Quarterly Site Status Sample Clauses

Quarterly Site Status. In summary, the activities and observations for this quarter consist of the following: • The Groundwater Remedy Optimization (GRO) system operated as planned during this quarter (maintenance was performed on the system that necessitated shutting the system down for brief periods during the reporting period) and pumped approximately 462,000 gallons of water from the AOA • The previous period’s Federal Facility Agreement (FFA) quarterly report was sent to EPA and UDEQ in July 2022 U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: July 1–September 30, 2022 Doc. No. 42768 • A Sixth Five-Year Review Report for Monticello Mill Tailings (USDOE) Site, San Juan County, Monticello, Utah (DOE 2022b) was submitted to the EPA and UDEQ in July • Weekly site inspections were performed by site personnel to verify the integrity of the site’s systems and monitor activities that might occur in supplemental standards properties (e.g., City of Monticello streets and utility corridors) • Site personnel performed monthly and quarterly site inspections in accordance with the LTS&M Plan • Routine surveillance did not note any anomalous conditions for the MVP remedy • Routine surveillance did not note any violations of MMTS institutional controls (IC’s) that restrict land and groundwater use • Routine surveillance did not note any anomalous conditions for the surface features of the disposal cell and Pond 4, the engineered solar evaporation pond • Routine surveillance noted no operational deficiencies for the Temporary Storage Facility (TSF) • LM and Legacy Management Support (LMS) personnel conducted a Facilities Information Management System property asset walkthrough on July 14, 2022 • The Million Gallon Sampling event was conducted on August 2, 2022 • LMS contractor performed the annual site inspection the week of September 5, 2022 • LM hosted a tour at the Monticello National Priorities List (NPL) sites by the International Atomic Energy Association on September 1, 2022
AutoNDA by SimpleDocs
Quarterly Site Status. A summary of the activities and observations for this quarter is as follows: • The Groundwater Remedy Optimization (GRO) system operated as planned during the current period. • Laboratory analytical results of the soil samples collected for the geochemical characterization in November 2018 were completed in March 2019. Data collected from the analyses will be used to determine the distribution of solid phase concentrations, which borehole soils will be used in the column tests, and which xxxxx’ water will be collected to U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: January 1–March 31, 2019 May 2019 Doc. No. S25044 help with the column tests. Additionally, the analytical results of the soil samples will be used in the ongoing development of the groundwater fate and transport model.‌ • Xxxxxxx surveillance noted no anomalous conditions for the MVP remedy. • Routine surveillance noted no violations of MMTS ICs regarding land- and groundwater-use restrictions. • Routine surveillance noted no anomalous conditions for the surface features of the disposal cell and Pond 4. • The volume of water pumped from the Pond 4 Leachate Collection and Removal System (LCRS) continued to exceed the action level for this quarter. LM has previously notified EPA and UDEQ of this Pond 4 action level exceedance. • Routine surveillance noted no operating deficiencies for the Temporary Storage Facility (TSF). • Accumulation of snow from winter storms left the site covered for all of this quarter. Accumulation of approximately 3 feet was common in the area and on the site.
Quarterly Site Status. An unplanned shutdown of the groundwater remedy optimization system occurred on December 1, 2015, due to a failed check valve in the groundwater transfer building. Design improvements and repairs were completed and phased system startup began on March 2, 2016. The treatment system resumed full-time, continuous operation on March 9, 2016. • As an atypical monitoring event, groundwater samples were collected in February and March 2016 from the AOA to assess uranium concentration rebounding during and after the unplanned shutdown of the groundwater remedy optimization system. • Xxxxxxx surveillance noted no anomalous conditions for the MVP remedy. • Routine surveillance noted no violations of MMTS ICs regarding land- and groundwater- use restrictions. U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: January—March 2016 April 2016 Doc. No. S14013 • Routine surveillance noted no anomalous conditions for the surface features of the disposal cell and Pond 4.‌‌‌ • Routine surveillance noted no operating deficiencies for the temporary storage facility (TSF).
Quarterly Site Status. Operation of the OU III contingency groundwater remedy optimization system began during this quarter. As described in Section 3.3.3, approximately 2 million gallons of groundwater was pumped from the alluvial aquifer in the Area of Attainment (AOA) and transmitted to Pond 4 for evaporative treatment. • Xxxxxxx surveillance noted no anomalous conditions for the MVP remedy. • Routine surveillance noted no anomalous conditions for the MMTS remedy. • Routine surveillance noted no anomalous conditions for the surface features of the disposal cell and Pond 4. • Routine surveillance noted no anomalous operating conditions for the repository Leachate Collection and Removal Systems (LCRS). • Operation of the OU III groundwater contingency remedy optimization system has resulted in increased water collection in the Pond 4 LCRS. The LCRS recirculation system is operating as intended and the action level leakage rate, as described in Section 3.4 of the LTS&M Plan, has not been exceeded. • Routine surveillance noted no anomalous operating conditions for the repository and Pond 4 Leak Detection Systems (LDS).
Quarterly Site Status. In summary, the activities and observations for this quarter consist of the following: • The Groundwater Remedy Optimization (GRO) system operated from January 1 to March 31 this quarter. The system pumped approximately 608,000 gallons of water from the AOA. • The previous period’s Federal Facility Agreement (FFA) quarterly report was sent to EPA and UDEQ in February 2024. • Weekly site inspections were performed by site personnel to verify the integrity of the site’s systems and monitor activities that might occur in supplemental standards properties (e.g., City of Monticello streets and utility corridors). • Site personnel performed monthly and quarterly site inspections in accordance with the LTS&M Plan. • Routine surveillance did not note any anomalous conditions for the MVP remedy. • Routine surveillance did not note any violations of MMTS ICs that restrict land and groundwater use. • Routine surveillance did not note any anomalous conditions for the surface features of the disposal cell and Pond 4, the engineered solar evaporation pond. • Routine surveillance noted no operational deficiencies for the Temporary Storage Facility (TSF).

Related to Quarterly Site Status

  • OUTCOME IF GRANTEE CANNOT COMPLETE REQUIRED PERFORMANCE Unless specified in this Statement of Work, if Grantee cannot complete or otherwise comply with a requirement included in this Statement of Work, HHSC, at its sole discretion, may impose remedies or sanctions outlined under Contract Attachment C, Local Mental Health Authority Special Conditions, Section 7.09 (Remedies and Sanctions).

  • Completion of Evaluation Cycle 1. The summative evaluation rating shall be based upon a preponderance of the evidence, assessed in a holistic manner, that is aligned to the Ohio Educator Standards. Only evidence gathered during the walkthroughs and formal observations that are conducted for the current school year may be used.

  • Examination of work before covering up In respect of the work which the Authority’s Engineer is entitled to examine, inspect, measure and/or test before it is covered up or put out of view or any part of the work is placed thereon, the Contractor shall give notice to the Authority’s Engineer whenever any such work is ready and before it is covered up. The Authority’s Engineer shall then either carry out the examination, inspection or testing without unreasonable delay, or promptly give notice to the Contractor that the Authority’s Engineer does not require to do so. Provided, however, that if any work is of a continuous nature where it is not possible or prudent to keep it uncovered or incomplete, the Contractor shall notify the schedule of carrying out such work to give sufficient opportunity, not being less than 3 (three) business days’ notice, to the Authority’s Engineer to conduct its inspection, measurement or test while the work is continuing. Provided further that in the event the Contractor receives no response from the Authority’s Engineer within a period of 3 (three) business days from the date on which the Contractor’s notice hereunder is delivered to the Authority’s Engineer, the Contractor shall be entitled to assume that the Authority’s Engineer would not undertake the said inspection.

  • CONTINUOUS IMPROVEMENT 3.1 The Supplier shall adopt a policy of continuous improvement in relation to the Services pursuant to which it will regularly review with the Authority the Services and the manner in which it is providing the Services with a view to reducing the Authority's costs (including the Framework Prices), the costs of Contracting Bodies and/or improving the quality and efficiency of the Services. The Supplier and the Authority will provide to each other any information which may be relevant to assisting the objectives of continuous improvement and in particular reducing costs.

  • Completion of Probationary Period An employee who has completed the probationary period may be suspended without pay or discharged only for cause. An employee who has completed the probationary period and is suspended without pay or discharged shall have access to the grievance procedure.

  • Substantial Completion Date Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 2022.

  • Modified Work/Return to Work Programs The Hospital and the Union recognize the purpose of modified work/return to work programs, is to provide fair and consistent practices for accommodating nurses who have been ill, injured or permanently disabled, to enable their early and safe return to work. The parties undertake to provide safe and meaningful employment for both permanently or temporarily disabled nurses based on the following principles:

  • Completion of Services (a) The Customer must:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!