J Table K - Ancillary General Services Traffic Control City Right of Way ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE K-2 Arrow Board LS K-3 Barricades LS K-4 Lane Dividers LS TOTAL K Table L - Ancillary General Services Easement Access ITEM DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE Table M - Ancillary G...

Related to MANHOLE CLEANING

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Final Cleaning Before final inspection of the work, the Contractor shall clean all ground occupied by the Contractor in connection with the work of all rubbish, excess materials, temporary structures and equipment, and all parts of the work must be left in a neat and presentable condition to the satisfaction of the Project Manager. However, the Contractor shall not remove any warning and directional signs prior to the formal acceptance by the Project Manager. Full compensation for final cleaning will be included in the prices paid for the various items of work or lump sum bid, as the case may be, and no separate payment will be made therefor.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Outdoor Lighting 3.7.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!