Supply of Material and Equipment Sample Clauses

Supply of Material and Equipment. (a) The Manufacturer shall supply all materials and equipment required to manufacture the Products, in compliance with the guidelines established by the Seller. Prior to manufacturing any Products, the Seller shall give all necessary notices, obtain all necessary pemlits and licenses and pay all the fees related to the performance of the work. Furthermore, the Manufacturer shall provide to the that the work conforms to the laws and regulations of all authorities having jurisdiction. (b) All patents, design rights, copyrights and other intellectual property rights relating to special tooling and which are not proprietary to the Seller's manufacturing process or the Know How shall be the property of the Manufacturer. The Seller agrees that any modifications to the design of the special tooling and any drawings based thereon or incorporating any designs or information provided by the Manufacturer shall be the property of and vest in the Manufacturer.
Supply of Material and Equipment. (a) The Manufacturer shall supply all materials and equipment required to manufacture the Products, in compliance with the guidelines established by the Seller. Prior to manufacturing any Products, the Manufacturer shall give all necessary notices, obtain all necessary permits and licences and pay all the fees related to the performance of the work. Furthermore, the Manufacturer shall provide to the Seller upon the Seller's request, copies of all certificates necessary as evidence that the work conforms to the laws and regulations of all authorities having jurisdiction. (b) All patents, design rights, copyrights and other intellectual property rights relating to special tooling which is specifically designed for manufacturing Products for Seller shall remain the property of the Seller. The Manufacturer agrees that any modifications to the design of the special tooling and any drawings based thereon or incorporating any designs or information based upon the Know-how of the Seller or necessary for the efficient manufacture of Products for the Seller shall be the property of the Seller.
Supply of Material and Equipment. Employer will supply the material and equipment
Supply of Material and Equipment. 5.1 Party B should order the material and equipment as per the requirements of design and standards, provide product certification, and inform Party A representatives to check and accept the material and equipment upon the arrival of goods. For the products which are not in conformity with the design and standards or yet accepted by Party A, Party B cannot use such product in the construction. Party B has to reorder qualified products as per the design and standards, and bear all the related expenses. If Party A does not accept the products in time, and the products are found to be unqualified according to the design and standards, then Party B should carry out dismantlement, restoration and reorder, and the expenses are at the account of Party B. the time limit for the construction cannot be prolonged accordingly. 5.2 If the test turns out be unqualified for the material which has to be used after test, stop ordering in case the order has not started, and for those which have been ordered and transported to the field, move the material out of the field by the purchaser. The related expenses and test fees are at the account of the purchaser.
Supply of Material and Equipment. 27. Supply of material & equipment by the Client 27.1 If the material and the equipment to be supplied by the Client, in accordance with the stipulations as agreed in the Special Provisions, the two parties shall make an agreed list of material and equipment as an attachment to the contract. The list shall include the items, specification, model, quantity, unit price, quality grade, time and place of delivery of the material and equipment supplied by the Client. 27.2 The Client shall provide the material and equipment as per the list and provide the Contractor catalogs and certificates of qualification of the material and the equipment and shall be responsible for their quality. The Client shall inform the Contractor in Written Form 24 hours prior to the arrival of the material and equipment and the Contractor should designate personnel to jointly check the material and equipment at site. 27.3 The Contractor shall take stock of the material and equipment supplied by the Client and safe keep them. The Client shall bear the expense for the storage of the material and equipment. The Contractor shall be responsible for any loss and damage of the material and equipment by reason attributable to the Contractor. If the Client fails to inform the Contractor to take stock of the material and equipment, the Contractor shall not be responsible for custody of the material and equipment, thus the Client shall bear the responsibility for the loss and damage of these material and equipment. 27.4 The Client shall bear the relevant responsibility in the event the supply of the material and equipment does not comply with the list. The specific content of the responsibilities to be borne by the Client shall be agreed upon by the parties in the Special Provisions according to the following situations: (1) Discrepancy in unit price form the list of materials and equipment, the Client shall be responsible for the difference in price; (2) Discrepancy in variety, specification, model, quality grade form the list of materials and equipment, the Contractor can refuse to receive custody of them, which shall be shipped out of the site by the Client and the Client is required to re-purchase the correct material and equipment; (3) Discrepancy in specification and model, the Contractor may replace them with other specification and model through the consent of the Client, and the Client shall be responsible for the expenses incurred; (4) Discrepancy in the place of delivery form the list...

Related to Supply of Material and Equipment

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • Supply of Materials The following materials will be supplied by the department Name of Materials Rate. Place of delivery 1.

  • Stored equipment We accept no responsibility for any stored equipment or other property brought on to or left at the premises, and all liability for loss or damage is hereby excluded. All equipment and other property (other than stored equipment) must be removed at the end of each hiring or we will charge fees each day or part of a day at the hire fee per hiring until the same is removed. We may, in our discretion, dispose of any items referred to below by sale or otherwise on such terms and conditions as we think fit, and charge you any costs we incur in storing and selling or otherwise disposing of the same, in any of the following circumstances: (i) your failure either to pay any charges in respect of stored equipment due and payable or to remove the same within seven days after the agreed storage period has ended (ii) your failure to dispose of any property brought on to the premises for the purposes of the hiring.

