Mechanical Operations definition

Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc. Specific equipment requirements and fire precautionary measures are shown in the following table and in C7.22#: Page
Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc.
Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc. Specific equipment requirements and fire precautionary measures are shown in the following table and in C7.22#: C7.22# - EMERGENCY PRECAUTIONS (06/2012) Purchaser's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Unless otherwise agreed in writing, Project Activity Levels applicable to this project shall be the predicted levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Sale Area Map legend. Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day's activity level by 6:00 PM. Purchaser shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day. Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Purchaser is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below. C8.212 - MARKET-RELATED CONTRACT TERM ADDITION (11/2008) The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser's written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser's written request for a market-related contract term addition before the expiration of this contract. No more than 3 y...

Examples of Mechanical Operations in a sentence

  • This piece of equipment shall have effective communication with the Hot Saw or Masticator.b) Any additional restrictions specified by the Forest.3. All other conventional Mechanical Operations are permitted until 1:00 PM.4. Some operations may be permitted after 1:00 PM, on a case-by-case basis, under the terms of a PAL Ev Variance Agreement.

  • Immediately after Mechanical Operations cease, Fire Patrol is required for two hours.

  • In general, the policy and institutional environment in Botswana is favorable with regard to meeting children’s needs, protecting children, and defending their rights.

  • Mechanical Operations: The process of felling, skidding, chipping, shredding, masticating, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders , dozers etc.

  • All other conventional Mechanical Operations are permitted until 1:00 PM.4. Some operations may be permitted after 1:00 PM, on a case-by-case basis, under the terms of a PAL Ev Variance Agreement.

  • After discussion was held by the Board, a motion was made by Schultz, and second by Shea, to approve Job Description of Site Manager, and Job Description of Mechanical Operations & Maintenance Manager.UNANIMOUS VOTE.

  • VRE’s Director of Mechanical Operations will be the point of contact following award of a Purchase Order.

  • Work may include, but is not limited to, air sealing, insulation, and base load measures involved in weatherizing the house. 6 Mechanical Operations – Actual costs in this item include, but are not limited to, testing and evaluation of combustion appliances, furnace repair or replacement, electric heating and hot water heaters including the addition of mechanical ventilation to a dwelling.

  • Since then, District staff and the architect have been working together to find a solution that will accomplish the goal of housing the Mechanical Operations and Field Operations Departments while lowering the construction cost.

  • The minimum mechanical cost for a unit to be counted as a Mechanical Operations completion is $300.00. 7 Capital Intensive Operations – Actual costs that combine those associated with Base and Mechanical Operations.


More Definitions of Mechanical Operations

Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc. Specific equipment requirements and fire precautionary measures are shown in the following table and in C7.22#: C7.22# - EMERGENCY PRECAUTIONS (06/2012) Purchaser's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Unless otherwise agreed in writing, Project Activity Levels applicable to this project shall be the predicted levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Sale Area Map legend. Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day's activity level by 6:00 PM. Purchaser shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day. Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Purchaser is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below. C8.64 - DEBARMENT AND SUSPENSION CERTIFICATION (03/2018) Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. 'Subcontractors' are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and infor...
Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc. Specific equipment requirements and fire precautionary measures are shown in the following table and in C7.22#:
Mechanical Operations means field operations, for example, harvesting, manure spreading, ploughing or discing;
Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc. Specific equipment requirements and fire precautionary measures are shown in the following table and in C7.22#: C7.22# - EMERGENCY PRECAUTIONS (06/2012) Purchaser's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Unless otherwise agreed in writing, Project Activity Levels applicable to this project shall be the predicted levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Sale Area Map legend. Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day's activity level by 6:00 PM. Purchaser shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day. Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Purchaser is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below. C8.66# (Option 1) - USE OF TIMBER (04/2004)
Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc. Specific equipment requirements and fire precautionary measures are shown in the following table and in K- H.2.2#: Page 75 K-H.2# - SPECIFIED FIRE PRECAUTIONS (06/2012) Contractor or a designated Contractor’s Representative shall certify compliance with specific Contract and California Public Resources Code (CPRC) fire precautionary measures in H.1 Plans, K-H.2# and K-H.2.2#. Certification shall be provided prior to starting operations during Fire Precautionary Period and shall be updated as needed. Listing of specific fire precautionary measures in the following subsections is not intended to relieve Contractor in any way from compliance with State fire laws covering fire prevention and suppression equipment applicable to Contractor's Operations. Upon request of Forest Service, Purchaser shall permit and assist in periodic testing and inspection of required fire equipment. The following definitions shall apply to H.2# and K-H.2.2#:
Mechanical Operations. The process of felling, skidding, chipping, shredding, piling, log processing and/or yarding which requires the use of motorized power which includes, chainsaws, chippers, motorized carriages, masticators, stroke delimbers, skidders etc. Specific equipment requirements and fire precautionary measures are shown in the following table and in K- H.2.2#: K-H.2.2# - EMERGENCY PRECAUTIONS (06/2012) Contractor's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Unless otherwise agreed in writing, Project Activity Levels applicable to this project shall be the predicted levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Contract Area Map legend. Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day's activity level by 6:00 PM. Contractor shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day. Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Contractor is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below. K-I.2.1 - CONTRACT TERM ADJUSTMENT (07/2016) "Contract Term Adjustment" (CTA) means adjustment only as provided for in the three circumstances described in this subsection. Under these circumstances, the contract term shall be adjusted in writing to include additional calendar days in one or more normal operating seasons equal to the actual time lost, except as limited by paragraph (2) in this subsection. To qualify for such adjustment, contractor shall give written notice of the lost time not later than 30 days after the end of the normal operating season in which time was lost and at least 10 days before termination date. Contracting officer shall make prompt written acknowledgment of such notice, indicating concurrence with the number of days in the notice or the number of days the Forest Service considers as qualifying for the adjustment. Lost parts of days shall be disregarded in computing time lost. The three circumstances qualifying for a CTA are:

Related to Mechanical Operations

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Commercial Operations Upon satisfaction of the following conditions, the Facility shall be considered to have achieved Commercial Operations on the Day specified in Seller's written notice described below: (i) the Acceptance Test has been passed, (ii) all generating units have passed Control System Acceptance Tests, (iii) the Transfer Date has occurred, (iv) Seller has (1) provided to Company the Required Models (as defined in Section 6(a) (Seller's Obligation to Provide Models) of Attachment B (Facility Owned by Seller)) in the form of Source Code, (2) placed the current version of the Source Code for the Required Models with the Source Code Escrow Agent as required in Section 6(b)(i)(A) (Establishment of Source Code Escrow) of Attachment B (Facility Owned by Seller), or (3) if Seller is unable to arrange for the placement of the appropriate Source Code into the Source Code Escrow account, placed the required funds with the Monetary Escrow Agent as required in Section 6(b)(ii)(A) (Establishment of Monetary Escrow) of Attachment B (Facility Owned by Seller), and (v) Seller provides Company with written notice that (aa) Seller is ready to declare the Commercial Operations Date and (bb) the Commercial Operations Date will occur within 24 hours (i.e., the next Day).

  • Production Operations means all operations conducted for the purpose of producing Petroleum from the Development Area after the commencement of production from the Development Area including the operation and maintenance of all necessary facilities therefor.

  • Commercial Operation means the condition of operation in which the complete equipment covered under the Contract is officially declared by the Owner to be available for continuous operation at different loads up to and including rated capacity. Such declaration by the Owner, however, shall not relieve or prejudice the Contractor of any of his obligations under the Contract.

  • Normal operation means all periods of operation except start-up and shutdown operations and maintenance of equipment;

  • Branch operations means any business operations of a branch captive insurance company in this State.

  • CHIEF MECHANICAL ENGINEER means the Chief Mechanical Engineer of the Chennai Port Trust.

  • Supplier Operations means all assets, processes and systems (including information systems), data (including Customer data), personnel, and sites, used or processed by Supplier from time to time in the performance of this Agreement.

  • Satellite means any satellite owned by the Issuer or any of its Restricted Subsidiaries and any satellite purchased by the Issuer or any of its Restricted Subsidiaries pursuant to the terms of a Satellite Purchase Agreement, whether such satellite is in the process of manufacture, has been delivered for launch or is in orbit (whether or not in operational service).

  • Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Plant means the machinery and apparatus intended to form or forming part of the Works.

  • Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.

  • Digital audio-visual work means a series of related images which, when shown in succession, imparts an impression of motion, together with accompanying sounds, if any.

  • Maintenance and Operations Revenue or “M&O Revenue” means (i) those revenues which the District receives from the levy of its annual ad valorem maintenance and operations tax pursuant to Section 45.002 of the TEXAS EDUCATION CODE, or other lawful authority, and Article VII § 3 of the TEXAS CONSTITUTION, plus (ii) all State revenues to which the District is or may be entitled under the applicable provisions of the TEXAS EDUCATION CODE or any other statutory provision as well as any amendment or successor statute to these provisions, as applicable, less

  • The Works/Project means the works to be executed or done under this contract.

  • Electrical work Means any labor or material used in installing, altering, maintaining, or extending an electrical wiring system and the appurtenances, apparatus, or equipment used in connection with the use of electrical energy in, on, outside, or attached to a building, residence, structure, property, or premises. The term includes service entrance conductors as defined by the National Electrical Code.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Terminals means the Terminals set forth on Schedule A attached hereto.

  • Initial Operation means the first integral operation of the complete equipment covered under the Contract with the sub-system and supporting equipment in service or available for service.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Installation means that the System or a Subsystem as specified in the Contract is ready for Commissioning as provided in GCC Clause 26 (Installation).

  • Geotechnical engineer means a Professional Engineer whose principal field of specialization is the design and Construction of earthworks in a permafrost environment.