MATERIALS, METHODS & EQUIPMENT. ‌ There shall be no limitation or restriction upon the Contractors' choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre-finished, or pre- assembled materials, tools, or other labor-saving devices. Contractors may, without restriction, install or use materials, supplies or equipment regardless of their source. Except as provided in Article 3, Section 3, the on-site installation or application of such items shall be performed by the craft having jurisdiction over such work; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check- off or testing of specialized or unusual equipment or facilities as designated by the Contractor. There shall be no restrictions as to work which is performed off-site except as may be imposed by law.
AutoNDA by SimpleDocs
MATERIALS, METHODS & EQUIPMENT. There shall be no limitation or restriction upon the Contractor's choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre-finished, or pre- assembled materials or products, tools, or other labor-saving devices. Contractors may, without restriction, install or use materials, supplies or equipment regardless of their source; provided, however, that where there is a Schedule “A” that includes a lawful union standards and practices clauses, then such clause as set forth in Schedule “A” agreements will be complied with, unless there is a lawful Agency specification (or specification issued by a Construction Manager which would be lawful if issued by the Agency directly) that would specifically limit or restrict the Contractor’s choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre-finished, or pre-assembled materials or products, tools, or other labor-saving devices, and which would prevent compliance with such Schedule “A” clause. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check-off or testing of specialized or unusual equipment or facilities as designated by the Contractor. There shall be no restrictions as to work which is performed off-site for Program Work.
MATERIALS, METHODS & EQUIPMENT. The Project documents alone shall govern choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre-finished, or pre-assembled materials, tool, or other labor- saving devices. Contractors must install or use materials, supplies or equipment pursuant to the Project Documents unless Contractor requests and receives written authorization from the Project Architect. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check-out or testing of specialized or unusual equipment or facilities as designated by the Contractor. Notwithstanding the foregoing statements, prefabrication issues relating to work traditionally performed at the job site shall be governed pursuant to the terms of the applicable Schedule A. There shall be no restrictions as to work, which is performed off-site for the Project, except for work done in a fabrication center, tool yard, or batch plant dedicated exclusively to the performance of work on the Project, and located adjacent to the “site of work”.
MATERIALS, METHODS & EQUIPMENT. A. There shall be no limitation or restriction upon the Contractor or sub-contractor's choice of materials, modules, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, prefabricated, pre-finished (except that all rebar for use in cast-in-place, on site construction will be cut and bent in accordance with local industry practices), or pre-assembled materials, tools, or other labor-saving devices. Contractors may, without restriction, install or use materials, supplies or equipment regardless of their source. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check-off or testing of specialized or unusual equipment or facilities as designated by the Contractor or sub-contractor. There shall be no restrictions as to work which is performed off-site for the Project, except that the Contractor and sub-contractors will make reasonable efforts to have pre-assembled duct work produced in shops represented by Sheetmetal Workers Local 38. The Contractor will make reasonable efforts to provide that any equipment or materials under the jurisdiction of the Plumbing and Steamfitting trade shall be accepted and installed by Plumbers, Steamfitters and Apprentices, provided such material or equipment conforms to the National Form of Agreement of the United Association. B. There shall be no stand-by Trades required for temporary power, light, water, or heat unless requested by the Owner. C. The Employer shall subcontract for the delivery of redi-mix concrete and asphalt only to companies whose wages and other economic benefits are equivalent to the area standards established by the Union unless said companies are unable or unwilling to supply redi-mix concrete or asphalt to the Employer. D Except to the extent otherwise agreed to by the parties in writing, All electrical and electronic work, including but not limited to, the installation, repair and maintenance of all building wiring systems, telephone, data, fire alarm, signs, TV, security wiring and devises, sound and alarm systems and building automation systems, shall be performed under the Local Agreement of IBEW Local 3. ARTICLE 7 - WORK STOPPAGES AND LOCKOUTS SECTION 1. NO STRIKES-NO LOCK O...
MATERIALS, METHODS & EQUIPMENT. There shall be no limitation or restriction upon the Contractors' choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use EXECUTION COPY 11 and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre-­ finished, or pre-assembled materials or products, tools, or other labor-saving devices. Contractors may, without restriction, install or use materials, supplies or equipment regardless of their source; provided, however, that where there is a Schedule "A" that includes a lawful union standards and practices clauses, then such clause as set forth in Schedule A Agreements will be complied with. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, checkoff or testing of specialized or unusual equipment or facilities as designated by the Contractor. There shall be no restrictions as to work which is performed off site for Program Work.
MATERIALS, METHODS & EQUIPMENT. There shall be no limitation or restriction upon the Contractors' choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre- finished, or pre-assembled materials or products, tools, or other labor-saving devices. Contractors may, without restriction, install or use materials, supplies or equipment regardless of their source. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check- off or testing of specialized or unusual equipment or facilities as designated by the Contractor. There shall be no restrictions as to work which is performed off-site for Program Work.
MATERIALS, METHODS & EQUIPMENT. There shall be no limitation or restriction upon the Contractor’s choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre-finished (except that all rebar for use in cast-in-place, on site construction will be cut and bent in accordance with local industry practices), or pre-assembled materials, tools, or other labor-saving devices. The Contractor may, without restriction, install or use materials, supplies or equipment regardless of their source. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check-off or testing of specialized or unusual equipment or facilities as designated by the Contractor. There shall be no restrictions as to work which is performed off-site for the Project.
AutoNDA by SimpleDocs
MATERIALS, METHODS & EQUIPMENT. With respect to work which falls outside the scope of this Agreement, there shall be no limitation or restriction upon the Contractors' choice of materials, techniques, methods, technology or design, or, regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre-finished, or pre-assembled materials, tools, or other labor-saving devices. Contractors may, without restriction, install or use materials, supplies or equipment regardless of their source, with the exception of pre-tied wire or welded reinforcing steel. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work pursuant to an applicable Collective Bargaining Agreement; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check-off or testing of specialized or unusual equipment or facilities as designated by the Contractor.
MATERIALS, METHODS & EQUIPMENT. There shall be no limitation or restriction upon the Contractor's choice of materials, techniques, methods, technology or design, or regardless of source or location, upon the use and installation of equipment, machinery, package units, pre-cast, pre-fabricated, pre- finished or pre-assembled materials, tools or other labor-saving devises. Contractors may, without restriction, install or use materials, supplies or equipment regardless of their source. The on-site installation or application of such items shall be performed by the craft having jurisdiction over such work pursuant to Collective Bargaining Agreement; provided, however, it is recognized that other personnel having special qualifications may participate, in a supervisory capacity, in the installation, check- off or testing of specialized or unusual equipment or facilities as designated by the Contractor. There shall be no restrictions as to work which is not performed at the Project site, with the exception of pre-tied or welded reinforcing steel.

