Mechanical Upgrades Sample Clauses

Mechanical Upgrades. Auxiliary High Efficiency Boilers 105 Table 1 - Cost Savings by Annual Period 4 Table 2 - Energy Savings by Annual Period 4 Table 3 - Total Annual Guaranteed Energy Savings (Units) 7 Table 4 - Total Annual Guaranteed Cost Savings ($) 7 Table 5 - Guaranteed Cost Savings by FIM & Option Type ($) 7 Table 6 - Utility Baseline 8 Table 7 - Baseline Operating ParametersXxxxxxxx Area High School 8 Table 8 - Baseline Operating Parameters – Xxxxxxxx Middle School 9 Table 9 - Baseline Operating Parameters – Xxxxxxx X. Xxxxxx 9 Table 10 - Baseline Operating Parameters – River View Elementary School 9 Table 11 - Baseline Operating Parameters – Pittston Elementary School 9 Table 12 - Baseline Operating Parameters – Xxxxx Xxxxxxxx School 10 Table 13 - Baseline Operating Parameters – Xxxxx Xxxxxxxx 10 Table 14 - Baseline Operating Parameters – Central Office 10 Table 15 - Baseline Operating Parameters – Transportation Office 11 Table 16 - Baseline Operating Parameters – Xxxxxxxx Area High School 11 Table 17 - Baseline Operating Parameters – Xxxxxxxx Middle School 11 Table 18 - Baseline Operating Parameters – Xxxxxxx X. Xxxxxx 12 Table 19 - Baseline Operating Parameters – River View Elementary School 12 Table 20 - Baseline Operating Parameters – Pittston Elementary School 12 Table 21 - Baseline Operating Parameters – Xxxxx Xxxxxxxx School 12 Table 22 - Baseline Operating Parameters – Xxxxx Xxxxxxxx 13 Table 23 - Baseline Operating Parameters – Central Office 13 Table 24 - Baseline Operating Parameters – Transportation Office 13 Table 25 - Contract Annual Period 1 Utility Rates 14 Table 26 - Annual Period 1 Realized Cost Savings by FIM 15 Table 27 - Option A Realized Savings for the Current Annual Period 16 Table 28 – Summary of the Lighting Retrofit Energy and Cost Savings 17 Table 29 – Summary of Pre- and Post-Retrofit Lighting Measurements 17 Table 30 – Quantities of Lighting Fixtures Retrofitted 19 Table 31 - Summary of the Building Envelope Improvements Energy and Cost Savings 20 Table 32 – Summary of Building Envelope Improvements Area 20 Table 33 - Summary of the Building Envelope Air Infiltration Improvements Energy and Cost Savings 21 Table 34 - Summary of the Building Envelope Insulation Improvements Energy and Cost Savings 21 Table 35 – Summary of Results from Runtime Logs 23 Table 36 - Summary of the Walk-in Refrigerator and Freezer Controls Energy and Cost Savings 24 Table 37 – Summary of Building Automation Energy and Cost Savings 24 Table 38 - Summary of t...
AutoNDA by SimpleDocs

Related to Mechanical Upgrades

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Software Upgrades Software Upgrades consist of new product releases which are issued periodically and may include new functionality, enhancements, and bug fixes. Software Upgrades are provided only for standard hardware platforms and operating systems supported by COMSPOC as described in the Documentation. Software Upgrades will apply only to unmodified Software and commercially released updated versions of the Software. You are responsible for making or arranging for updates to interfaces for nonstandard devices or custom applications. Software Upgrades are provided subject to the terms and conditions of the then current and applicable COMSPOC Software License Agreement, available on COMSPOC’s website at xxxx://xxx.xxxxxxx.xxx/sla or with the deliverable Software or upon request. All major product releases and maintenance releases will be made available and may be shipped directly to you, upon request by contacting your COMSPOC point of contact or xxxxxxx@xxxxxxx.xxx. You may upgrade to the latest product version at any time during the term of the Annual Support and Upgrades Agreement. If you opt not to renew the Annual Support and Upgrade Agreement, You have 60 days from the end of the Annual Support and Upgrades Agreement term to upgrade to the latest product version available prior to the end of the Annual Support and Upgrades Agreement term. If You request an upgrade beyond this 60-day period, You will be required to renew the Annual Support and Upgrades Agreement in order to upgrade to the latest product version.

  • Network Upgrades The Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. If the Transmission Owner and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Transmission Owner elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer.

  • Technology Upgrades Notwithstanding any other provision of this Agreement, Verizon shall have the right to deploy, upgrade, migrate and maintain its network at its discretion. The Parties acknowledge that Verizon, at its election, may deploy fiber throughout its network and that such fiber deployment may inhibit or facilitate PNG’s ability to provide service using certain technologies. Nothing in this Agreement shall limit Verizon's ability to modify its network through the incorporation of new equipment or software or otherwise. PNG shall be solely responsible for the cost and activities associated with accommodating such changes in its own network.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Maintenance Windows 12.3.23.1 Generally, Qwest performs major Switch maintenance activities off-hours, during certain “maintenance windows”. Major Switch maintenance activities include Switch conversions, Switch generic upgrades and Switch equipment additions.