100% Design Documents Sample Clauses

100% Design Documents. Following City staff review, our team will develop final design documents for the shoreline project. Comments by the City on the 90% design documents (and response table developed by the design team during 90% design) will be used to develop the final design documents for the project. Task 4 Deliverables • 90% Design drawings, technical specifications and EOC (PDF) • Comment response table, for City Comments on 90% design documents (PDF) • 100% Design drawings, technical specifications and EOC (PDF)
AutoNDA by SimpleDocs
100% Design Documents. Prepare 100% Drawings for disciplines defined under the design development portion of this scope which clearly define the scope, extent, and character of the work to be performed and furnished by the CPA and/or Selected Contractor. Drawing Scale is assumed to be 1:30 / 1:40 (Larger for overall type sheets), or 1:20 / 1:10 for details as necessary to clearly depict the proposed improvements in 24”x36” sheet size format. Half size prints if requested are also included. This document phase shall be considered as 100% drawing completion. Abbreviated specifications for site work (pavement, sidewalks, utilities, grading, erosion control, etc.) will be placed on the Drawings. Division 0 and Division 1 (i.e.-“front end documents”) documents will be prepared by the Client, if necessary for construction. A Booklet type of technical specifications is not included. Specifications shall be in the drawings. ISSUE FOR CONSTRUCTION (IFC) DOCUMENTS ATKINS will revise the 100% Site Civil Documents in response to CPA comments and reconcile the plans one time for incidental revisions resulting from the CPA review process. Deliverables: ATKINS will furnish four (4) signed and sealed drawings including electronic PDF files of the IFC Documents to the CPA. This submittal may not be made before all CPA requested revisions have been incorporated and has been completed. This document phase shall be considered as ISSUE FOR CONSTRUCTION. Issuance of IFC Documents could potentially fall after Bid Documents depending on Bid advertising. COORDINATION (DESIGN & PERMITTING) ATKINS shall coordinate with the Client to provide civil design information as requested and to communicate to other disciplines of design contracted by the Client about the status of the civil design activities and for coordinating the civil design documents with other design disciplines and Client interrelated permitting activities, including but not limited to: the CPA, waterside design, structural, electrical, telecommunications, lighting, survey and geotechnical consultants.
100% Design Documents. ENGINEER will develop and deliver design drawings and technical specifications per Missouri Code of State Regulations Rules of Department of Natural Resources Division 20 – Clean Water Commission Chapter 8 – Minimum Design Standards (MO CSR 10c20-8), 10 CSR 20-8.120 Gravity Sewers. These final design documents will be 100% level design for OWNER review based on decisions in the kickoff meeting as described in 1.6.1. The ENGINEER will use the OWNER’s Infrastructure Specifications and Standard Details. ENGINEER will develop additional technical specifications to supplement OWNER’s specifications as needed to complete the work. ENGINEER’s deliverables (drawings and technical specifications) will be in electronic format only (PDF), signed by a registered Professional Engineer in the State of Missouri.

Related to 100% Design Documents

  • Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager:

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Contractor’s Completion Documents Receive from Contractor, review, and transmit to Owner maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance required by the Construction Contract Documents, certificates of inspection, tests and approvals, and Shop Drawings, Samples, and other data. Receive from Contractor, review, and transmit to Owner the annotated record documents which are to be assembled by Contractor in accordance with the Construction Contract Documents to obtain final payment. The extent of Engineer’s review of record documents shall be to check that Contractor has submitted all pages.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.