Obligations of Developer During Construction a. All culverts, storm sewers and underdrains, manholes, paving, curbing, setting of monuments and other Improvements are subject to inspection by the Township Engineer. At least five (5) days prior to the commencement of each Improvement, Developer shall notify the Township Engineer. Developer shall also notify the Township Engineer at least two (2) days prior to the date when Developer or its contractor or any subcontractor performs any work subject to the inspection by the Township. Developer shall also notify the Township Engineer at least two (2) days prior to commencing each separate paving operation or Improvement and the Township Engineer shall inspect the materials and workmanship used on each such operation.
AutoNDA by SimpleDocs
Obligations of Developer During Construction. All utility lines to be installed in or upon the Property in connection with the Project shall be placed in accordance with the Plan, and if not otherwise specified on the Plan, shall be placed underground. Developer shall be obligated to locate all underground structures and utilities that may be encountered during the construction of the Project, including, but not limited to, water, steam, oil and gas mains and lines, and storm and sanitary sewers, and shall undertake any and all steps necessary to protect these structures and utilities from damage or disruption. To determine the location of these underground structures and utilities, Developer shall make arrangements with a representative of the owners of such underground structures or utilities to xxxx the locations thereof. Developer shall pay any and all costs associated with the identification and protection of all underground structures and utilities including, but not limited to, the digging of test holes, the services of the aforementioned owner representatives, and the use of men and equipment to determine the location of an underground structure or utility. Developer shall be responsible for any and all damage to any underground structure or utility resulting from Developer’s construction upon or development of the Property and shall immediately repair all such damage. Developer shall not enter upon or occupy with men, tools, or material any private lands outside the Property, without prior written permission of the owners of such lands. At all times during the construction of the Project, Developer shall conduct its work in such a manner as to minimize the obstruction of traffic and any inconvenience to the general public and the use and enjoyment of their residences. During the course of the construction, Developer shall maintain such barricades, warning lights, and/or flares as are necessary to protect traffic and the traveling public in general. No materials shall be stored upon any street under any circumstance, regardless of whether such street has yet to be dedicated to Township. All storm drainage and sewer inlets shall be kept unobstructed at all times. Fire hydrants on, adjacent to, or serving the Property shall be kept accessible to fire apparatus at all times, and no materials or obstructions shall be placed within fifteen feet (15') of any hydrant. All unfinished work in or upon a street shall be left in such a condition as to make the Property accessible at all points to police, ...
Obligations of Developer During Construction 

Related to Obligations of Developer During Construction

  • Delays during construction Without prejudice to the provisions of Clause 10.3 (ii), in the event the Contractor does not achieve any of the Project Milestones or the Authority’s Engineer shall have reasonably determined that the rate of progress of Works is such that Completion of the Project Highway is not likely to be achieved by the end of the Scheduled Completion Date, it shall notify the same to the Contractor, and the Contractor shall, within 15 (fifteen) days of such notice, by a communication inform the Authority’s Engineer in reasonable detail about the steps it proposes to take to expedite progress and the period within which it shall achieve the Project Completion Date.

  • General Construction Obligations (a) Without limiting Section 10.3:

  • Obligations of Contractor Contractor agrees that:

  • Maintenance during Construction Period (i) During the Construction Period, the Contractor shall maintain, at its cost, the existing lane(s) of the Project Highway so that the traffic worthiness and safety thereof are at no time materially inferior as compared to their condition on Appointed Date, and shall undertake the necessary repair and maintenance works for this purpose; provided that the Contractor may, at its cost, interrupt and divert the flow of traffic if such interruption and diversion is necessary for the efficient progress of Works and conforms to Good Industry Practice; provided further that such interruption and diversion shall be undertaken by the Contractor only with the prior written approval of the Authority’s Engineer which approval shall not be unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor shall at all times be responsible for ensuring safe operation of the Project Highway. It is further agreed that in the event the Project includes construction of a bypass or tunnel and realignment of the existing carriageway, the Contractor shall maintain the existing highway in such sections until the new Works are open to traffic.

  • Obligations of the Contractor (i) Subject to and on the terms and conditions of this Agreement, the Contractor shall undertake the survey, investigation, design, engineering, procurement, construction, and maintenance of the Project Highway and observe, fulfil, comply with and perform all its obligations set out in this Agreement or arising hereunder.

  • OBLIGATIONS OF THE DEVELOPER In addition to and not in derogation or substitution of any of its other obligations under this Agreement, the Developer shall have the following obligations:

  • OBLIGATIONS OF THE LESSEE A. The Lessee shall keep the premises in a clean, sanitary, neat and presentable condition.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • OBLIGATIONS OF LESSEE The Lessee shall be primarily responsible whenever needed for the maintenance and general pickup of the entranceway leading into the Premises, so that this is kept in a neat, safe and presentable condition. The Lessee shall also be responsible for all minor repairs and maintenance of the leasehold Premises, particularly those items which need immediate attention and which the Lessees, or their employees, can do and perform on their own, including but not limited to, the replacement of light bulbs, as well as the normal repair and cleaning of windows, cleaning and clearing of toilets, etc., and the Lessee shall properly maintain the Premises in a good, safe, and clean condition. The Lessee shall properly and promptly remove all rubbish and hazardous wastes and see that the same are properly disposed of according to all local, state or federal laws, rules regulations or ordinances. In the event the structure of the Premises is damaged as a result of any neglect or negligence of Lessee, their employees, agents, business invitees, or any independent contractors serving the Lessee or in any way as a result of Lessee’s use and occupancy of the Premises, then the Lessee shall be primarily responsible for seeing that the proper claims are placed with the Lessee’s insurance company, or the damaging party's insurance company, and shall furthermore be responsible for seeing that the building is safeguarded with respect to said damage and that all proper notices with respect to said damage, are made in a timely fashion, including notice to the Lessor, and the party or parties causing said damage. Any damage that is not covered by an insurance company will be the liability of the Lessee. The Lessee shall, during the term of this Lease, and in the renewal thereof, at its sole expense, keep the interior of the Premises in as good a condition and repair as it is at the date of this Lease, reasonable wear and use excepted. This obligation would include the obligation to replace any plate glass damaged as a result of the neglect or acts of Lessee or her guests or invitees. Furthermore, the Lessee shall not knowingly commit nor permit to be committed any act or thing contrary to the rules and regulations prescribed from time to time by any federal, state or local authorities and shall expressly not be allowed to keep or maintain any hazardous waste materials or contaminates on the Premises. Lessee shall also be responsible for the cost, if any, which would be incurred to bring her contemplated operation and business activity into compliance with any law or regulation of a federal, state or local authority.