  • Supplies and Equipment The Union and employees will not use state-purchased supplies or equipment to conduct union business or representational activities. This does not preclude the use of the telephone for representational activities if there is no cost to the Employer, the call is brief in duration and it does not disrupt or distract from the Employer’s business.

  • SERVICES AND EQUIPMENT Section 21.01. Landlord shall, at its cost and expense: (a) Provide operatorless passenger elevator service Mondays through Fridays from 8:00 A.M. to 6:00 P.M., holidays excepted. A passenger elevator will be available at all other times. A freight elevator shall be available Mondays through Fridays, holidays excepted, only from 8:00 to 6:00 P.M. The freight elevator shall be available on a "first come, first served" basis during the said days and hours and on a reservation "first come, first served" basis other than on said days and hours at Landlord's customary charges therefor. (b) Maintain and repair the Building standard heating, ventilating and air conditioning system servicing the Demised Premises (the "HVAC System") installed by Landlord, except for those repairs which are the obligation of Tenant pursuant to Article 6 of this Lease. The HVAC System will be operated by Landlord as and when required by law, or for the comfortable occupancy of the Demised Premises (as determined by Landlord) throughout the year on Mondays through Fridays, holidays excepted, from 8:00 A.M. to 6:00 P.M.; provided that Tenant shall draw and close the draperies or blinds for the windows of the Demised Premises whenever the HVAC system is in operation and the position of the sun so requires and shall, at all times, cooperate fully with Landlord and abide by all of the Rules and Regulations which Landlord may prescribe for the proper functioning of the HVAC System. Landlord agrees to operate the HVAC System servicing the Demised Premises in accordance with their design criteria unless energy and/or water conservation programs, guidelines or laws and/or requirements of public authorities, shall provide for any reduction in operations below said design criteria in which case such equipment shall be operated so as to provide reduced service in accordance therewith. Tenant expressly acknowledges that some or all windows are or may be hermetically sealed and will not open and Landlord makes no representation as to the habitability of the Demised Premises at any time the HVAC System is not in operation. Tenant hereby expressly waives any claims against Landlord arising out of the cessation of operation of the HVAC System, or the suitability of the Demised Premises when the same is not in operation, whether due to normal scheduling or the reasons set forth in Section 21.03. Said system is designed to be capable of manufacturing, within tolerances normal in first-class office buildings, inside space conditions averaging 78 degrees Fahrenheit dry bulb and 50% relative humidity when outside conditions are 95 degrees Fahrenheit dry bulb and 75 degrees Fahrenheit wet bulb, and a temperature of not lower than an average of 68 degrees Fahrenheit when outside temperature is 50 degrees Fahrenheit or lower. Landlord will not be responsible for the failure of the HVAC System if such failure results from the occupancy of the Demised Premises by more than an average of one (1) person for each one hundred (100) square feet in any separate room or area, and upon a combined lighting and standard electrical load not to exceed three (3) xxxxx per usable square foot (excluding the Building HVAC), or if Tenant shall install and operate machines, incandescent lighting and appliances the total connected electrical load in excess of the Building's electrical specifications, as determined by Landlord's consulting engineers. If Tenant shall occupy the Demised Premises at an occupancy rate of greater than that for which the HVAC System was designed, or if the total connected electrical load is in excess of the Building's electrical specifications, as determined by Landlord's consulting engineers, or if Tenant's partitions shall be arranged in such a way as to interfere with the normal operation of the HVAC System, Landlord may elect to make changes to the HVAC System or the ducts through which it operates required by reason thereof, and the cost thereof shall be reimbursed by Tenant to Landlord, as additional rent, within twenty (20) days after presentation of a xxxx therefor. Landlord, throughout the term, shall have free access to all mechanical installations of Landlord, including but not limited to air-cooling, fan, ventilating and machine rooms and electrical closets, and Tenant shall not construct partitions or other obstructions that may interfere with Landlord's free access thereto, or interfere with the moving of Landlord's equipment to and from the enclosures containing said installations. Neither Tenant nor any person or entity within Tenant's control shall at any time enter the said enclosures or tamper with, adjust, touch or otherwise in any manner affect said mechanical installations, except as set forth herein with respect to the thermostatic controls within the Demised Premises. (c) Provide Building standard cleaning services in Tenant's office space and public portions of the Building, except no services shall be performed Saturdays, Sundays and holidays, in accordance with Schedule "D" annexed hereto and made part hereof. If, however, any additional cleaning of the Demised Premises is to be done by Tenant, it shall be done at Tenant's sole expense, in a manner reasonably satisfactory to Landlord and no one other than persons approved by Landlord shall be permitted to enter the Demised Premises or the Building for such purpose. Tenant, at its own cost, may utilize its own employees or outside contractors to perform additional cleaning services in the Demised Premises, provided such employees or outside contractors do not cause any labor disruption