CONSTRUCTION ENGINEERING AND INSPECTION SERVICES Sample Clauses

CONSTRUCTION ENGINEERING AND INSPECTION SERVICES. The Consultant shall be fully responsible for carrying out all functions necessary to provide CEI Services on Projects. The Consultant will be the City’s representative during the construction phase of Projects and all communications to the Contractor will be given through the Consultant. The Consultant shall immediately advise the Project Manager of any omissions, substitutions, defects, and deficiencies noted in the work of the Contractor and the corrective action taken.
AutoNDA by SimpleDocs
CONSTRUCTION ENGINEERING AND INSPECTION SERVICES. 1.0 PURPOSE: This statement of work describes and defines services which are required for construction engineering, inspection, materials sampling and testing and contract administration for construction projects selected by the CITY OF MADISON.
CONSTRUCTION ENGINEERING AND INSPECTION SERVICES. 1.0 PURPOSE: This statement of work describes and defines services which are required for construction engineering, inspection, materials sampling and testing and contract administration for construction projects selected by the STATE/CITY/COUNTY. SCOPE: The CONSULTANT shall be responsible for all construction engineering and administrative functions as defined in this Scope of Work and referenced manuals and procedures. The CONSULTANT shall utilize effective control procedures to assure the construction of said project is performed in reasonable conformity with plans, specifications and contract provisions for assigned project. The CONSULTANT shall provide professional, technical and administrative personnel, meeting requirements of the STATE in appropriate numbers at proper times to ensure that responsibilities assigned under this AGREEMENT are effectively fulfilled. All services shall be performed in accordance with established standard procedures and practices of the STATE. Prior to furnishing any services, the CONSULTANT shall be familiar with ALDOT procedures, standard and informal, and practices, standard and informal, for construction, engineering and contract administration used by the STATE. The STATE/CITY/COUNTY shall endeavor to provide the CONSULTANT at least ten (10) calendar days advance notice of the execution date for each construction contract to allow sufficient time for the CONSULTANT to schedule its activities. In the event of emergency needs, for a short term basis (sickness, vacation, etc.), the STATE/CITY/COUNTY shall provide the CONSULTANT two days advance notice in order for the CONSULTANT to furnish required personnel. The CONSULTANT shall maintain close coordination with the STATE/CITY/COUNTY and Contractor to minimize rescheduling of the CONSULTANT’S activities due to construction delays or changes in scheduling of Contractor's activities.

Related to CONSTRUCTION ENGINEERING AND INSPECTION SERVICES

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Access, Use, Monitoring and Inspection Site shall provide original or copies (as the case may be) of all Study Data to Quintiles and Sponsor for Sponsor’s use. Site shall afford Sponsor and Quintiles and their representatives and designees reasonable access to Site’s facilities and to Medical Records and Study Data so as to permit Sponsor and Quintiles and their representatives and designees to monitor the Study. 1.3.3.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

Time is Money Join Law Insider Premium to draft better contracts faster.