Field Change Order definition

Field Change Order is a written change order requested by the AE, accepted by the CM, and approved by the Project Coordinator for minor changes in the Work, not involving the adjustments in the Guaranteed Maximum Price or an extension of Time, and not inconsistent with the overall intent of the Contract Documents.
Field Change Order means a written instrument issued by Company to Contractor after the execution of this Contract ordering (1) a change in the Work, (2) an adjustment in the Contract Sum, or (3) an adjustment in the Contract Time.
Field Change Order is a document which outlines the scope of a requested change in the Work as defined by the Shell and Core Plans and Tenant Plans and bears the signature of Tenant and Landlord representatives approving such change in scope. All such plans, specifications, and Field Change Orders shall be approved by Landlord and Tenant prior to being executed or acted upon by the Landlord's or Tenant's Contractors. Landlord and Tenant shall be given 24 hours to respond without causing a Landlord or Tenant Delay unless otherwise specified in said Field Change Order. In the event the Field Change Order increases the cost of the Shell and Core or Tenant Work beyond the maximum Tenant Work Allowance, Tenant shall pay for the work per the terms of this Exhibit and the Lease. As for Tenant Work, Tenant shall pay its Contractor per the terms of the construction contract between the Tenant and its Contractor. EXHIBIT D TO OFFICE LEASE AGREEMENT ▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ WEST BUILDING OFFICE TENANT BUILDING SHELL AND CORE OUTLINE SPECIFICATIONS The Building Outline Specifications which follow are intended to establish the scope and quality of finishes, materials and systems to be furnished by Landlord for the construction of the basic Building Shell and Core, as well as the parking structure and landscaped surface parking areas (together referred therein as the "Shell and Core"). The Building Outline Specifications are intended to govern the development of the building drawings through the completion of the final building working drawings and specifications ("The Contract Documents"). Capitalized terms used and not defined shall have the meanings given them in the Lease. Landlord is committed to developing a long-term investment quality product, which has lasting quality and landmark stature and will be considered in all respects a first class office building development. This Outline Specification may be amended, through mutual consent of the parties, during the completion of the design development and construction document phases of the design of the buildings. The cost of all maintenance following initial installation shall be as provided under the Lease. FOUNDATION SYSTEM 1. The foundation system shall be designed based upon good engineering practice, soils bearing analysis from a geotechnical engineer and structural load calculations. For Typical floor load capacities for all office floors, see Superstructure System below, including all exceptions.

Examples of Field Change Order in a sentence

  • If the amount of the adjustment of the Contract price and time for completion can be determined at the time of issuance of the Emergency Field Change Order, those adjustments shall be reflected on the face of the Emergency Field Change Order.

  • Otherwise, the Emergency Field Change Order shall reflect a not-to-exceed (NTE) amount for any schedule adjustment (increasing or decreasing the time for completion) and an NTE amount for any adjustment to Contract sum, which NTE amount shall represent the maximum amount of adjustment to which the Contractor shall be entitled, including direct and indirect costs of changed work, as well as any direct or indirect costs attributable to delays, inefficiencies or other impacts arising out of the change.

  • The term “Emergency Field Change Order” shall mean a written change order for extra Work or a change in the Work necessitated by an emergency as defined in Article 35D executed on State form SC 6.31 and identified as an Emergency Field Change Order.

  • These changes may be made with a Change Order, Field Change Order (FCO), or Contractor Work Assignment (CWA), as directed by the Edison Representative or the Procurement Agent.

  • Buyer shall, at Buyer's expense, perform all labor to implement the Mandatory Field Change Order, except in cases where a Mandatory Field Change Order is required to make the Product(s) safe in compliance with regulatory agency standards.

  • In the event the Field Change Order increases the cost of the Shell and Core or Tenant Work beyond the maximum Tenant Work Allowance, Tenant shall pay for the work per the terms of this Exhibit and the Lease.

  • In the event the Field Change Order increases the construction cost Tenant shall pay to Landlord 100% of the anticipated increase at the time the Field Change Order is signed by Tenant.

  • In the event mandatory engineering and safety changes to the Product(s) are required, Kentek shall issue to Buyer a Mandatory Field Change Order including all necessary documentation and implementation instructions.

  • Kentek shall reimburse Buyer for Buyer's travel and labor cost for implementing such Mandatory Field Change Order in that instance only.

  • Landlord and Tenant shall be given 24 hours to respond without causing a Landlord or Tenant Delay unless otherwise specified in said Field Change Order.


More Definitions of Field Change Order

Field Change Order. ("FCO"), Problem Reporting ("PO") and Service Information ("SI") Program OEM shall maintain a field change order, problem reporting and service information program in accordance with good industry practice. The following procedures are intended as minimum requirements for the program which OEM has in place and for interfacing this program with PMSN's procedures. Changes which affect Form, Fit, Function, or Certification of the Product, or Spare Parts stock may only be implemented after consultation between OEM and PMSN and mutual agreement. 5.1 Form of FCO Field modifications, if any, will be made available to PMSN in the form of modification kits. These kits will contain: - Implementation instructions, including a list of applicable Products and serial numbers - Material and Spare Parts - Special tools (if any) - Service Documentation updates -------- -------- Initials Initials Merge PMSN 5.2 Categories and Implementation of FCO's Three (3) categories will be distinguished:
Field Change Order. (FCO) means technical changes to the hardware, excluding the firmware, aimed at maintaining or enhancing the correct operation of the hardware.
Field Change Order is a document which outlines the scope of a requested change in the Work as defined by the Shell and Core Plans and Tenant Plans and bears the signature of Tenant and Landlord representatives approving such change in scope. All such plans, specifications, and Field Change Orders shall be approved by Landlord and Tenant prior to being executed or acted upon by the Landlord's or Tenant's Contractors. Landlord and Tenant shall be given 24 hours to respond without causing a Landlord or Tenant Delay unless otherwise specified in said Field Change Order. In the event the Field Change Order increases the cost of the Shell and Core or Tenant Work beyond the maximum Tenant Work Allowance, Tenant shall pay for the work per the terms of this Exhibit and the Lease. As for Tenant Work, Tenant shall pay its Contractor per the terms of the construction contract between the Tenant and its Contractor. EXHIBIT G OPTION SPACE PERFORMANCE CRITERION Per Section 33 of the Lease, Tenant has the Option to Expand its Premises into the Building Three Option Space as defined in said Section 33. This Exhibit establishes criterion under which Tenant's Building Three Option Space shall be reduced from a maximum of two full floors to one full floor. Tenant's Building Three Option Space shall be reduced to one (1) full floor (either the first or second floor of Building Three at Landlord's sole discretion) if either one of the following two conditions exist: