Annual Work Programs and Budgets Sample Clauses

Annual Work Programs and Budgets. 4.1 Presentation of Annual Work Program No later than ninety (90) days before the beginning of each Calendar Year, or for the first Calendar Year, no later than sixty (60) days after the Effective Date, the Contractor will prepare and present for approval by the Ministry a detailed Annual Work Program divided into Quarters, together with the corresponding Annual Budget for the Contract Area explaining the Petroleum Operations the Contractor proposes to carry out during the Calendar Year. The Annual Budget will be presented in the Ministry's official format. 4.2 Form and Approval of the Annual Work Program Each Annual Work Program and corresponding Annual Budget will be broken down into the various Exploration Operations and, as applicable, according to the evaluation operations for each Evaluation Area, and the Development and Production Operations for each Development and Production Area. If no response is received within ninety (90) days of the reception of the Annual Work Program and corresponding Annual Budget, these will be considered approved. The Ministry may propose amendments or modifications to the Annual Work Program and corresponding Annual Budget, by giving notice to the Contractor and including reasons for the amendments or modifications, within sixty (60) days of receiving the Annual Work Program and Annual Budget. In such event, the Ministry and the Contractor will meet as soon as possible to review the amendments or modifications proposed by the Ministry and establish the Annual Work Program and corresponding Annual Budget by mutual agreement. The parts of the Annual Work Program for which the Ministry does not require amendment or modification will be considered approved and the Contractor must implement them within the stated time period, provided they can be undertaken on an individual basis, or with respect to an approved activity that depends technically or financially on an activity that is not approved. With respect to the parts of the Annual Work Program for which the Ministry proposes any amendment or modification, the date of approval of the Annual Work Program and corresponding Annual Budget will be the date on which the Ministry and the Contractor reach mutual agreement on them. If the Ministry and the Contractor do not reach an agreement about the amendments and modifications proposed by the Ministry before the end of the Calendar Year in which the Annual Work Plan and corresponding Annual Budget are submitted, the Contractor ...
AutoNDA by SimpleDocs
Annual Work Programs and Budgets. (A) Not later than the first Day of September of each preceding Calendar Year with respect to Calendar Year 2010 and thereafter, Unit Operator shall submit to the Parties a proposed Unit Work Program and Budget for Unit Operations for the applicable Calendar Year (the “Annual Unit Work Program and Budget”), which shall with respect to development operations be consistent with the then-existing Unit Development Plan, along with reasonable and necessary supporting information, and a proposed update of the life of Unit Interval production forecast in the Unit Development Plan. Technical Operator shall submit its proposal for the relevant portions of the Annual Unit Work Program and Budget relating to Technical Operations to Unit Operator at least thirty (30) Days prior to the date for Unit Operator’s submission of the Annual Unit Work Program and Budget to the Parties. Each Annual Unit Work Program and Budget submitted by Unit Operator shall contain an itemized estimate of the cost of Unit Operations and all other expenditures to be made for the Unit Account during the Calendar Year in question and shall, inter alia: (i) identify each work category in sufficient detail to afford the ready identification of the nature, scope and duration of the activity in question; (ii) include such reasonable information regarding each Operator’s allocation procedures and estimated manpower costs as the Unit Operating Committee may determine; and
Annual Work Programs and Budgets. Rÿhbÿr komitÿnin tÿşkil edildiyi tarixdÿn çoxu otuz (30) gün xxxxxxxxx xx bundan sonra növbÿti Tÿqvim ilinin başlanmasına heç olmasa üç (3) ay qaldıqda, İşlÿnmÿ vÿ hasilat dövrü ÿrzindÿ Podratçı qarşıdakı Tÿqvim ili üçün planlaşdırdıǧı Mÿdÿn-filiz ÿmÿliyyatlarını nÿzÿrdÿ tutan İllik iş proqramı vÿ ona müvafiq Büdcÿ hazırlayır xx xxxxxxxxx xx xxxxxx edilmÿsi üçün Rÿhbÿr komitÿyÿ verir. İllik iş proqramı vÿ Büdcÿ tÿqdim edildikdÿn sonra otuz (30) gündÿn tez olmayaraq İllik iş proqramına vÿ Büdcÿyÿ, hÿmçinin onlarla baǧlı tÿklif olunan dÿyişikliklÿrÿ baxmaq, habelÿ Xxxxx xx xxxxxxxxxxx xx Xxxxxxxx qÿti variantını tÿsdiq etmÿk mÿqsÿdilÿ Rÿhbÿr komitÿnin iclası çaǧırılır. Podratçı İllik iş proqramını vÿ ona müvafiq Büdcÿni icra üçün qÿbul edir. Podratçının İllik iş proqramından vÿ Büdcÿdÿn hÿr Not more than thirty (30) days following the formation of the Steering Committee and thereafter at least three (3) months before the beginning of each Calendar Year during the Development and Production Period, Contractor shall