MEASUREMENT AND PAYMENT - Lump Sum Sample Clauses

MEASUREMENT AND PAYMENT - Lump Sum. For the type of alternate design bridge structure selected, subject to a reduction equal to the amount of the Contractor's share of the Department's engineering costs to be determined as follows: • For each alternate bridge structure with lump sum bid item amount less than $2,000,000 = 2% of the lump sum bid amount for structure • For each alternate bridge structure with lump sum bid item amount over $2,000,000 = $40,000 plus 0.25% of the lump sum bid amount over $2,000,000, total amount not to exceed $85,000 Each alternate bridge structure involving a redesign from cast- in- place diaphragms to precast diaphragms will be subject to a reduction of $300 per structure if contractor's bid lump for lump sum item is less than $2,000,000 and a reduction of $750 per lump sum item if structure is over $2,000,000, for the amount of the Contractor's share of the Department's engineering cost. The Contractor's share of the Department's engineering costs will be recovered by processing a contract adjustment (Alternate Design Review) to reduce the contract lump sum price by an amount equal to the Contractor's share. A utility company's share of fabricated structural steel and/ or installation of sleeves, inserts, casings, hanger assemblies, ducts, etc. for utilities is to be a separate item. Do not include the utility company's share in the bid price for the alternate design bridge structure unless otherwise specified. For an alternate design bridge structure, all items of work are to be included in and will be paid for as part of the contract lump sum price; except, bearing piles; pile tip reinforcement; pile load tests; dynamic pile testing; Class C cement concrete under footings; Class 3 excavation, reinforcement bars, and Class A cement concrete for pedestals; and caissons. Placing deck concrete in excess of the indicated quantity will not be considered a change from the design. The contract lump sum price for each alternate bridge structure includes full compensation for all deck concrete.
AutoNDA by SimpleDocs
MEASUREMENT AND PAYMENT - Lump Sum. F09.00 EXPRESS E-ZPASS CLOSURE COORDINATION In accordance with Section 105.07 and as follows: During Stage 1 of this project, the Express E-ZPass tolling area will be under construction by others. The Express E-ZPass Contractor is limited to a closure period from Friday evening March 17, 2017 at 9:00 PM to Monday morning April 10, 2017 at 5:00 AM. The allowable working hours do not apply during this time period. Perform the work, including all required traffic control for the Express E-ZPass Contractor, in accordance with the staging as indicated and in Special Provision F08.00. Coordinate work within the allowable closure area. During the express E-ZPass closure, no vehicle traffic, which includes any construction or inspection vehicular traffic, is permitted through the express lanes between the stations bounded by the north and south express lane toll gantries. Where conflict(s) between necessary work operations exists between the Express E-ZPass contract and this project, the Express E-ZPass contract will have priority. The Representative will be the sole and final authority for determining priorities relative to schedule and work to be performed. The decision of the Representative will be final and binding and work will be performed as directed at no additional cost to the Commission for the alteration and adjustment of schedule and work item quantities. Unrestricted access is required at all times to the express E-ZPass lanes for the E-ZPass Contractor’s vehicles and personnel. Allow access to facilitate crane mobilization and demobilization, material delivery, and box trucks. Full access is required to the Express lanes between Station A-98+00 and A- 107+00 for vehicles to pass through for equipment testing. Within 4 hours of notification by the Representative, perform all work required to reinstall glare screen, remove traffic control and open the express lanes to unrestricted traffic.
MEASUREMENT AND PAYMENT - Lump Sum. Includes the Preliminary Project Schedule, the CPM Schedule, Look Ahead Schedules, monthly updates, recovery schedules, all submissions and revisions, software purchases and training, attendance at scheduling meetings, and any work required to provide an acceptable CPM Schedule. 50 percent of the item will be paid when the CPM Schedule is accepted and the remaining 50 percent of the item will be paid on a prorated monthly basis (based on the duration of the project). Monthly pay estimates will be withheld if the monthly updates and recovery schedules are not submitted. A07.00 CONSTRUCTION NOISE CONTROL & COMMUNITY COORDINATION 04/01/11
MEASUREMENT AND PAYMENT - Lump Sum. Includes all material and labor necessary to construct, maintain, clean and remove temporary features for each crossing.
