USE OF SITE AND CLEAN UP Sample Clauses

USE OF SITE AND CLEAN UP. Design Build Entity shall confine operations at the Site to areas permitted by law, ordinances, permits, the Contract Documents, and, to the extent applicable, rules or regulations of the Court. Design Build Entity shall not unreasonably encumber the Site with materials or equipment 13.19.17.1. The Site may be an active Court site. If it is, Design Build Entity and its performance of the Work shall not interfere with the operations of the Court. Design Build Entity is responsible for coordinating with Court administrative and maintenance staff for access to any portion of the Site, minimizing disruption to Court operations (if an active courthouse), and obtaining copies of any Site access and other rules applicable to Work at the Court. Design Build Entity’s failure to comply with this section shall constitute a material breach of the Agreement. 13.19.17.2. Design Build Entity shall, during performance of the Work, keep the Site and surrounding area free from the accumulation of excess dirt, waste materials, and rubbish arising from the Work at the Site. Design Build Entity shall remove all excess dirt, waste material, and rubbish arising from the Work at the Site; tools; equipment; machinery; and surplus materials from the Site and surrounding area at the Final Completion of the Work. 13.19.17.3. Design Build Entity shall be responsible to maintain the site including access to work areas during winter months. This may include any dewatering activities, soil stabilization needed to maintain a workable jobsite, and allowing adequate labor and equipment access to the areas of Construction Work. 13.19.17.4. Design Build Entity shall grade the Site to drain, maintain excavations free of water, protect the Site from puddling, provide for drainage of storm water and such water as may be applied or discharged on the Site in the performance of the Work. Drainage facilities shall be adequate to prevent damage to the Work, the Site, and adjacent property.
AutoNDA by SimpleDocs
USE OF SITE AND CLEAN UP. 3.13.1 Contractor shall confine operations at the Project site to areas permitted by law, ordinances, permits, and the Contract Documents. Contractor shall not unreasonably encumber the Project site with materials or equipment. 3.13.2 Contractor shall, during performance of the Work, keep the Project site and surrounding area free from the accumulation of excess dirt, waste materials, and rubbish caused by Contractor. Contractor shall remove all excess dirt, waste material, and rubbish caused by the Contractor; tools; equipment; machinery; and surplus materials from the Project site and surrounding area at the completion of the Work. 3.13.3 Personnel of Contractor and Subcontractors shall not occupy, live upon, or otherwise make use of the Project site during any time that Work is not being performed at the Project site, except as otherwise provided in the Contract Documents.
USE OF SITE AND CLEAN UP. 3.24.1 The Design Build Entity shall confine operations at the Project site to areas permitted by law, ordinances, permits, and the Contract Documents. The Design Build Entity shall not unreasonably encumber the Project site with materials or equipment. 3.24.2 The Design Build Entity shall, during performance of work on the Project, keep the Project site and surrounding area free from the accumulation of excess dirt, waste materials, and rubbish caused by the Design Build Entity. The Design Build Entity shall remove all excess dirt, waste material, and rubbish caused by the Design Build Entity; tools; equipment; machinery; and surplus materials from the Project site and surrounding area at the completion of the Project. 3.24.3 Personnel of the Design Build Entity and Subcontractors shall not occupy, live upon, or otherwise make use of the Project site during any time that work is not being performed at the Project site, except as otherwise provided in the Contract Documents.
USE OF SITE AND CLEAN UP. 4.7.1. The Contractor shall confine operations at the Site to areas permitted by law, ordinances or permits, subject to any restrictions or limitations set forth in the Contract Documents. The Contractor shall not unreasonably encumber the Site or adjoining areas with materials or equipment. The Contractor shall be solely responsible for providing security at the Site with all such costs included in the Guaranteed Maximum Price. 4.7.2. The District shall be providing CM and PI site supervision Monday through Friday from 7:00 AM to 3:30 PM. Working hours shall conform to local laws, which includes no street parking, deliveries, hoisting, welding, etc. or equipment startup. Scheduled and limited exceptions such as utility shutdowns and tie-ins to existing work shall be performed during “off-hours”. All Work performed during off-hours must be coordinated and approved by the District, with a minimum of 48 hour notice. The Contractor is responsible for the costs of all overtime, shift time differentials, and other premium time costs required to achieve the schedule commitments. This includes, but is not limited to, work in excess of eight (8) hours per day, forty (40) hours per week, and/or work on Saturdays, Sundays and Holidays. If Contractor is behind schedule or not working full shifts in accordance with the hours indicated above, they shall be considered behind schedule and responsible for delay impacts. 4.7.3. The Contractor shall at all times keep the Site and all adjoining areas free from the accumulation of any waste material or rubbish caused or generated by performance of the Work. Contractor shall be aware of and take appropriate measure to avoid nuisances. Should the Project Inspector determine that any waste materials, rubbish, or other stored materials have become a nuisance; the Contractor will remedy the condition immediately upon oral and/or written notice. Contractor shall separately contain hazardous and unsanitary waste materials from other waste and xxxx each container appropriately and dispose of legally. Contractor shall maintain the Site in a "broom-clean" standard on a daily basis. Prior to completion of the Work, Contractor shall remove from the Site all rubbish, waste material, excess excavated material, tools, Construction Equipment, machinery, surplus material and any other items which are not the property of the District under the Contract Documents. If the Contractor fails to clean up as provided for in the Contract Documents, th...
USE OF SITE AND CLEAN UP. Contractor shall confine its operations to areas permitted by the Contract Documents and keep the Project site clean and free from unreasonable accumulation of excess dirt, materials, or waste caused by Contractor.

Related to USE OF SITE AND CLEAN UP

  • Markings If permitted by applicable Law, on or reasonably promptly after the Closing Date, Owner will cause to be affixed to, and maintained in, the cockpit of the Airframe and on each Engine, in each case, in a clearly visible location, a placard of a reasonable size and shape bearing the legend: “Subject to a security interest in favor of Wilmington Trust, National Association, not in its individual capacity but solely as Mortgagee.” Such placards may be removed temporarily, if necessary, in the course of maintenance of the Airframe or Engines. If any such placard is damaged or becomes illegible, Owner shall promptly replace it with a placard complying with the requirements of this Section.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!