STATEMENT OF SCOPE OF WORK Sample Clauses

STATEMENT OF SCOPE OF WORK. This work will be performed in accordance with the American Society of Civil Engineers Construction Institute Standard 38‐02 (ASCE/CI 38‐02) and include the following activities:  Compilation of utility data (i.e. records and as‐built information) acquired by UMS and others.  Preparation of field books, log sheets, and crew scheduling and logistics for the initial utility designating field campaign.  Phase 1: 2D QL B data acquisition (using electromagnetic (EM) induction, acoustic, and/or other geophysical technologies), characterization, and 2D depiction (CADD file) of existing utility infrastructure data to develop a reliably qualified base map and data set from which to develop and support future design, coordination, and construction decisions.  Populating utility data management system GEOfeature™ with hydraulic structure information from the field investigation. *Note: QL refers to the quality level as described in ASCE/CI 38-02 Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data. **Note: GEOfeature™ is a 3-D digital utility data repository designed to manage existing and new infrastructure as-built data in accordance with the new ASCE “As-Built” standard. The repository includes a tablet and Web-GIS application for in-the-field utility data acquisition and viewing. Phase 1 Designating Although Phase 1 utility designating of buried infrastructure will have goal of QL B (i.e., position is determined via a combination of geophysical, survey and engineering methods) some facilities such as non‐conductive water are pragmatically designated to a mixture of QL C (i.e., based on surveyed UMS, Inc. Page 3 8/18/2020 Utility Engineering Scope of Work Timberline Road and Lincoln Avenue QL B Utility Designating Investigation Fort Xxxxxxx, Colorado surface features and record data), B, and A (i.e., exposed survey grade observations such as possible at manholes) during the Phase 1 field effort. Likewise, some non‐conductive piping and/or ducts lacking tracer wire may be designated to QL D (i.e., based on evidence consisting of available record information and/or verbal accounts) during the Phase 1 effort. Data quality is improved as and where required during subsequent project utility engineering phases. Any utilities designated to QL C and/or QL D quality levels will be explained and described in the Phase 1 SUE existing utility report as to why a quality level below QL B has been used. All work is intended to incorporate a...
AutoNDA by SimpleDocs
STATEMENT OF SCOPE OF WORK. Consultant will review and provide in a final written report analysis, observations, recommendations, and other information on potential changes to the State of Alaska’s retirement system, as directed by the Project Director. Tasks to be completed by the Consultant may include, but are not limited to: Update of actuarial cost estimates for a return to DB based on the most recent updated information from the system actuary as a framework for calculations. Consultant shall review the most recent annual actuarial reports of PERS and TRS and use their results to update the cost calculations for PERS and TRS developed in previous years. This will provide the Committee with a baseline of costs to be used to compare with alternative DB option plans. Projection of future costs. Consultant shall develop financial projections of how the plan liabilities and assets of PERS and TRS accounts would increase in future years as the DB option plan matures over 30 years. This projection will incorporate dynamic features, which may include: • Potential Suspension of the Post Retirement Pension Adjustment if funding ratio falls below 90%; • Increase in employee contributions if funding ratio falls below 90%; • Removal of employee contribution increase as funding ratio returns to a healthy position (specifics to be determined); and • Application of employer contributions in excess of current levels to this plan instead of towards the unfunded liability of PERS Tiers I-III and TRS Tiers I-II. Consultant shall assume that the DB option plan begins on July 1, 2021, and will not model transferring those from PERS Tier IV or TRS Tier III, although it is anticipated that plan participants will be able to purchase benefits based on their balances at an actuarially neutral cost. Enhance projections to incorporate unanticipated investment return. Consultant shall model various investment return alternatives. Consultant whether the base line assumed return will be 7.00% as assumed for House Bill 79 during the 31st Alaska State Legislature or a higher rate currently assumed by the actuaries for PERS and TRS. Consultant’s projection approach shall include: • Returns that are a stable 1% higher or lower than the assumed rate; • Returns that are similar to those historically earned by PERS; and • Returns based on stochastic Monte Carlo simulations. Prior to commencing work as directed by the Project Director, the Consultant shall provide an estimate of compensation as provided for in Clause...
STATEMENT OF SCOPE OF WORK. 1. Description of the Tasks to be Performed by DEVELOPER:

Related to STATEMENT OF SCOPE OF WORK

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

  • Detailed Scope of Work The complete description of services to be provided by the Contractor under an individual Job Order. Developed by the Contractor, after the Joint Scope Meeting and submitted for approval to the County Project Manager.

