Final Plan Preparation Sample Clauses

Final Plan Preparation. Prepare contract documents consisting of Plans, Special Provisions, Contract Proposals, and Engineer’s Estimate of Probable Construction Cost, Estimate of Time, and submit these documents to IDOT for the County to receive construction bids. Make any necessary changes to the documents as required by IDOT in order to secure approval. Submit the following deliverables to the County upon completion of the PROJECT: o Full Size Plans 22” x 34” (one copy) o Quarter Size Plans 11” x 17” (two copies) o Electronic Copy of Plans (both DGN and PDF format) o Special Provisions (both hard copy and digital format) o Disposition of Comments (hard copy and digital format) o Cost Estimate and Estimate of Time (hard copy and digital format) o Quantity Calculation Files (both hard copy and digital format) o CD of Electronic Data
AutoNDA by SimpleDocs
Final Plan Preparation a. Prepare Engineer’s Estimate of Probable Cost – The ENGINEER will update the Engineer’s estimate of probable cost based on the final design plans.
Final Plan Preparation. AECOM will incorporate comments from Preliminary Plans and submit final plans for comment. This will include the following:  Updated cover sheet, legend, general notes, quantities, typical sections, and survey references  Plan and Street Profile and Sewer Profile sheets  Driveway replacements, including spot elevations  Final structural and detail drawings  Final traffic control planErosion control plans that meet City, KDOT, and NPDES requirements  Standard and special detail sheets  Drainage map and calculations  Update Site 5A RCB culvert layout and structural detail sheets, including general notes and estimated quantities. The 100% plans will be finalized after final review of the City.
Final Plan Preparation. Prepare final plans based on preliminary plans, Owner feedback, and additional design development. ▪ Plan set revisions per comments from preliminary set comments from OWNER. ▪ ENGINEER shall develop Erosion control plan and Pollution Prevention Plan. ▪ It is assumed that no NPDES permit will be required for this project. ▪ ENGINEER shall develop phasing and traffic control plans; as necessary. ▪ Prepare Plans and Specifications, including OWNER provided standard front ends. ▪ Provide ADA design and curb ramp details required. ▪ Provide opinion of probable cost for final plan phase. ATTACHMENT 1: SCOPE OF SERVICES UPTOWN PARKING IMPROVEMENTS Amendment #1 ▪ Perform QA/QC review of final plan set. ▪ ENGINEER shall provide a Final design phase (100% complete) plan set to the OWNER for review and comment. ▪ Provide OWNER with final PDF of final plans and specifications. ▪ Provide OWNER with (4) paper copies of final plans and specifications (half-size). ▪ Provide OWNER with all applicable submittals listed in the City of Ankeny’s Pre-Construction and Post-Construction Submittals document under Projects for Public Government (CIP) Projects. • Specifications o Specifications: prepare technical specifications, special procedures, bidding documents and construction contracting documents.

Related to Final Plan Preparation

  • Costs of negotiation, preparation etc The Borrowers shall pay to the Agent on its demand the amount of all expenses incurred by the Agent or the Security Trustee in connection with the negotiation, preparation, execution or registration of any Finance Document or any related document or with any transaction contemplated by a Finance Document or a related document.

  • Joint Preparation The preparation of this Agreement has been a joint effort of the parties and the resulting documents shall not, solely as a matter of judicial construction, be construed more severely against one of the parties than the other.

  • Site Preparation Axon will provide a hardcopy or digital copy of current user documentation for the Axon Devices ("User Documentation"). User Documentation will include all required environmental specifications for the professional services and Axon Devices to operate per the Axon Device User Documentation. Before installation of Axon Devices (whether performed by Customer or Axon), Customer must prepare the location(s) where Axon Devices are to be installed ("Installation Site") per the environmental specifications in the Axon Device User Documentation. Following installation, Customer must maintain the Installation Site per the environmental specifications. If Axon modifies Axon Device User Documentation for any Axon Devices under this Agreement, Axon will provide the update to Customer when Axon generally releases it

  • Surface Preparation Clean the surface to be treated of all dust, dirt, clay, grass, sod and any other deleterious matter before application of the asphalt surface treatment.

  • Proposal Preparation The contractor shall assume all costs associated with preparation of proposals for task order awards under the proposal process as an indirect charge (B&P costs). The Government will not reimburse awardees for proposals as a direct charge.

  • Preparation Awarded vendor shall not begin a project for which TIPS Member has not prepared the site, unless awarded vendor does the preparation work at no cost, or until TIPS Member includes the cost of site preparation in a purchase order. Site preparation includes, but is not limited to: moving furniture, installing wiring for networks or power, and similar pre-installation requirements. Registered sex offender restrictions: For work to be performed at schools, awarded vendor agrees that no employee of a sub-contractor who has been adjudicated to be a registered sex offender will perform work at any time when students are, or reasonably expected to be, present. Awarded vendor agrees that a violation of this condition shall be considered a material breach and may result in the cancellation of the purchase order at the TIPS Member’s discretion. Awarded vendor must identify any additional costs associated with compliance of this term. If no costs are specified, compliance with this term will be provided at no additional charge. Safety measures: Awarded vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Awarded vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.

  • Preparation Periods 31-1 The School District agrees to maintain daily preparation periods during the student day in all junior and senior high schools. At schools where block scheduling is in effect, the total preparation time provided shall be equal to the preparation time provided at schools not operating on a block schedule. 31-2 The School District shall maintain at each elementary school a minimum of two hundred and fifty (250) minutes preparation time per week per teacher, during the students’ instructional day, in not less than forty- (40) minute blocks. Each elementary school shall be allocated and assigned library aide hours per school day in accordance with the following schedule: This aide time is provided in addition to the assigned media clerk time. Library aide time is guaranteed for the school year once set on a school year basis. There will be no changes in library aide time allocated due to fluctuation in enrollment. This provision for allocating library aide time will only remain as part of this Agreement if librarians are used to provide preparation time to elementary teachers. 31-3 Preparation time provided for in this Article shall be utilized by teachers in a manner which enables further development and refinement of professional skills and for instructional effectiveness. 31-4 Although it does not relate to any mandatory subject of bargaining, the School District states that it is its aim and objective to establish a maximum class load of thirty (30) students in grades 4, 5, and 6. 00-0 Xxx Xxxxxxxx may direct use of teacher preparation periods if such directed use is infrequent, advance notice is given and the District’s use of the teacher’s preparation period must not consume an entire period.

  • Preparation Period During the preparation period, a teacher will have no other assignment except in an emergency situation. It is recognized that the preparation period is a scheduled part of the teacher's work day and the teacher is expected to be in his/her respective Building. If the teacher must leave the Building during his/her preparation and/or lunch period, he/she must notify the Building switchboard operator.

  • Final Plans When authorized by the CITY prepare final plans for the PROJECT based upon com- ments as agreed upon as a result of the office check review. Major items of work included in devel- opment of final plans are: (a) Prepare engineering plans (which shall include construction sequencing and traffic con- trol), supplemental specifications, special provisions and construction cost estimates, or esti- mates of the quantities of work for the PROJECT.

  • DOCUMENT PREPARATION The Transfer/Deed shall, save for the Land Transfer Tax Affidavit, be prepared in registrable form at the expense of Seller, and any Charge/Mortgage to be given back by the Buyer to Seller at the expense of the Buyer. If requested by Buyer, Seller covenants that the Transfer/Deed to be delivered on completion shall contain the statements contemplated by Section 50(22) of the Planning Act, R.S.O.1990.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!