PROGRESS CLEANING. 6.13.1 The CM shall remove all waste materials, rubbish, and mud attributable to the Work to an appropriate disposal location at or near the Site.
6.13.2 The CM shall perform weekly broom cleaning of hard flooring surfaces in the area of the Work.
6.13.3 The CM shall remove, once each working day or as appropriate for the Project, all waste materials and rubbish from the disposal location at or near the Site.
6.13.4 The CM shall remove, as appropriate for the Project or as the A/E or Owner directs, any waste materials or rubbish from areas adjacent to the Project.
6.13.4.1 The CM shall dispose of waste materials, rubbish, and construction debris in a lawful manner in approved recycling facilities or landfills.
6.13.5 If the CM fails to clean up during the progress of the Work, the Contracting Authority may clean up on behalf of the CM and at the CM’s expense. If the CM fails to maintain the areas adjacent to the Project clean and free of waste materials and rubbish, the Contracting Authority may also direct the local jurisdiction responsible for the area to have the area cleaned to its satisfaction at the CM’s expense.
6.13.5.1 The Contracting Authority may deduct the cleaning costs from payments then or thereafter due the CM. If payments then or thereafter due the CM are not sufficient to cover those amounts, the CM shall immediately pay the amount of the insufficiency to the Owner.
6.13.6 The CM shall remove excavated material and spoil to a suitable off-site location approved by the Contracting Authority.
6.13.6.1 If the Owner designates a location on its property for disposal or storage of clean topsoil and/or subsoil in the Contract Documents, the CM shall remove such materials to the designated location.
PROGRESS CLEANING. Reserved.
PROGRESS CLEANING. A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.
X. Xxxxx and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.
PROGRESS CLEANING. A. General
1. Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic, drainage or over loading the structure and providing required protection of materials.
2. Construction Manager shall not allow accumulation of scrap debris, waste, material and other items not required for construction of the Work.
3. Construction Manager shall remove debris from the Project Site at the end of each workday. Upon completion of the Work hereafter specified, all debris, equipment and unused materials provided for the Work shall be removed from the site and legally disposed of and the Work area(s) shall be cleaned at no additional expense to Owner.
4. Construction Manager shall maintain the site and building in a neat and orderly condition at all times. Contractor: Change Order No.: Contract No.: Date:
1. This change order provides full and complete settlement for any and all claims arising out of, or relating to, performance of the work referred to below and described herein as follows.
2. You are hereby directed to proceed with the work described herein as follows: Net Change to Estimated Construction Cost, Increase (Decrease) $ Est. Contr. Cost: $0.00 Total Contingency: $ Orig. Contingency: $0.00 Previous Change Orders: $ Add Contingency: $0.00 This Change Order: $ GMP: $0.00 Total Change Orders to Date: $ Contingency Balance: $ NOT VALID UNLESS SIGNED BY THE OWNER SIGNATURE OF THE CONTRACTOR INDICATES HIS AGREEMENT HEREWITH INCLUDING ANY ADJUSTMENTS IN THE CONTRACT SUM OR CONTRACT TIME. Architect Signature: Date: Contractor: Signature: Date: INTERNAL APPROVALS Owner: ATLANTA INDEPENDENT SCHOOL SYSTEM Project Manager Signature Date: Director of Capitol Improvement Signature Date: Xxxx Xxxxx Executive Director of Facilities Signature Date: Reimbursement Request Number Project Number Project Name To be the best of my knowledge and belief, I certify that all items, units, quantities, and prices of work and material shown on this Reimbursement Request Number are correct and that all work has been performed and materials supplied in full accordance with the terms and conditions of the contract documents between the (Owner) and dated (Contractor) and all authorized changes thereto; and that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this estimate and that no part of the “amount due this estimate” has been received.
PROGRESS CLEANING. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.
PROGRESS CLEANING. 6.14.1 The DB shall remove all waste materials, rubbish, and mud attributable to the Work to an appropriate disposal location at or near the Site.
6.14.2 The DB shall perform weekly broom cleaning of hard flooring surfaces in the area of the Work.
6.14.3 The DB shall remove, once each working day or as appropriate for the Project, all waste materials and rubbish from the disposal location at or near the Site.
6.14.4 The DB shall remove, as appropriate for the Project or as the Contracting Authority or Owner directs, any waste materials or rubbish from areas adjacent to the Project.
6.14.4.1 The DB shall dispose of waste materials, rubbish, and construction debris in a lawful manner in approved recycling facilities or landfills.
6.14.5 If the DB fails to clean up during the progress of the Work, the Contracting Authority may clean up on behalf of the DB and at the DB’s expense. If the DB fails to maintain the areas adjacent to the Project clean and free of waste materials and rubbish, the Contracting Authority may also direct the local jurisdiction responsible for the area to have the area cleaned to its satisfaction at the DB’s expense.
6.14.5.1 The Contracting Authority may deduct the cleaning costs from payments then or thereafter due the DB. If payments then or thereafter due the DB are not sufficient to cover those amounts, the DB shall immediately pay the amount of the insufficiency to the Owner.
6.14.6 The DB shall remove excavated material and spoil to a suitable off-site location approved by the Contracting Authority.
6.14.6.1 If the Owner designates a location on its property for disposal or storage of clean topsoil and/or subsoil in the Contract Documents, the DB shall remove such materials to the designated location.
PROGRESS CLEANING. A. General
1. Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic, drainage or over loading the structure and providing required protection of materials.
2. Construction Manager shall not allow accumulation of scrap debris, waste, material and other items not required for construction of the Work.
3. Construction Manager shall remove debris from the Project Site at the end of each workday. Upon completion of the Work hereafter specified, all debris, equipment and unused materials provided for the Work shall be removed from the site and legally disposed of and the Work area(s) shall be cleaned at no additional expense to Owner.
4. Construction Manager shall maintain the site and building in a neat and orderly condition at all times. END OF SECTION
PROGRESS CLEANING. A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F.
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
D. Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.
E. Cutting and Patching: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials.
1. Thoroughly clean piping, conduit, and similar features before applying paint or other finishing materials. Restore damaged pipe covering to its original condition.
F. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
G. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
H. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period.
I. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
PROGRESS CLEANING. Keep premises and public properties free from accumulations of waste, debris and rubbish, caused by operations. Maintain Project in accord with State and local safety, health, and insurance standards.
PROGRESS CLEANING. A. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Containerize hazardous and unsanitary waste materials separately from other waste. Xxxx containers appropriately and dispose of legally, according to regulations.
a. Use containers intended for holding waste materials of type to be stored.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.
F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.