  • Scope of Work The Contractor has overall responsibility for and shall provide and furnish all materials, equipment, tools and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner’s requirements and the terms of the Contract Documents.

  • Changes to Scope of Work The City of Nashua may, at any time, by written order, make changes to the general scope, character, or cost of this contract and in the services or work to be performed, either increasing or decreasing the scope, character, or cost of Independent Contractor's performance under the contract. Independent Contractor shall provide to the City of Nashua within 10 calendar days, a written proposal for accomplishing the change. The proposal for a change shall provide enough detail, including personnel hours for each sub-task and cost breakdowns of tasks, for the City of Nashua to be able to adequately analyze the proposal. The City of Nashua will then determine in writing if Independent Contractor should proceed with any or all of the proposed change. If the change causes an increase or a decrease in Independent Contractor's cost or time required for performance of the contract as a whole, an equitable adjustment shall be made and the contract accordingly modified in writing. Any claim of Independent Contractor for adjustment under this clause shall be asserted in writing within 30 days of the date the City of Nashua notified Independent Contractor of the change. When Independent Contractor seeks changes, Independent Contractor shall, before any work commences, estimate their effect on the cost of the contract and on its schedule and notify the City of Nashua in writing of the estimate. The proposal for a change shall provide enough detail, including personnel hours for each sub-task and cost breakdowns of tasks, for the City of Nashua to be able to adequately analyze the proposal. The City of Nashua will then determine in writing if Independent Contractor should proceed with any or all of the proposed change. Except as provided in this paragraph, Independent Contractor shall implement no change unless the City of Nashua in writing approves the change. Unless otherwise agreed to in writing, the provisions of this contract shall apply to all changes. The City of Nashua may provide verbal approval of a change when the City of Nashua, in its sole discretion, determines that time is critical or public health and safety are of concern. Any verbal approval shall be confirmed in writing as soon as practicable. Any change undertaken without prior City of Nashua approval shall not be compensated and is, at the City of Nashua's election, sufficient reason for contract termination.

  • 000 SCOPE OF WORK 5.100 The scope of this Agreement covers all work of a maintenance, repair and renovation nature, assigned by the Owner to the Company and performed by the employees of the Company covered by this Agreement, within the limits of the Owner's plant site.

  • Attachment A, Scope of Services The scope of services is amended as follows:

  • General Scope of Work The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit “A” attached hereto and by this reference made a part of this AGREEMENT. The General Scope of Work was developed utilizing performance based contracting methodologies.

  • Authorized User’s Statement of Work A competitive Mini-Bid is required for every transaction under this Centralized Contract. An Authorized User must prepare a detailed Statement of Work using Appendix F, Attachment 1, Mini-Bid Template. The Authorized User must distribute the Mini-Bid to all qualified Vendors per Lot(s) (unless a Vendor has removed itself from consideration via the Appendix F, Attachment 5, Mini-Bid Participation Interest Template). Contact information, organized by Lot, will be available on the OGS website for this Contract. An Authorized User shall conduct its Mini-Bid in accordance with the requirements set forth in Appendix F, Attachment 2, How to Use this Contract. The following terms and conditions shall apply to each Mini-Bid issued by an Authorized User:  An Authorized User may require the execution of unique forms, such as Confidentiality Non- Disclosure agreements; and  An Authorized User is required to make tentative award and non-award notifications to each Contractor who submitted a response to the Mini-Bid. Additionally, the minimum time, excluding the date of release, between issuance of the Mini-Bid by the Authorized User to the Mini-Bid Opening is as follows:  Xxx 0 Xxxx-Xxxx: Xxxx (0) Xxxxxxxx Xxxx  Xxx 0 Mini-Bids: Ten (10) Business Days

  • Detailed Description of Services / Statement of Work Describe fully the services that Contractor will provide, or add and attach Exhibit B to this Agreement.

  • Scope of Works CHAPTER III