Design Review Workshops Sample Clauses

Design Review Workshops. Prepare for and conduct design review workshop to review the design, construction cost, and schedule. The workshop will be one‐half day in duration and will be attended by project manager and key discipline leads.
AutoNDA by SimpleDocs
Design Review Workshops. Prepare for and conduct design review workshop to review the design, construction cost, and schedule. The workshop will be one‐half day in duration and will be attended by project manager and key discipline leads • 60% Design Drawings provided as one .PDF file. • Project specifications will include the City’s Division 0 specifications and Consultant’s standard Division 1 and Technical Specifications. All specifications will be provided in .PDF format. • Meeting materials and minutes. • Cost Estimate (Optional). • Review comments for the CM/GC Contractor’s OPCC and schedule. • Design drawings and specifications, as previously described. Drawings will be prepared in MicroStation. Carollo CAD standards will be used. • The City to provide a single, consolidated set of review comments for the 60% progress submittal.
Design Review Workshops. Prepare for and attend 60% and 90% design review workshop with City staff.  Complete technical review of the design submittal documents and provide one (1) compiled written set of comments for each submittal prior to the review meetings.  Standard front-end contract documents and specifications in MS Word format.  The 60% plan set will consist of up to 60 sheets. The 90% and final plan sets will consist of up to 83 sheets.  Plans will be developed at a 1”=20’ or 1”=10’ scale for site improvements and piping plan/profile and between ¼”=1’ and ½”=1’ scale for pump station and reservoir improvements and include details.  Instrumentation and control design will be completed by S&B, Inc. and will be paid for by the City under a separate agreement.  Arc flash studies are not included in this scope. This study will be addressed via specification and be a requirement of the construction contractor when equipment is known.  Technical specifications prepared by Murraysmith and subconsultants will be in MasterFormat 48 Division CSI format. Specifications will include the City’s front-end contract documents and general conditions.  Traffic control plans for construction will be prepared during design.  The opinion of construction cost will be formatted to reflect the items in the bid schedule and will be AACE Class 2 estimates.  City review period is assumed to be three (3) weeks for the 60% and 90% submittals.  The following workshops will be held at the City’s operations center and will be attended by up to three (3) Murraysmith staff. o 60% review workshop o 90% review workshop  Workshop agendas and meeting summariesSubmission of 60% and 90% design packages includes: o An electronic copy (PDF format) of the half size (11x17) plan set, specifications, and engineer’s opinion of probable construction cost, including MS Word documents of the specifications.  Submission of Final Bid-Ready package includes: o An electronic copy (PDF format) of plan set (11x17 and 22x34), specifications, and engineer’s opinion of probable construction cost, including MS Word documents of the specifications and design drawings in AutoCAD. Task 6 – Permitting

Related to Design Review Workshops

  • Design Review ‌ (a) Where so specified in Schedule A (Scope of Goods and Services) or as otherwise instructed by the City, the Supplier shall submit design-related Documentation for review by the City, and shall not proceed with work on the basis of such design Documentation until the City’s approval of such Documentation has been received in writing. (b) None of: (i) the submission of Documentation to the City by the Supplier; (ii) its examination by or on behalf of the City; or (iii) the making of any comment thereon (including any approval thereof) shall in any way relieve the Supplier of any of its obligations under this Agreement or of its duty to take reasonable steps to ensure the accuracy and correctness of such Documentation, and its suitability to the matter to which it relates.

  • Project Review A. Programmatic Allowances 1. If FEMA determines that the entire scope of an Undertaking conforms to one or more allowances in Appendix B of this Agreement, with determinations for Tier II Allowances being made by SOI-qualified staff, FEMA shall complete the Section 106 review process by documenting this determination in the project file, without SHPO review or notification. 2. If the Undertaking involves a National Historic Landmark (NHL), FEMA shall notify the SHPO, participating Tribe(s), and the NPS NHL Program Manager of the NPS Midwest Regional Office that the Undertaking conforms to one or more allowances. FEMA shall provide information about the proposed scope of work for the Undertaking and the allowance(s) enabling FEMA’s determination. 3. If FEMA determines any portion of an Undertaking’s scope of work does not conform to one or more allowances listed in Appendix B, FEMA shall conduct expedited or standard Section 106 review, as appropriate, for the entire Undertaking in accordance with Stipulation II.B, Expedited Review for Emergency Undertakings, or Stipulation II.C, Standard Project Review. 4. Allowances may be revised and new allowances may be added to this Agreement in accordance with Stipulation IV.A.3, Amendments. B. Expedited Review for Emergency Undertakings

  • REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Review Systems The Asset Representations Reviewer will maintain and utilize an electronic case management system to manage the Tests and provide systematic control over each step in the Review process and ensure consistency and repeatability among the Tests.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Review Scope The parties confirm that the Asset Representations Review is not responsible for (a) reviewing the Receivables for compliance with the representations and warranties under the Transaction Documents, except as described in this Agreement or (b) determining whether noncompliance with the representations and warranties constitutes a breach of the Eligibility Representations. For the avoidance of doubt, the parties confirm that the review is not designed to determine why an Obligor is delinquent or the creditworthiness of the Obligor, either at the time of any Asset Review or at the time of origination of the related Receivable. Further, the Asset Review is not designed to establish cause, materiality or recourse for any Test Fail (as defined in Section 3.05).

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.