prepare and submit to the Steering Committee for review and approval an Annual Work Program together with the related Budget in respect of the Mining Operations Contractor proposes to be carried out in such a calendar year. The Steering Committee shall meet within thirty (30) days of receipt of the Annual Work Program and Budget to consider same and any revisions thereto and to approve the Annual Work Program and the Budget in its final form. Thus Contractor shall fulfill the Annual Work Program and related Budget and shall not conduct any operations which deviate from the Annual Work Program hansı dÿrÿcÿdÿ kÿnara çıxan ÿmÿliyyat hÿyata keçirmÿyÿ ixtiyarı yoxdur, xxxxx işin yerinÿ yetirilmÿsi gedişindÿ Podratçının İllik iş proqramına vÿ müvafiq Büdcÿyÿ müvafiq düzÿlişlÿr vÿ ya tÿkmillÿşdirmÿlÿr keçirilmÿsinÿ dair xahişlÿ Rÿhbÿr komitÿyÿ müraciÿt etmÿk üçün Podratçıya kifayÿt qÿdÿr ÿsas verÿn yeni mÿlumat vÿ ya informasiya meydana çıxırsa, Podratçının xxxxxxxx xxx xx, Xxxxxx xxxxxxxx müraciÿt etsin vÿ Rÿhbÿr komitÿ tÿsdiq edÿrsÿ proqrama müvafiq düzÿlişlÿr vÿ ya tÿkmillÿşdirmÿlÿr keçirsin. İllik iş proqramının yerinÿ yetirilmÿsi üçün zÿruri hallarda Podratçıya müvafiq Tÿqvim ili ÿrzindÿ qÿbul edilmiş Büdcÿdÿn ÿlavÿ artıq vÿsait xÿrclÿmÿyÿ icazÿ verilir, xxxxx bu mÿblÿǧin cÿmi Büdcÿnin on (10) faizdÿn xxx olabilmÿz. On (10) faizdÿn artıq vÿsaitin xçrülÿnmÿsi yalnız bu barÿdÿ Rÿhbÿr komitÿnin qÿrarı çıxarıldıǧı hallarda baş verÿ bilÿr. Bu Sazişin qala...
Annual Work Programs and Budgets. 68 ARTICLE 11 ALLOCATION OF PRODUCTION, RECOVERY OF COSTS AND EXPENSES, PRODUCTION SHARING, AND RIGHT OF EXPORT ...................................................... 69 ARTICLE 12
Annual Work Programs and Budgets. The Recipient shall prepare and furnish to the Association for its joint approval with the other Pooled Funding Partners, not later than October 1 of each year during the implementation of the Project, or such later date as the Association may agree in consultation with the other Pooled Funding Partners, the respective Annual Work Program and Budget containing each proposed Subprogram to be carried out in the following Fiscal Year by the respective Implementing Agencies, with confirmation of availability of the Recipient’s contribution for expenditures under the Project for that Fiscal Year.
Annual Work Programs and Budgets. (a) Not more than thirty (30) days following the formation of the Steering Committee and thereafter at least three (3) months before the beginning of each Calendar Year during the Development and Production Period, Contractor shall prepare and submit, or cause to be prepared and submitted, to the Steering Committee for approval an Annual Work Program and Budget in respect of the Petroleum Operations Contractor proposes to be carried out in such Calendar Year. The Steering Committee shall meet within thirty (30) days of receipt of the Annual Work Program and Budget to consider same and any revisions thereto and to approve the Annual Work Program and the Budget in its final form. It is agreed by SOCAR and Contractor that knowledge acquired as the work proceeds or from certain events may justify changes to the details of the Annual Work Program and Budget; thus Contractor may at any time propose to the Steering Committee an amendment to the Annual Work Program and Budget. Except as provided in this Article 5.3 and in Article 5.4, Contractor shall not conduct any operations which deviate materially from the applicable Annual Work Program and Budget without the prior consent of the Steering Committee. If necessary to carry out an Annual Work Program and Budget, Contractor is authorized to make expenditures during the relevant Calendar Year that are not in excess of ten (10) percent of the Budget approved, unless such expenditures exceeding ten (10) percent are approved by the
Annual Work Programs and Budgets. Section 5.1 Insert at the beginning of Section 5.1: For all activities under the CXY Service Subcontract, proposals for Joint Programs and Joint Budgets, which are referred to as Development Plans, Work Programs and Budgets therein, shall be prepared by CXY in consultation with Atlas and approvals thereof shall be in accordance with the terms of the CXY Service Subcontract. Section 5.4 Insert at the beginning of Section 5.4: OPL 75 1st Amendment to JOA 20F For all activities under CXY Service Subcontract, AFE's shall be governed by the procedures set out in the CXY Service Subcontract.
AutoNDA by SimpleDocs
Annual Work Programs and Budgets. The Borrower shall:
Annual Work Programs and Budgets 

Related to Annual Work Programs and Budgets

  • Annual Work Plans and Budgets The Recipient shall furnish to the Association as soon as available, but in any case not later than September 1 of each year, the annual work plan and budget for the Project for each subsequent year of Project implementation, of such scope and detail as the Association shall have reasonably requested, except for the annual work plan and budget for the Project for the first year of Project implementation, which shall be furnished no later than one (1) month after the Effective Date.

