General Project Requirements Sample Clauses

General Project Requirements. The Load Customer will:
AutoNDA by SimpleDocs
General Project Requirements. The Generator will:
General Project Requirements. Work Included: The Work under the Base Bid of the Contract shall include all work indicated or specified within the contract limit lines unless the Work is specifically indicated as "Not in Contract."
General Project Requirements. 2.1.1 The XXXX, to further the interests of the Owner, will perform the services required by, and in strict accordance with this Contract, to the satisfaction of the Owner, exercising the degree of care, skill and judgment ordinarily used by members of the architectural and engineering professions, as well as members of the construction contractor professions, with expertise in the design and construction of public facilities, practicing under similar conditions in Orange County, California would exercise at the same time as the services performed hereunder. The XXXX will provide these services as applicable from the Design Phase through the end of the project design and construction.
General Project Requirements. Below are general PROJECT comments and clarifications in which both NMAAI and the CITY agree will be adhered to for the duration of the PROJECT. Changes to any of these comments and clarifications will be agreed in accordance with the Change Order process defined in the SOW.
General Project Requirements a. Sensus meters and Smartpoints shall be provided to meet all national standards and be identified by unique serial numbers.
General Project Requirements. The Contractor shall provide comprehensive eligibility services and support for Indiana’s Eligibility Operation, specifically in the DFR Central and Regional Change Centers (CCCs and RCCs. The Eligibility Operation is the central resource in helping Hoosiers apply for and receive benefits, including SNAP, TANF, and Health Coverage and relies on three central parts to continue serving the State - CCC and RCC Eligibility Operations (scope of this Contract), Local Office Staff Augmentation (provided under separate contract), and Training (provided under separate contract). The Contractor shall: • Gather data for all applications, changes, redeterminations, enrollment forms, supporting documentation, benefit recovery claims, and pre-hearing and hearing tasks; • Provide adequate staffing resources to meet the requirements for the number of Eligibility Specialists (also referred to as “ES(s)” herein) operating in the Regional Change Centers, including the minimum staffing requirement and maximum staffing requirement to supply the number of Eligibility Specialists dedicated to the Regional Change Centers, as established by DFR; • Provide adequate staffing resources to meet the CCC eligibility operations requirements, Performance Metrics, and Key Performance Indicators; • Understand and interface with State systems that support the eligibility process, including but not limited to CODY Systems (and/or State fraud tracking and investigations system), IEDSS (Indiana Eligibility Determination Services System), LMS (Learning Management System), COGNOS, and DFR’s telephony and IVR systems (Interactive Voice Response); • Leverage State investments in facilities, equipment, and system infrastructure and automation capabilities by utilizing a solution that uses and improves utilization of resources available to FSSA (Note: The State will provide all facilities, equipment, and systems required for eligibility operations, and the Contractor shall indicate how they will use the current infrastructure and systems within DFR.) • Meet and improve the quality of services for programs and end to end case processing standards as defined by the State-approved Performance Metrics listed in Exhibit 2; • To ensure consistent work output and to drive accountability, all performance expectations will be based on, but not limited to, the State Program Policy Manuals, IEDSS Online Help, written directions received from DFR Management, including emails, and the application of the ‘End to E...
AutoNDA by SimpleDocs
General Project Requirements. The above scope of work shall be performed in a neat and orderly manner following all applicable building, mechanical, electrical and seismic codes. It is the intent for CTS to have a complete turnkey installation. All necessary material including but not limited to the equipment required by the scope, sheet metal, piping, piping accessories, valves, hangers, flexible ductwork, duct and pipe insulation, conduit, wire mold, device boxes, circuit panels, motor starters, disconnects, and wire shall be included. Cutting and patching as required to perform the work in this scope is included and affected areas shall be restored to their original condition upon completion of the work. All penetrations shall be sealed with appropriate fire, weather and thermal stops. Construction debris will be disposed of in a legally acceptable manor. All equipment shall be installed per the manufacturers’ installation recommendations. CTS and contractors will perform required equipment and system start-up, as well as, all air and water system testing and balancing. Roof penetrations, curb setting and roof patching shall be included. Supports for gas piping shall be large enough to allow the electrical contractor to run his conduit alongside of the gas piping. Two sets of filters are to be provided for all HVAC equipment. When construction is complete a new set of filters shall be installed by the mechanical contractor. Field verify electrical supply, duct configurations and dimensions prior to ordering equipment. CTS is responsible for cleanup, disposal and removal of all demolition and discarded material and debris relating to this project. All debris will be disposed of in a legally acceptable manor. Owner training will be provided on systems installed. As-built drawings and O&M manuals shall be provided. A 1-year parts and labor warranty on all equipment they install will be provided. A minimum 5-year compressor warranty and 10-year heat exchanger warranty shall be provided. ATTACHMENT B INSTALLATION SCHEDULE CTS plans to install the project over the Fall of 2018, with an anticipated substantial completion by November 2018 and project closeout by December 2018. The CTS project manager will submit a detailed schedule to be reviewed on a weekly basis with the City of X’Xxxxxx. Preliminary schedule is as follows and will be finalized with O’Fallon Staff and CTS Project Manager Contract Approval – May 2018 Order Equipment – June 2018 Mobilization – 9/4/18 Demo Existing Equipment...
General Project Requirements 

Related to General Project Requirements

  • Project Requirements Failure to comply with the following requirements will result in a suspension of all other operations:

  • Equipment Requirements No Equipment is provided to Customer as part of this Service.

  • Maintenance Requirements The Contractor shall ensure and procure that at all times during the Maintenance Period, the Project Highway conforms to the maintenance requirements set forth in Schedule-E (the “Maintenance Requirements”).

Time is Money Join Law Insider Premium to draft better contracts faster.