Flushing. 1. Prior to testing, water mains shall be cleaned and flushed to remove all sand and foreign matter. Water used for filling and cleaning shall be from an approved potable water source. Sufficient flushing water shall be introduced into the mains to produce a scouring velocity of not less than 3.5 feet per second to resuspend the solids, and this rate of flow shall be continued until the discharge is clear and no evidence of silt or foreign matter is visible. The Contractor shall dispose of all water used for flushing without causing a nuisance or property damage. 2. In the event that the Contractor cannot obtain the flushing velocity, a poly-pig swab may be used to clean the pipeline. The Contractor shall submit pigging plan to the Utility Owner and GDOT for review. The plan shall include type of pig material, water flow rate, discharge points, poly-pig detector and retrieval options.
AutoNDA by SimpleDocs
FlushingWater Utility shall be solely responsible for flushing water mains within its system. Flushing allowances will be provided by Seattle only when the Operating Board determines that flushing is required to maintain or improve regional water quality.
Flushing. The main shall be flushed through a hydrant at the end of the main. If no hydrant is installed at the end of the main, the Contractor shall provide a tap large enough with a goal of achieving a velocity of 2.5 ft/sec. The gallons per minute to achieve 2.5 ft./sec velocities for different diameter pipes are provided in Table 1. District water at no cost to the Contractor will be available to the work site for use in disinfecting and flushing mains. The Contractor shall furnish all necessary pipe and hose connections. The Contractor shall exercise care in the use of the water to prevent contamination of the existing water supply. The Contractor is responsible for providing adequate drainage during flushing and is responsible for any damage that may occur. Drainage shall be away from the main, and flooding of the trench shall be prevented. The volume of water flushed shall be measured or calculated and reported to the District Inspector. Wherever the conditions allow, the new water main shall be kept isolated from the active distribution system using a physical separation until satisfactory bacteriological testing has been completed and the disinfectant water flushed out. Water required to fill the new main for hydrostatic pressure testing, disinfection, and flushing shall be supplied through a temporary connection between the distribution system and the new main. The temporary connection shall include a double check valve assembly backflow preventer and shall be disconnected (physically separated) from the new main during the hydrostatic pressure test. It will be necessary to reestablish the temporary connection after completion of the hydrostatic pressure test to flush out the disinfectant water prior to final connection of the new main to the distribution system.
Flushing. Flushing of the Interconnection through the valve vault and out the other parties’ adjacent hydrant shall be performed by both parties every six months. .
Flushing. Following successful chlorination by the contractor the water main shall be flushed for a minimum of 24 hours before a safe water sample will be taken.
Flushing. Flush-all main lines before valves are installed, all laterals when rise assemblies are in place, but before sprinkler heads are installed, and all potable systems when complete. Flushing shall be done with all water diverted from any opening in the system.
FlushingCompany Residence (State)
AutoNDA by SimpleDocs
FlushingDistribution systems are normally flushed once a year through the blow-offs. In some water systems, the flushing must be done more often to keep sediment and sand in the piping under control. The flushing should be done during time of minimum water use. The frequency of flushing should be such that it prevents legitimate consumer complaints. Each gate valve on the water system should be turned annually to counteract mineral buildup and the subsequent jamming of the valve. At least once a year the system should be checked for leakage. This can be accomplished in the following way. The water system's customers should be asked not to use any water between midnight to 6:00 A.M. on a particular evening. The water system operator should check system usage during this period by noting the usage on the meter or any change in the water level in your vented storage tanks (supply sources turned off). If there is any significant system demand, this can be attributed to leakage. It is important to note that the force from this leakage sets in motion sand particles in the soil that will abrade the general area of the pipe ultimately to the point of total failure. The noise of this running water can normally be heard through the use of geophones, even though the leak has not surfaced. Intermediate and larger municipal water systems in your area likely have geophones and may be willing to loan them to you. If not, please contact our office for a list of contractors with this or more specialized types of equipment. 1 Utility Plant (101-106) $ 5,338,898 $ 218,973 $ 5,557,871 2 Less: Accumulated Depr. and Amort. (108-110) $ 1,734,957 $ 71,028 1,805,985 3 Net Plant $ 3,603,941 $ 147,946 $ 3,751,887 4 Utility Plant Acquisition Adj. (Net) (114-115) (76,261) 28,943 (105,204) 5 Total Net Utility Plant $ 3,527,680 $ 119,003 $ 3,646,683 OTHER PROPERTY AND INVESTMENTS 6 Nonutility Property (121) 7 Less: Accumulated Depr. and Amort. (122) 8 Net Nonutility Property 9 Investment in Associated Companies (123) 11 Utility Investments (124) 12 Other Investments 1,049 1,049 13 Special Funds(126-128) 14 Total Other Property & Investments $ 1,049 $ 1,049 CURRENT AND ACCRUED ASSETS 16 Cash (131) 37,980 (12,955) 25,025 17 Special Deposits (132) 18 Other Special Deposits (133) 19 Working Funds (134) 20 Temporary Cash Investments (135) 21 Accounts and Notes Receivable-Net (141-144) 112,040 112,040 22 Accounts Receivable from Assoc. Co. (145) 19,673 19,673 23 Notes Receivable from Assoc. Co. (146)...

Related to Flushing

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • WATERBEDS The Tenant: (check one)

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • Energy Cooperation shall focus on: (a) renewable energy; (b) promoting the saving of energy; (c) applied research relating to networks of databases linking the two Parties' economic and social operators; (d) backing efforts to modernise and develop energy networks and the interconnection of such networks with Community networks.

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.