  • Business Plan and Budget As soon as available, but in any event within sixty (60) days after the end of each fiscal year of the Borrower, an annual business plan and budget of the Borrower and its Subsidiaries on a Consolidated basis, including forecasts prepared by management of the Borrower, in form reasonably satisfactory to the Lender, of Consolidated balance sheets and statements of income or operations and cash flows of the Borrower and its Subsidiaries on a fiscal year basis and, in the case of such forecasted statements of income, on a fiscal quarterly basis for the immediately following fiscal year. As to any information contained in materials furnished pursuant to Section 6.02(f), the Borrower shall not be separately required to furnish such information under Section 6.01(a) or (b) above, but the foregoing shall not be in derogation of the obligation of the Borrower to furnish the information and materials described in Sections 6.01(a) and (b) above at the times specified therein.

  • Work Progress The Developer and Connecting Transmission Owner will keep each other, and NYISO, advised periodically as to the progress of their respective design, procurement and construction efforts. Any Party may, at any time, request a progress report from the Developer or Connecting Transmission Owner. If, at any time, the Developer determines that the completion of the Connecting Transmission Owner’s Attachment Facilities will not be required until after the specified In-Service Date, the Developer will provide written notice to the Connecting Transmission Owner and NYISO of such later date upon which the completion of the Connecting Transmission Owner’s Attachment Facilities will be required.

  • Work Plans Tenant shall prepare and submit to Landlord for approval schematics covering the Tenant Improvements prepared in conformity with the applicable provisions of this Work Letter (the “Draft Schematic Plans”). The Draft Schematic Plans shall contain sufficient information and detail to accurately describe the proposed design to Landlord and such other information as Landlord may reasonably request. Landlord shall notify Tenant in writing within ten (10) business days after receipt of the Draft Schematic Plans whether Landlord approves or objects to the Draft Schematic Plans and of the manner, if any, in which the Draft Schematic Plans are unacceptable. Landlord’s failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If Landlord reasonably objects to the Draft Schematic Plans, then Tenant shall revise the Draft Schematic Plans and cause Landlord’s objections to be remedied in the revised Draft Schematic Plans. Tenant shall then resubmit the revised Draft Schematic Plans to Landlord for approval, such approval not to be unreasonably withheld, conditioned or delayed. Landlord’s approval of or objection to revised Draft Schematic Plans and Tenant’s correction of the same shall be in accordance with this Section until Landlord has approved the Draft Schematic Plans in writing or been deemed to have approved them. The iteration of the Draft Schematic Plans that is approved or deemed approved by Landlord without objection shall be referred to herein as the “Approved Schematic Plans.”

  • Project Work Plan The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from PEI and the Grantee.