Related to MATERIALS, METHODS & EQUIPMENT

  • Materials and Methods 86 2.1 PARTICIPANTS 87 We used baseline measurements from a convenience sample of participants in previous (3) and 88 ongoing cohort studies investigating the effects of rehabilitation on balance responses (Table 1). PD 89 participants were mild-moderate with bilateral symptoms (Xxxxx and Xxxx stage 2-3 (13)). All 90 participants provided written informed consent and all study procedures were approved by Institutional 91 Review Boards at the Georgia Institute of Technology and Emory University.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • MATERIALS AND WORKMANSHIP (a) All equipment, material, and articles incorporated into the work covered by this Agreement shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this Agreement. (b) Seller shall obtain Company approval of the machinery and mechanical and other equipment to be incorporated into the work. When required by Company, Seller shall also obtain Company's approval of the material or articles which Seller contemplates incorporating into the work. When so directed, Seller shall submit samples for approval at Seller's expense. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. (c) References in the specifications or drawings to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. Seller may, with Company's written approval, use any equipment, material, article, or process that is equal to that specified, unless the words "No Substitution" follow the listing of the item in the specifications or drawings. Unless otherwise agreed, modifications due to use of “or equal” supplies, is at Seller’s expense. (d) All work under this Agreement shall be performed in a skillful and workmanlike manner. Company may require, in writing, Seller to remove from the work any employee Company deems incompetent, careless, or otherwise objectionable.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement. 8.2 The Contractor shall ensure that Texas Department of Health licensed individuals, consultants or companies are used for any required asbestos work including asbestos inspection, asbestos abatement plans/specifications, asbestos abatement, asbestos project management and third-party asbestos monitoring.

