LEED and Project Close-Out Procedures Sample Clauses

LEED and Project Close-Out Procedures. (1) Evaluate and recommend use of LEED principles and guidelines, provide (to an order of magnitude that Owner approves as reasonably appropriate) cost-benefit analysis of various LEED credits, and establish and maintain procedures to ensure the Project achieves no less than a “Silver” certification by the USGBC and GBCI under LEED 2009 New Construction and Major Renovations, or such other level of certification as Owner may establish in accordance with Section II.1(A).
AutoNDA by SimpleDocs

Related to LEED and Project Close-Out Procedures

  • Project Closeout a. Participate in final inspection to prepare punch lists for project contractor to correct and/or to complete listed items. Verify that items on punch lists have been completed successfully assist COUNTY Project Manager or designee to determine completion date and coordinate project close out.

  • Move-Out Procedure Prior to either (i) the expiry of the Term, or (ii) the date on which the Resident is to vacate the Residence (detailed in Table 1 & 3), the Manager, or designate, can be requested in advance by the Resident to complete a visual inspection of the Suite to view the state of cleanliness and repair. If no request to inspect the suite is made by the Resident, the inspection will take place once the Resident has vacated the suite. In the event the Resident chooses to have the inspection completed prior to vacating the suite, the Manager, or designate, will inspect the suite and inform the Resident of potential damage and/or cleaning charges and outline what steps the student may take to mitigate charges. On vacating, all garbage and belongings of the Resident must be removed, and the suite must be cleaned to the point of restoring the suite to its original condition. Once the Resident has vacated, the Manager, or designate, will complete a documented visual inspection of the Suite. In the event deficiencies are found, the cost of cleaning the suite and restoring it to its original state may be deducted from the Resident’s original Deposit. There is a minimum cleaning charge of $25.00 and damage charges will be billed accordingly at the cost of restoring the suite to its original condition. Any items left behind by the Resident will be immediately discarded; the Residence shall not be liable to the Resident for any loss of property as a result. As with the “move-in procedures”, care must be exercised to avoid damage to doors, frames, walls, floor coverings and any other part of the Residence. The Resident is financially responsible to pay forthwith for any damage caused on moving out of the Residence.

  • Project Close-out Termination of a research project that used controlled-access data from an NIHdesignated data repository (e.g., dbGaP) and confirmation of data destruction when the research is completed and/or discontinued. The project close-out process is completed in the dbGaP Authorized Access System.

  • MOVE-OUT PROCEDURES Upon termination of this Lease Contract for any reason, Resident shall surrender possession of the Premises in the same condition as when received, in a good, clean and sanitary condition, including removing all trash from the Premises and returning furniture to its original placement. Owner shall note the condition of the Premises, including all appliances, furnishings and fixtures therein, and any damage done thereto which is deemed by Owner to have occurred during Resident’s occupancy and use of the Premises. Resident shall pay all utility and service bills to the Premises for which Resident is responsible and cancel all utility accounts in the name of the Resident. Resident shall return to Owner all keys, access cards, and remote control devices, if applicable, issued to the Resident by Owner. If all keys, cards, and devices issued to Resident are not returned to Owner, Resident shall pay all costs associated with re-keying and replacement of locks, keys, cards, and remote devices for the Premises. Resident’s failure to follow the prescribed move-out procedures may result in the partial or full application of the Deposit to cover these charges, but in no event shall such application be construed as liquidated damages. If no Deposit exists, Resident will be charged for all damages, cleaning, repairs, re-keying, and replacement costs, which will be due within 30 days of such billing. In the event Resident moves out prior to the end of the Lease Term, Resident shall be responsible for either the Reletting Fee or the Assignment Fee, in addition to continuing liability for Rent through the end of the Lease Term until a suitable replacement resident is identified.

  • Contract Closure Contracting Officer shall give appropriate written notice to Purchaser when Purchaser has complied with the terms of this contract. Purchaser shall be paid refunds due from Timber Sale Account un- der B4.24 and excess cooperative deposits under B4.218.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Contract Closeout ‌ Prior to the contract’s expiration date, Supplier may be provided contract close out documentation and shall complete, sign and return to VITA Supply Chain Management within 30 days of receipt. This documentation may include, but not be limited to: Patent/Royalty Certificate, Tangible Property/Asset Certificate, Escrow Certificate, SWaM Subcontracting Certification of Compliance, Sales Reports/IFA Payments Completion Certificate, and Final Payment Certificate. Supplier is required to process these as requested to ensure completion of close-out administration and to maintain a positive performance reputation with the Commonwealth of Virginia. Any closeout documentation not received within 30 days of Supplier’s receipt of the Commonwealth's request will be documented in the contract file as Supplier non-compliance. Supplier’s non-compliance may affect any pending payments due the Supplier, including final payment, until the documentation is returned.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Project Delivery Order Procedures The TIPS Member having approved and signed an interlocal agreement, or other TIPS Membership document, may make a request of the awarded vendor under this Agreement when the TIPS Member has services that need to be undertaken. Notification may occur via phone, the web, email, fax, or in person. Upon notification of a pending request, the awarded vendor shall make contact with the TIPS Member as soon as possible, but must make contact with the TIPS Member within two working days. Scheduling of Projects Scheduling of projects (if applicable) may be accomplished when the TIPS Member issues a Purchase Order and/or an Agreement or Contract that will serve as “the notice to proceed” as agreed by the Vendor and the TIPS Member. The period for the delivery order will include the mobilization, materials purchase, installation and delivery, design, weather, and site cleanup and inspection. No additional claims may be made for delays as a result of these items. When the tasks have been completed the awarded vendor shall notify the client and have the TIPS Member or a designated representative of the TIPS Member inspect the work for acceptance under the scope and terms in the Purchase Order and/or Agreement or Contract. The TIPS Member will issue in writing any corrective actions that are required. Upon completion of these items, the TIPS Member will issue a completion notice and final payment will be issued per the contractual requirements of the project with the TIPS Member. Any Construction contract prepared by the TIPS Member’s Legal Counsel may alter the terms of this subsection, “Scheduling of Projects”.

  • Schedule for Completing Agreement Closeout Activities Provide All Draft and Final Written Products on a CD-ROM or USB memory stick, organized by the tasks in the Agreement. Products: • Final Meeting Agreement Summary (if applicable) • Schedule for Completing Agreement Closeout Activities • All Draft and Final Written Products