SEQUENCING AND SCHEDULING a. The Design-Builder must perform all required connections to the existing utility systems without disruption to existing services. If disruption of the existing services is required, do not proceed without the approval of the Architect and Commission Representative, requested not less than seven (7) days, in advance.
SEQUENCING AND SCHEDULING. A. Owner will occupy portions of building immediately adjacent to work area. Conduct activities so Owner's operations will not be disrupted. Provide not less than 48 hours' notice to Owner of activities that will affect Owner's operations. – PRODUCTS
SEQUENCING AND SCHEDULING. A All Door Hardware shall be warranted by the local supplier and made good for a period of one year after the date of substantial completion. Improper installation, abuse, and lack of normal maintenance are not covered by this warranty. The Local Supplier’s warranty is not part of the Manufacturer’s warranty.
SEQUENCING AND SCHEDULING. Contractor to prepare a sequence and schedule for performance of the work suitable to the Owner and the operations of the facility. Owner will make reasonable allowances for the shut down and replacement of existing systems. Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of the Work. Such administrative procedures to include, but not be limited to: Preparation of schedules. Installation and removal of temporary facilities. Delivery and processing of submittals. Progress meetings. Contract acceptance procedures. Work with other contractors. COORDINATION Coordinate all construction activities as required to ensure efficient and orderly installation of each part of the Work. Where installation of one part of the Work is dependent on installation of other components, schedule and coordinate construction activities in the sequence required to obtain the best results. Where availability of space is limited, coordinate installation of different components to ensure maximum accessibility for required maintenance, service and repair. Make adequate provisions to accommodate items scheduled for later installation under separate contract or by Owner’s own forces. PERFORMANCE VERIFICATION BY CONTRACTOR Contractor to verify and document the full and proper operation of the complete system and system interfaces provided under this contract. Verification to include testing of all communication links including dialing, call request and cancel functions, volume level, and volume level adjustment. Proper routing of associated camera signals to operator monitors to be confirmed. System monitoring, paging, and music distribution to be verified for all devices providing those functions. All applicable intercom master station call handling and system control functions to be verified for each master station. Performance verification to ensure that system is configured as directed by the Owner for proper support of the facility’s operation.
SEQUENCING AND SCHEDULING. A. Test, adjust, and balance the air systems before hydronic, steam, and refrigerant systems.
SEQUENCING AND SCHEDULING. A. Preparation work shall be limited to those areas that can be covered completely with the new shingle roof system on the same day or before the arrival of inclement weather.
SEQUENCING AND SCHEDULING. A. Construct erosion and sediment control system prior to commencing any work.
SEQUENCING AND SCHEDULING. A. Application of surface hardener shall take place at least 10 days prior to any floor mounted furniture or equipment installation within the space.
SEQUENCING AND SCHEDULING. A. Unless otherwise specified, all Submittals required in this Section shall be submitted and approved prior to commencement of welding operations.
SEQUENCING AND SCHEDULING. 1.10.1. Contractor to prepare a sequence and schedule for performance of the work suitable to the Owner and the operations of the facility.