Project (Amended MOD 095 Sample Clauses

Project (Amended MOD 095. The Contractor shall be responsible for the management and operation of the Building 3019 Complex and support facilities, systems, and equipment (as defined in Section 2.4); during facility operations, dismantlement and construction, processing operations, facilities shutdown, and waste disposition. Operations include: handling; inspecting; shipping; receiving; and storing 233U -bearing materials (including MSRE traps) and facility surveillance and maintenance activities necessary to ensure equipment operability, the safety and health of employees and the public, and the protection of the environment. The Contractor shall manage and operate the Building 3019 Complex and support facilities in accordance with the requirements of the contract identified in Section J, List B, and the Work Smart Standards. The Contractor shall effectively manage and integrate all activities necessary to: (1) operate the Building 3019 Complex; (2) package and disposition the 233U from Building 3019A; and (3) complete safe deactivation of operations. The Contractor shall make the necessary repairs to preserve the structural integrity of the Building 3019 Complex and support facilities and to ensure operability of systems designed to remain operational after shutdown for a period not-to- exceed five (5) years. 1. The Contractor shall demolish and dispose of the 3020 Stack and establish a replacement capability. If required, the Contractor shall be responsible for obtaining the necessary blending agent to accomplish the required isotopic down-blend from the best available source. The Contractor shall package the material in accordance with the waste acceptance criteria for the appropriate disposal facility. The Government will furnish, as necessary, over-pack containers for temporary storage. The Contractor shall optimize packaging in order to minimize the number of containers for final disposition. The Contractor shall expedite off-site shipments within the constraint of the receiving sites schedule. The Contractor shall flush all processing systems and equipment used for the 233U processing operations. In particular, the Contractor shall ensure the removal of unattached solid waste materials and flush and clean piping and tanks to remove residual materials. After clean up has been completed, the Contractor shall radiologically characterize the aforementioned systems and equipment and provide radiological characterization data (D-16) to DOE. Additionally, the Contractor shall disp...
AutoNDA by SimpleDocs

Related to Project (Amended MOD 095

  • Contract Amendment A. Contract Exhibit A, Scope of Work, is hereby deleted and replaced in its entirety with the attached Exhibit A, Scope of Work, which is incorporated into the Contract by reference herein. B. Contract Exhibit B, Additional Special Contract Conditions, is hereby deleted in its entirety and replaced with the attached Exhibit B, Additional Special Contract Conditions, which is incorporated into the ACS by reference herein. C. Contract Exhibit I, PUR 1355: Foreign Country of Concern Attestation, is hereby incorporated in its entirety to the ACS by reference herein.

  • Change Orders and Contract Amendments 33.1 The Procuring Entity may at any time order the Supplier through notice in accordance GCC Clause 8, to make changes within the general scope of the Contract in any one or more of the following: a) drawings, designs, or specifications, where Goods to be furnished under the Contract are to be specifically manufactured for the Procuring Entity; b) the method of shipment or packing; c) the place of delivery; and d) the Related Services to be provided by the Supplier. 33.2 If any such change causes an increase or decrease in the cost of, or the time required for, the Supplier's performance of any provisions under the Contract, an equitable adjustment shall be made in the Contract Price or in the Delivery/Completion Schedule, or both, and the Contract shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must be asserted within twenty-eight (28) days from the date of the Supplier's receipt of the Procuring Entity's change order. 33.3 Prices to be charged by the Supplier for any Related Services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services.

  • Contract Amendments No amendment to or modification or other alteration of the Contract shall be valid or binding upon the State unless made in writing, signed by both parties and, if applicable, approved by the Connecticut Attorney General.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • Term of Agreement; Amendment; Assignment A. This Agreement shall become effective with respect to each Fund listed on Exhibit A hereof as of the date hereof and, with respect to each Fund not in existence on that date, on the date an amendment to Exhibit A to this Agreement relating to that Fund is executed. Unless sooner terminated as provided herein, this Agreement shall continue in effect for two years from the date hereof. Thereafter, if not terminated, this Agreement shall continue in effect automatically as to each Fund for successive one-year periods, provided such continuance is specifically approved at least annually by: (i) the Trust’s Board, or (ii) the vote of a “majority of the outstanding voting securities” of a Fund, and provided that in either event, the continuance is also approved by a majority of the Trust’s Board who are not “interested persons” of any party to this Agreement, by a vote cast in person at a meeting called for the purpose of voting on such approval. B. Notwithstanding the foregoing, this Agreement may be terminated, without the payment of any penalty, with respect to a particular Fund: (i) through a failure to renew this Agreement at the end of a term, (ii) upon mutual consent of the parties, or (iii) upon not less than 60 days’ written notice, by either the Trust upon the vote of a majority of the members of its Board who are not “interested persons” of the Trust and have no direct or indirect financial interest in the operation of this Agreement, or by vote of a “majority of the outstanding voting securities” of a Fund, or by the Distributor. The terms of this Agreement shall not be waived, altered, modified, amended or supplemented in any manner whatsoever except by a written instrument signed by the Distributor and the Trust. If required under the 1940 Act, any such amendment must be approved by the Trust’s Board, including a majority of the Trust’s Board who are not “interested persons” of any party to this Agreement, by a vote cast in person at a meeting for the purpose of voting on such amendment. In the event that such amendment affects the Advisor, the written instrument shall also be signed by the Advisor. This Agreement will automatically terminate in the event of its “assignment.” C. As used in this Section, the terms “majority of the outstanding voting securities,” “interested person,” and “assignment” shall have the same meaning as such terms have in the 1940 Act. D. Sections 7 and 8 shall survive termination of this Agreement.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.