Services and other things provided by the Employer. Describe what the Employer will provide such as services (including water and electricity) and “free issue” plant and materials and equipment.
Services and other things provided by the Employer. 3.1. Site Services Provided by the Employer
Services and other things provided by the Employer. The employer shall provide power, water, waste disposal areas, lighting and ablution. Any additional lighting requirements around the work area shall be provided by the Contractor. The Contractor shall provide everything else necessary for providing the Works. The Employer will ensure access to the site for personnel qualifying as per the Employers requirements for access control. The Employer will do the induction training for the Contractor. Contractor has submitted the valid Certificate of Compliance. The Contractor adheres to the site services requirements and procedure The Employer supplies, free of charge, reasonable quantities of potable water required for the purposes of this contract from the existing points. The Contractor provides, at his own cost, all connection fittings, pipe work, temporary plumbing, and pumps necessary to lead the water from the Employer’s points of supply to the various points where it is required. Power is available at the existing points. The Contractor provides his own portable 380V electrical distribution boards, and supply cables to and from the boards, for all his power supply requirements to execute the works. Contractor’s Electrical Distribution Boards complies with OHSA as referred to in the Electrical Installation Regulations and the Electrical Machinery Regulations. Each board brought onto site has a Certificate of Compliance issued by an accredited person. The Contractor’s electrical distribution boards are installed at the works on a time negotiated with the Supervisor, prior to the possession date. The Employer connects distribution boards to a 380V three-phase AC power supply, only after the Contractor has submitted the valid Certificate of Compliance. All Contractors' Electrical Distribution Boards are earthed to the steel structure of the plant. The Employer provides the Contractor access to identified existing toilet facilities. The Contractor provides a First Aid service to his employees and sub-Contractors. In the case where these prove to be inadequate, like in the event of a serious injury, the Employer’s Medical Centre and facilities will be available. Outside the Employer’s office hours, the Employer’s First Aid Services are only available for serious injuries and life threatening situations. The Employer recovers the costs incurred, in the use of the above Employer’s facilities, from the
Services and other things provided by the Employer. The Employer’s Representative will arrange the induction Water in a form of Low Pressure Service and Electricity Compressed air Scaffolding Before commencement of the project As and when required at a designated site assigned to the contractor by the employer for establishment As and when required As and when required C4: Site Information Kendal Power Station is situated approximately 40km South West of Witbank in the Mpumalanga province. Construction started in 1982 and took 11 years to complete. Kendal Power Station comprises six generating sets (Units) of 686 MW each, the station capacity is 4116 MW, which is indirectly dry-cooled. The generators produces electricity at a voltage of 22KV, the generator transformers steps up the transmission voltage to 400kV. Kendal Power Station receives its coal supply of over a million tons per month from a neighbouring mine Khutala as well as other sources with varying characteristics. The ash that remains after the combustion of coal has two grading i.e. coarse ash (5% of total ash) and fly ash (95% of total ash). The fly ash together with waste gasses passes through the electrostatic precipitators where 99.9% of the ash is collected. The coal ash is removed by a submerged scraper conveyor to the apron conveyor. The fly ash is moistened and mixed in the ash conditioners. Both grading of ash are transported via the overland conveyors to the ash dump, where it is spread by an ash spreader, levelled and covered with topsoil and finally regressed. The power station is a Zero Liquid Effluent Discharge Station and ISO 14001 compliant. The main access gate to the Power Station is at 26° 5'0.96"S and 28°58'29.01"E.
C4.1 Information about the site at time of tender which may affect the work in this contract
1. Access limitations
2. Ground conditions in areas affected by work in this contract
3. Hidden and other services within the site
4. Details of existing buildings / facilities which Contractor is required to work on
Services and other things provided by the Employer. Describe what the Employer will provide such as services (including water and electricity) and “free issue” Plant and Materials and equipment. C4: Site Information The bypass is situated in the North East Grid in Mpumalanga near Embalenhle township and the Sasol Secunda Plant. The work area will be within the enclosed area as depicted below. There are three (3) 400kV lines within the enclosure; Camden Sol 1 &2 plus Xxxxx Tutuka – the enclosure was installed owing to the fact that the lines in that section are below the ground clearance as per the SANS10280 and is thus a safey concern due to close proximity of persons and vehicles in the area. GPS Co-ordinates: -26.5503710S, 29.0991190E
C4.1: Information about the site at time of tender which may affect the work in this contract
1. Access limitations
2. Ground conditions in areas affected by work in this contract
3. Hidden and other services within the site
4. Details of existing buildings / facilities which Contractor is required to work on
Services and other things provided by the Employer. Describe what the Employer will provide such as services (including water and electricity) and “free issue” plant and materials and equipment. None Task Order Task Order form for use when work within the service is instructed to be carried out within a stated period of time on a Task by Task basis Task Order No. [●] service .[●] To: [●]....................................................................................................................................................... .......................................................................................................................... (Contractor) I propose to instruct you to carry out the following task: Description [●] Starting date [●] Completion Date [●] Delay damages per week [●] Please submit your price and programme proposals below.
Services and other things provided by the Employer. Describe what the Employer will provide such as services (including water and electricity) and “free issue” plant and materials and equipment. Safety, Environmental and Security Induction Alcohol Screening and Testing Training ORHVS Safety Workshop TBA If required If required Hardhat (if required) If required
Services and other things provided by the Employer. The Employer will not provide any plant, equipment or material. There will be no other activities on site that will interfere with the execution of the requirements of this task other than train operational activities. In this regard the Consultant shall acquaint himself of and abide by the requirements of specification: Transnet E7/1 (July 1998) Specification for works on, over, under or adjacent to railway lines and near high voltage equipment.
Services and other things provided by the Employer. The Employer will, at his expense, arrange for, develop and maintain the various facilities and services at or near the Site, as applicable. The services and facilities provided by the Employer are listed below: Electricity; Water supply; and Sanitary Services. Induction training for the Contractor. Site for the Contractor’s yard at a location that is indicated to the Contractor. The Contractor provides all the facilities required by him for such a site at his cost C4: Site Information
C4.1: Information about the site at time of tender which may affect the work in this contract
Services and other things provided by the Employer. The employer shall provide power, water, waste disposal areas, lighting and ablution. Any additional lighting requirements around the work area shall be provided by the Contractor. The Contractor shall provide everything else necessary for providing the Works. The Employer will ensure access to the site for personnel qualifying as per the Employers requirements for access control. The Employer will do the induction training for the Contractor. Contractor has submitted the valid Certificate of Compliance. The Contractor adheres to the site services requirements and procedure The Employer supplies, free of charge, reasonable quantities of potable water required for the purposes of this contract from the existing points. The Contractor provides, at his own cost, all connection fittings, pipe work, temporary plumbing, and pumps necessary to lead the water from the Employer’s points of supply to the various points where it is required.