WORK COVERED BY CONTRACT DOCUMENTS. 1. Work of this Contract comprises , an Atlanta Public School Facility
WORK COVERED BY CONTRACT DOCUMENTS. A. Work covers design and construction of a County of Orange project as precisely defined in the contract documents. ..............................................................................................................................................
WORK COVERED BY CONTRACT DOCUMENTS. A. Work of this Contract comprises Atlanta Public School Facility.
1. 01B. WORK BY OTHERS
1. 01C. WORK SEQUENCE (Omitted)
WORK COVERED BY CONTRACT DOCUMENTS. The work covers park improvements to Olive Bowl Park, Lindsay, California. Work includes clearing, grading, paving, site utilities, electrical service, security and sports lighting, ball fields, chain link backstop, skate park, play areas, exercise stations, site furnishings, welcome sign, concrete headers, walks, slabs and curbs, asphalt base and paving, masonry block walls, ornamental fencing, restroom/concession buildings, shade shelters, water quality detention, decomposed granite paving, landscape planting, automatic irrigation system, 30 day plant establishment period and 60 day project maintenance. The work to be performed shall include, but not be limited to, the items described. All work shall include the furnishing of labor, services, tools, equipment, materials, appurtenances and incidentals necessary to install and complete the work contemplated per the plans and specifications.
WORK COVERED BY CONTRACT DOCUMENTS. A. The Work of this Contract comprises the general construction of a 103,000 GSF new facility to house the College of Engineering and Technology located on the Xxxxxxxx State University campus for the Board of Regents of The Texas A&M University System.
B. The Drawings and Specifications do not necessarily indicate or describe all Work required for completion of Project.
C. The Contract Documents describe the essential elements sufficiently to determine the scope of the Project.
D. Provide all items required for complete operating systems including items not necessarily shown in these Contract Documents, but that can be reasonably inferred as being required for a complete operating system.
E. The Drawings and Specifications indicate the basic quality of material and quality of construction required for the entire Project.
WORK COVERED BY CONTRACT DOCUMENTS. 1 Work of this Contract comprises general construction of a new Pan Am Pool Lobby located in Winnipeg Manitoba. .2 The work of this contract generally includes, but is not necessarily limited to: .1 Demolition of existing ramp, railings, walls, suspended ceiling tiles, ceramic tiles, existing suspended ceiling over the existing information desk, information desk stairs and concrete wall where indicated.
WORK COVERED BY CONTRACT DOCUMENTS. 1 Work of this Contract comprises general construction of a toboggan shelter building, toboggan chutes, lookout tower, accessible ramp and exterior improvements at St.Vital Park in Winnipeg, MB. .2 The work of this contract generally includes, but is not limited to: .1 Rough grading, excavation, and installation of granular material.
WORK COVERED BY CONTRACT DOCUMENTS. A. This Contract is for the Potable Water Clarifier Tank – Accelator #3 Rehabilitation, located at 0000 Xxxxxxxxxxx Xxxx., Naples, Florida 34102; as described and specified herein. The Work consists of furnishing all labor, equipment, materials, permitting, and ancillary items for the Rehabilitation of the facility consisting of, but not limited to, the following:
1. All work for the Project shall be constructed in accordance with the Specifications herein, all applicable building codes, approved submittals provided by the successful bidder, and strictly adhering to all manufacturer’s recommendations and requirements of the selected products.
2. The proposed improvements will be awarded and completed, if award is made, under one Contract.
WORK COVERED BY CONTRACT DOCUMENTS. A. This Contract comprises the construction of the new Oak Grove Forcemain installation as shown on the Construction Drawings and specified in the Contract Documents including the General Conditions, Special Conditions, and Technical Specifications. The work consists of furnishing all labor, equipment and materials (unless otherwise noted), including but not limited to, the following:
1. Approximately 1,357 Linear Feet (LF) of 20-inch Steel casing pipe installed via horizontal directional drill.
2. Approximately 1,357 LF of 12” HDPE (DR11) forcemain carrier pipe installed via horizontal directional drill.
3. Approximately 9,350 LF of 10-inch PVC (DR18) forcemain by open cut construction and all necessary appurtenances.
4. Approximately 480 LF of 18” C900 DR 18 Casing pipe at road crossings.
5. Asphalt cut and repairs as shown on the approved plans (linear and crossing)
6. All bends, air release valves, and plug valves as required per the approved plans.
7. All driveway cuts and repairs in-kind.
8. Traffic Control
9. Demolition and removal as required per the approved plans
10. All associated mobilization/demobilization, demolition, tree removal, proper disposal of drilling mud and other fluids and materials, required staging and work areas, removal, disposal and replacement of unsuitable soils, dewatering, all joint materials, fittings, gaskets, adapters, and coatings, all testing, soil erosion and sedimentation control, maintenance of traffic, complete project area restoration, adherence to all permit requirements including sampling and monitoring, project photographs and videos, as-builts and record documents, and all other work and appurtenances shown on the Construction Drawings and indicated or implied in the Contract Documents and Specifications, or required for the forcemain system complete and ready for use.
B. The Contractor shall furnish all labor, equipment, tools, services and incidentals to complete all Work required by these Specifications and as shown on the Construction Drawings.
C. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration required as a result of damages caused during this construction.
D. All materials, equipment, skills, tools and labor which is reasonably and properly inferable and necessary for the proper completion of the Work in a substantial manner and in compliance with the requirements stated or impl...
WORK COVERED BY CONTRACT DOCUMENTS. A. Project Identification: Beech Street Elementary School Café Storefront Replacement Project
1. Project Location: 000 Xxxxx Xxxxxx, Xxxxxxxxxx, Xxx Xxxxxxxxx.
B. Owner: City of Manchester, 000 Xxxxxx Xxxxxx, Xxxxxxxxxx, Xxx Xxxxxxxxx 00000-0000.