  • Materials and Improvements Title to materials, improvements, and other property required of PURCHASER by this contract shall vest in and become the property of STATE at the time such are furnished by PURCHASER and accepted by STATE. Only materials, improvements, and property free and clear of liens, claims, and encumbrances shall be furnished by PURCHASER. All existing improvements located on State land, and any improvements placed on State land by PURCHASER which become the property of STATE, shall be safeguarded by PURCHASER. If such improvements are injured, damaged, or removed from the areas of operations by PURCHASER or by contractors of PURCHASER, such improvements shall be repaired (or replaced, in the event of removal,) as soon as possible by PURCHASER, without cost to STATE.

  • Contractor’s Equipment Payment for required equipment owned by the Construction Manager or an affiliate of the Construction Manager will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the Government will be based on one-half the derived hourly rate under this subsection.

  • Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except:

  • Materials Transfer In order to facilitate the Development activities contemplated by this Agreement, either Party may provide to the other Party certain biological materials or chemical compounds Controlled by the supplying Party (collectively, “Materials”) for use by the other Party in furtherance of such Development activities. Except as otherwise provided for under this Agreement, all such Materials delivered to the other Party will remain the sole property of the supplying Party, will be used only in furtherance of the Development activities conducted in accordance with this Agreement, will not be used or delivered to or for the benefit of any Third Party, except to subcontractors, without the prior written consent of the supplying Party, and will be used in compliance with all Applicable Laws. The Materials supplied under this Agreement must be used with prudence and appropriate caution in any experimental work because not all of their characteristics may be known. Except as expressly set forth in this Agreement, THE MATERIALS ARE PROVIDED “AS IS” AND WITHOUT ANY REPRESENTATION OR WARRANTY, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION ANY IMPLIED WARRANTY OF MERCHANTABILITY OR OF FITNESS FOR ANY PARTICULAR PURPOSE OR ANY WARRANTY THAT THE USE OF THE MATERIALS WILL NOT INFRINGE OR VIOLATE ANY PATENT OR OTHER PROPRIETARY RIGHTS OF ANY THIRD PARTY.

  • Construction Methods 3.1 The Contractor shall provide all tools, equipment, materials, labor and work for the excavation and removal of the unsuitable subgrade soils and their subsequent replacement with the specified backfill soils as directed by the Owner’s representative. All work under this item shall be performed in a safe and workmanlike manner. 3.2 All work shall be performed in accordance with DelDOT Standard Specifications Section 821. 3.3 Following the removal of existing pavements, the Owner’s representative will review the exposed subgrade and provide recommendations for the undercutting of unsuitable subgrade materials as required. The depth and extent of undercut excavation, if required, will be determined by the Owner’s representative at the time of excavation. 3.4 All excavated materials shall become the property of the Contractor and be removed from the site at the completion of the project at no additional expense to the Owner. 3.5 Undercut excavations should be backfilled with graded aggregate. Backfill shall be placed in loose lifts not exceeding 8 inches thick. Each lift should be compacted with at least 3 passes of a minimum 5-ton, walk-behind or self-propelled vibratory roller when the size of the area permits, or with a vibrating plate mechanical compactor for smaller areas. Lift thickness shall be reduced to 6 inch loose lift when using a vibratory plate compactor. 3.6 The Contractor shall take precautions as necessary to minimize the potential for disturbance or softening of the pavement subgrade materials from inclement weather or construction traffic. As a minimum, this shall include the placement of backfill on the same day as the excavation. Any soft areas which develop shall be undercut and replaced with graded aggregate at no additional cost to the Owner. 3.7 Where undercutting is performed, the geotextile fabric shall be installed. The fabric should be pulled tight and lapped a minimum of 12 inches.