MEASUREMENT AND PAYMENT - Lump Sum. This item will be measured and paid for in a proportionate manner, one designated by the Department. If an acceptable open cut excavation is provided in lieu of the temporary excavation support indicated, payment will be made for the as- bid lump sum temporary excavation support item, but no additional payment will be made for any class of excavation, structure backfill or additional shoring as a result of the open cut excavation or to restore the facilities to their original condition. 00 - bCLASS AA CEMENT CONCRETE MODIFIED ‌ Addendum: Associated Item(s): Header: CLASS AA CEMENT CONCRETE MODIFIED Provision Body:
MEASUREMENT AND PAYMENT - Lump Sum. F18.00 WIRELESS COMMUNICATIONS SYSTEM PA TURNPIKE COMMISSION (ITEM: 4000-0010) F18.01 General – Coordinate, install and test a communications system to convey data between DMS Field Locations and the TOC at the Highspire facility. The communications system will utilize a 4G LTE capable wireless WAN (WWAN) router for network connectivity to transfer the control and status data between the DMS location and the Commission’s TOC in Highspire. The WWAN router and antennas along with other materials will be provided by the Commission. Install, integrate and test the communication system at the locations noted in this contract, to the approval of the Commission. No additional payments will be for the communication system.
MEASUREMENT AND PAYMENT - Lump Sum. Partial payment will be made for the design activity based on the approved Schedule of Values in accordance with Section IX of the Special Provision titled SPECIAL BIDDING – DESIGN-BUILD, utilizing the following components: • NPDES Permit Application Initial Submission • NPDES Permit Issuance • Waterway Permit Application Initial Submission • Waterway Permit Issuance I1072A - c01072 ITEM 9000-2000 - UTILITY RELOCATION INFORMATION FOR DESIGN/BUILD PROJECTS‌ Addendum: Associated Item(s): 9000-2000 Header: ITEM 9000-2000 - UTILITY RELOCATION INFORMATION FOR DESIGN/BUILD PROJECTS Provision Body:
AutoNDA by SimpleDocs
MEASUREMENT AND PAYMENT - Lump Sum. Full payment for Utility Coordination will be made upon completion of all utility facility relocations on the project. I6091F - c06091 XXXX 0000-0000 EQUIPMENT PACKAGE ‌ Addendum: Associated Item(s): Header: XXXX 0000-0000 EQUIPMENT PACKAGE Provision Body: Appendix Table A EQUIPMENT PACKAGE Equipment Quantity Communications Equipment Copier (1) 1 Fax Machine (1) 1
MEASUREMENT AND PAYMENT - Lump Sum. Partial payment will be made for the design activity based on the approved Schedule of Values in accordance with Section IX the Special Provision titled SPECIAL BIDDING – DESIGN-BUILD, utilizing the following components: • Pre-Final Plan Approval • Signing and Pavement Marking Plan Approval • Final Roadway Drawings Approval • As-Built Drawings I29901A - c29901 ITEM 8800-0002 CONSTRUCT ROADWAY ‌ Addendum: Associated Item(s): 8800-0002 Header: ITEM 8800-0002 - CONSTRUCT ROADWAY Provision Body:
MEASUREMENT AND PAYMENT - Lump Sum. Partial payment will be made for all work indicated on the Final Roadway Drawings based on the approved Schedule of Values in accordance with Section IX of the Special Provision titled SPECIAL BIDDING – DESIGN-BUILD. I29902A - c29902 XXXX 0000-0000 DESIGN TRAFFIC CONTROL PLAN ‌ Addendum: Associated Item(s): 8901-1001 Header: XXXX 0000-0000 - DESIGN TRAFFIC CONTROL PLAN Provision Body: