Preliminary Drawings Sample Clauses

POPULAR SAMPLE Copied 1 times
Preliminary Drawings. The number of calendar days, following receipt of necessary approvals of the Schematic Drawings, within which the Architect shall furnish complete Preliminary Drawings and outline specifications for review by the Owner, DCM, and the SDE and shall furnish an estimate of the Cost of the Work for the Owner’s approval.
Preliminary Drawings. No later than four (4) weeks prior to the projected construction commencement date, Tenant shall furnish Landlord one (1) sepia and six (6) complete sets of prints of -" scale preliminary drawings showing at least the following information: a. Floor plan including furniture layout, partition layout, door layout, power and telephone outlet locations, items above standard finish, floor loading information beyond 70 psf, etc. b. Reflected ceiling plan including lighting layout, exit signs, registers, grilles, diffusers, exhaust fans, ceiling breaks, etc. c. Written scope sheet of special Tenant mechanical and electrical requirements and/or custom construction and finish requirements. d. Take-off sheet of building standard items shall be used.
Preliminary Drawings. (i) Due to the special nature of the Shopping Center, before Tenant’s architect prepares and submits any “Preliminary Drawings” (defined in subparagraph (ii) below) to Landlord, Tenant’s architect shall perform a field inspection of the conditions on-site and in and around the Premises. Preliminary Drawings and Final Drawings shall be prepared in accordance with the as-built condition of Landlord’s building shell. (ii) Within fifteen (15) days from the Lease Date, Tenant shall submit to Landlord’s representative CD-ROM with tenant plans in single pdf file format (pdf file to be “to- scale” / full size set) showing intended design character and finishes of the Premises (“Preliminary Drawings”). The Preliminary Drawings shall meet the requirements set forth in Schedule 3 attached to this Exhibit C. Once approval on the Preliminary Drawings has occurred pursuant to the procedures hereinafter described, Tenant shall promptly commence preparation of theFinal Working Drawings” in accordance with Section 3(b) below. (iii) Within fifteen (15) days after Landlord receives the Preliminary Drawings, Landlord’s representative will either approve the Preliminary Drawings or return to Tenant’s architect/designer one (1) set of prints of the Preliminary Drawings, marked either “Approved as Noted” or annotated with any required modifications. (iv) Subject to clauses (v), (vi) and (vii) immediately hereafter, if Landlord returns the Preliminary Drawings to Tenant “Approved as Noted,” Tenant’s architect shall incorporate Landlord’s modifications into the Final Working Drawings. (v) If Landlord returns the Preliminary Drawings to Tenant with required modifications, Tenant may object to such modifications by delivering Notice to Landlord within ten (10) days after Tenant’s architect/designer receives the required modifications. Unless Tenant delivers such Notice to Landlord, Tenant will be deemed to have accepted and approved all modifications. EXHIBIT C-1- (vi) If Landlord returns the Preliminary Drawings to Tenant with required modifications and Tenant does not deliver Notice of object to such modifications as provided above, Tenant shall revise the Preliminary Drawings and resubmit them to Landlord for approval within ten (10) days after Tenant’s architect/designer receives notice of the modifications. (vii) If Tenant delivers Notice of its objection to any required modifications as provided above, Landlord will discuss the objections with Tenant and will work with Tenan...
Preliminary Drawings. 1. Due to the special nature of the project, prior to preparing any drawings, Tenant shall participate in a kickoff/coordination meeting to discuss any special conditions that may affect the design of the Premises and to review the Tenant Criteria.
Preliminary Drawings. The term "Preliminary Drawings" shall mean the outline specifications and preliminary drawings prepared on behalf of Landlord and approved by Tenant for the Improvements to be constructed by Landlord which are described in attached EXHIBIT B-1.
Preliminary Drawings. Submit a set of preliminary drawings, plans and/or cross-sections to show schematic and conceptual plans and ideas for improvements which the bidder anticipates or intends to construct for the fit-out of the spaces which are assigned under the ConRac Agreement.
Preliminary Drawings. Within twenty (20) days after the date on which Landlord delivers the Design Package to Tenant, Tenant shall prepare and deliver to Landlord a preliminary drawing of Tenant's storefront.
Preliminary Drawings. [Under this heading, describe and attach drawings, floor plans, sketches of the proposed development.]
Preliminary Drawings. For the purposes of the MOA, the structures proposed for the University campus between 15th Avenue NE and Brooklyn Avenue NE and between NE Pacific Street and NE Boat Street are known collectively as the “Pacific Shaft.” A preliminary drawing defining allowable site boundaries of all above-grade features and all below-grade features of the Pacific Shaft, except the deep tunnel and platform features, will be depicted and submitted to the University on approximately May 1, 2000 or a date mutually agreed to by Sound Transit and the University. A drawing should be submitted depicting both construction areas and operational areas. The design plans and site boundary drawings will be submitted by Sound Transit and reviewed by the University pursuant to Article VII of this Agreement.
Preliminary Drawings. Provide two (2) copies and a PDF version of the Preliminary drawings. The Preliminary drawings shall contain the following sheets:  Cover Sheet – Note the index of Sheets indicating the anticipated drawing sheets shall be provided.  Survey Control Sheet – The Survey Control sheet shall include control points with Northing, Easting, Elevation, and Description with Station and Offset to the closest alignment. Horizontal alignments including beginning and end stations, and deflections and curve data. Combined ground to grid scale factor and Basis of Bearings.  Typical Sections  Legend  Property Layout and Land OwnershipPlan and Profile Sheets - Show existing and proposed utility mains, driveway locations, and proposed surfacing and drainage items, right-of-way takings and temporary easements. The utilities should be shown in profile as well. Design Criteria elements like profile grades, “K” values, vertical and horizontal curve data should be included.  Cross Sections with existing and proposed city utilities.  Special Details - Preliminary layouts for special/critical elements for example storm water quality features, special drainage structures, etc.  Plan sheets shall be prepared utilizing the latest City of Rapid City Drafting Standards. Use current City-provided drawing templates.  Plans should include separate bid schedules for individual projects.