  • Development Plans Shipper has provided Gatherer with a report attached hereto as Exhibit D (the “Current Development Plan”) describing in detail, as of January 1, 2017, the planned development, drilling, and production activities to take place with respect to Dedicated Production for the applicable Development Period. The information contained in the TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). Current Development Plan is broken out on a Subsystem-by-Subsystem basis and, with respect to the first three Years covered by the Current Development Plan, on a Quarter-by-Quarter basis, and with respect to the remaining Years covered by the Current Development Plan, on a Year-by-Year basis. The Current Development Plan attached hereto has been approved by the Parties. (a) From time to time during each Year of the Term, the Parties shall meet to discuss the planned development, drilling, and production activities that Shipper expects to take place with respect to Dedicated Production for the then-applicable Development Period. Shipper and Gatherer shall each make their respective representatives available to participate in such meetings and discussions. No later than August 1 of each such Year, Shipper shall provide (or cause to be provided) to Gatherer a proposed update of the then-currently agreed Development Plan, prepared on the same basis as the Current Development Plan and describing in detail the planned development, drilling, and production activities to take place with respect to Dedicated Production for the then-applicable Development Period (any such update, an “Updated Development Plan” and, together with the Current Development Plan, each, a “Development Plan”). Notwithstanding anything herein to the contrary, in no event shall Gatherer be required to agree to any Updated Development Plan and corresponding updated Gathering System Plan that contains a Committed Build-Out that (i) has a corresponding Target Completion Date that occurs after the end of the Initial Term, and (ii) Gatherer, in its sole discretion, does not wish to approve. (b) Each proposed Development Plan shall include information as to the following, in each case, broken out on a Subsystem-by-Subsystem basis and, with respect to the first three Years covered by such Development Plan, on a Quarter-by-Quarter basis, and, with respect to the remaining Years covered by such Development Plan, on a Year-by-Year basis: (i) all Xxxxx that, as of the date such Development Plan was delivered, are currently in existence and (A) the production therefrom is being delivered into the Gathering System, or (B) are awaiting connection to the Gathering System; (ii) the Xxxxx that are expected to be drilled during the time period covered by such Development Plan (each such Well reflected in such Development Plan, a “Planned Well”), and the estimated timing of the drilling of such Planned Xxxxx; (iii) forward-looking production estimates for the applicable time period covered by such Development Plan for all Shipper Gas (A) that Shipper reasonably and in good faith believes will become owned or Controlled by Shipper during the time period covered by such Development Plan, and/or (B) that will be produced from (I) in the aggregate, all Xxxxx then-existing and (II) in the aggregate, any Planned Xxxxx included in such Development Plan (such collective estimates described in subsections (A) and (B), both with respect to a particular Quarter and an entire Year, the “Dedicated Production Estimates”); TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). (iv) forward-looking estimates for the applicable time period covered by such Development Plan of the aggregate volumes of those Shipper Injected Liquids that Shipper intends to Tender to the Injection Points hereunder to receive the System Services (such estimates, both with respect to a particular Quarter and an entire Year, the “System Liquids Estimates” and, together with the Dedicated Production Estimates, the “System Production Estimates”); (v) (A) each new receipt point (including the location thereof) proposed by Shipper with respect to the System Production Estimate reflected in such Development Plan (each such receipt point, including those located at the site of a Planned Well, a “Planned Receipt Point”), (B) each Receipt Point at which Shipper expects to Tender Shipper Gas and/or Shipper Injected Liquids reflected in such Development Plan into the Gathering System, and (C) the estimated portion of the System Production Estimate contained in such Development Plan that Shipper expects to Tender at each such Receipt Point and Planned Receipt Point; (vi) the earliest date on which each Planned Well included in the Development Plan is estimated to be completed and producing, which date shall not be earlier than three Months after the January 1st that is immediately subsequent to the date that the Development Plan that initially reflected such Planned Well was delivered to Gatherer hereunder; (vii) the anticipated characteristics of the production from the Xxxxx and Planned Xxxxx reflected in such Development Plan (including liquids content and gas and liquids composition) and the projected production volumes and production pressures applicable thereto; provided that Shipper may utilize the existing and historical production information from similarly situated Xxxxx; (viii) (A) each new delivery point (including the location thereof) proposed by Shipper with respect to the System Production Estimate reflected in such Development Plan (each such delivery point, a “Planned Delivery Point”), (B) each Delivery Point at which Shipper expects Shipper Gas produced from the Xxxxx and Planned Xxxxx reflected in such Development Plan to be redelivered to Shipper, (C) each Delivery Point at which Shipper expects any Drip Liquids allocated to Shipper in accordance with this Agreement and/or Shipper Injected Liquids to be redelivered to Shipper, and (D) the estimated portion of the System Production Estimate contained in such Development Plan that Shipper expects to be redelivered to Shipper at each such Delivery Point and Planned Delivery Point; (ix) any (A) proposed revision to the then-existing Dedicated Area and/or any then-existing Dedicated Contract and/or (B) any new contract that Shipper proposes to be a Dedicated Contract; and (x) other information reasonably requested by Gatherer that is relevant to the design, construction, and operation of the Gathering System, including (A) any Subsystem Extension proposed by Shipper, (B) the relevant Receipt Point, Planned Receipt Point, Delivery Point and Planned Delivery Point facilities applicable to such TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). Development Plan, and (C) any treating, processing, or liquids handling facilities proposed by Shipper that may be required for any Shipper Gas and/or Shipper Injected Liquids to meet applicable Downstream Facility specifications at the Delivery Points.

  • Development Budget Attached hereto as Exhibit "B" and incorporated herein by this reference is the Development Budget in an amount equal to $_____________. Owner acknowledges and represents that the attached Development Budget includes the total costs and expenses to acquire, develop, renovate and construct the Real Property and the Apartment Housing.

  • Annual Budgets The School shall adopt a budget for each fiscal year, prior to the beginning of the fiscal year. The budget shall be in the Idaho Financial Accounting Reporting Management Systems (IFARMS) format and any other format as may be reasonably requested by the Authorizer.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Concession Area, including its abandonment.

  • Work Plan Coordinate a work plan including a list of the proposed meetings and coordination activities, and related tasks to be performed, a schedule and an estimate. The work plan must satisfy the requirements of the project and must be approved by the State prior to commencing work.