or dispute or violate Landlord's union contracts affecting the Building. However, such use of outside contractors shall be subject to the right of Landlord to match the costs chargeable by such outside contractors, in which event Landlord shall perform such services at such cost, to be paid by Tenant within twenty (20) days after being billed therefor. Tenant shall pay to Landlord the cost of removal of any of Tenant's refuse and rubbish from the Demised Premises and the Building (i) to the extent that the same, in any one day, exceeds the average daily amount of refuse and rubbish usually attendant upon the use of such Demised Premises as offices, as described and included in Landlord's cleaning contract for the Building or recommended by Landlord's cleaning contractor, and (ii) related to or deriving from the preparation or consumption of food or drink, excluding food or drink for normal business use. Bills for the same shall be rendered by Landlord to Tenant at such time as Landlord may elect and shall be due and payable as additional rent within twenty (20) days after the time rendered. Tenant, at Tenant's expense, shall cause the Demised Premises to be exterminated from time to time to the satisfaction of Landlord and additionally shall cause all portions of the Demised Premises used for the storage, preparation, service or consumption of food or beverages to be cleaned daily in a manner reasonably satisfactory to Landlord, and to be treated against infestation by vermin, rodents or roaches, whenever there is evidence of any infestation. Tenant shall not permit any person to enter the Demised Premises or the Building for the purpose of providing such extermination services, unless such persons have been approved by Landlord. If so requested by Landlord, Tenant shall store any refuse generated by the consumption of food or beverages on the Demised Premises in a cold box or similar facility. (d) Furnish hot and cold water for lavatory and drinking purposes. If Tenant requires, uses or consumes water for any other purposes, Landlord may install a meter or meters or other means to measure Tenant's water consumption, and Tenant shall reimburse Landlord for the cost of the meter or meters and the installation thereof, and shall pay for the maintenance of said meter equipment and/or pay Landlord's cost of other means of measuring such water consumption by Tenant. Tenant shall pay to Landlord on demand the cost of all water consumed as measured by said meter or meters or as otherwise measured, including sewer rents. (e) If Tenant shall require and request any of the foregoing services at times other than above provided, and if such request is made at least twenty-four (24) hours prior to the time when such additional services are required, Landlord will provide them and Tenant shall pay to Landlord promptly thereafter the charges therefor at the then Building standard rate charged to other tenants in the Building. Section 21.02. Holidays shall be deemed to mean all federal holidays, state holidays and Building Service Employees Union Contract holidays. Section 21.03. Landlord reserves the right to interrupt, curtail or suspend the services required to be furnished by Landlord under this Lease when necessary by reason of accident, emergency, mechanical breakdown or when required by any law, order or regulation of any Federal, State, County or Municipal authority, or for any other cause beyond the control of Landlord. Landlord shall use due diligence to complete all required repairs or other necessary work as quickly as possible so that Tenant's inconvenience resulting therefrom may be for as short a period of time as circumstances will reasonably permit. Except as otherwise provided in this Lease, Tenant shall not be entitled to nor shall Tenant make claim for any diminution or abatement of minimum rent or additional rent or other compensation, nor shall this Lease or any of the obligations of Tenant be affected or reduced by reason of such interruption, curtailment, suspension, work or inconvenience. Section 21.04. Tenant shall reimburse Landlord promptly for the actual out-of-pocket cost to Landlord of removal from the Demised Premises and the Building of any refuse and rubbish of Tenant not covered by the Cleaning Specifications (Schedule D) and Tenant shall pay all bills therefor when rendered. Section 21.05. If Tenant shall request Landlord to furnish any services in addition to those hereinabove provided or perform any work not required under this Lease, and Landlord agrees to furnish and/or perform the same, Tenant shall pay to Landlord promptly thereafter the charges therefor, which charges are deemed to be additional rent and payable as such. Section 21.06. Landlord shall provide security in the Building lobby and Tenant shall have access to the Demised Premises twenty-four (24) hours per day, seven (7) days per week, subject to emergencies, police power and Article 34. Section 21.07. Landlord represents that the Building facility equipment is Y2K ready and the Building shall be operated and maintained as a first-class building similar to other first-class buildings in the vicinity of the Building.

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Local Government for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier will be notified by the Local Government of the Local Government’s obligations under this Agreement and the Acts and Regulations relative to Nondiscrimination on the grounds of race, color, or national origin.

  • Quality of Materials and workmanship The Contractor shall ensure that the Construction, Materials and workmanship are in accordance with the requirements specified in this Agreement, Specifications and Standards and Good Industry Practice.

  • Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except:

  • Solicitations for Subcontracts, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Engineer of the Engineer's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.